other

Tunnel Options

Open the PDF Searchable (OCR) PDF

Page 1 of 2

Text read by OCR; check the PDF for anything that matters.
Pink route (Option 5, 1,000 FT) 10' trail installed adjacent to roadway, regrading for swale needed, block wall potentially needed. s ae 2 Rd Blue Route (Option 2, rts Ferry 125 FT) + i eet CR : , =| , \ 3o) 2 | POWERED BY Rove re eas, : : 78 Johnson County es

Sources

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.