contract agreement · J-1
J-1 - Miron Contract - Recreation Center - A133
Page 23 of 24
Text from the PDF text layer; check the PDF for anything that matters.include the Owner as an additional insured for claims caused in whole or in part by the Construction Manager’s
negligent acts or omissions. The additional insured coverage shall be primary and non-contributory to any of the
Owner’s insurance policies and shall apply to both ongoing and completed operations.
All liability policies shall include the Owner as an additional insured and shall include a Governmental Immunities
Endorsement pursuant to Chapter 670.4 of the Iowa Code, which endorsement shall include the following
provisions:
a. Nonwaiver of Government Immunity - The insurance carrier expressly agrees and states that the purchase of
this policy and including the Owner as an Additional Insured does not waive any of any defenses of governmental
immunity available to the Owner under Section 670.4 of the Code of Iowa (2025) as it may be amended from time
to time.
§ 14.3.1.8 The Construction Manager shall provide certificates of insurance to the Owner that evidence compliance
with the requirements in this Section 14.3.1.
§ 14.3.2 Construction Phase
After execution of the Guaranteed Maximum Price Amendment, the Owner and the Construction Manager shall
purchase and maintain insurance as set forth in AIA Document A133™–2019, Standard Form of Agreement
Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus
a Fee with a Guaranteed Maximum Price, Exhibit B, Insurance and Bonds, and elsewhere in the Contract
Documents.
§ 14.3.2.1 The Construction Manager shall provide bonds as set forth in AIA Document A133™–2019 Exhibit B,
and elsewhere in the Contract Documents.
§ 14.4 Notice in electronic format, pursuant to Article 1 of AIA Document A201–2017, may be given in accordance
with a building information modeling exhibit, if completed, or as otherwise set forth below:
(If other than in accordance with a building information modeling exhibit, insert requirements for delivering notice
in electronic format such as name, title, and email address of the recipient and whether and how the system will be
required to generate a read receipt for the transmission.)
« »
§ 14.5 Other provisions:
« »
ARTICLE 15 SCOPE OF THE AGREEMENT
§ 15.1 This Agreement represents the entire and integrated agreement between the Owner and the Construction
Manager and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement
may be amended only by written instrument signed by both Owner and Construction Manager.
§ 15.2 The following documents comprise the Agreement:
.1 AIA Document A133™–2019, Standard Form of Agreement Between Owner and Construction
Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a
Guaranteed Maximum Price
.2 AIA Document A133™-2019, Exhibit A, Guaranteed Maximum Price Amendment, if executed
.3 AIA Document A133™–2019, Exhibit B, Insurance and Bonds
.4 AIA Document A201™–2017, General Conditions of the Contract for Construction
.5 Building Information Modeling Exhibit, if completed:
« »
.6 Other Exhibits:
(Check all boxes that apply.)
[ « » ] AIA Document E234™–2019, Sustainable Projects Exhibit, Construction Manager as Constructor Edition,
dated as indicated below:
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American
Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This
draft was produced at 10:57:51 ET on 09/18/2024 under Order No.4104244063 which expires on 01/20/2025, is not for resale, is licensed for 23
one-time use only, and may only be used in accordance with the AIA Contract Documents ® Terms of Service. To report copyright violations, e-
mail [email protected].
User Notes: (3B9ADA45)
Sources
- sharepoint (J-1 - Miron Contract - Recreation Center - A133.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.