Text from the PDF text layer; check the PDF for anything that matters.§ 7.7 Other Costs and Emergencies
§ 7.7.1 Other costs incurred in the performance of the Work, with the Owner’s prior approval.
§ 7.7.2 Costs incurred in taking action to prevent threatened damage, injury, or loss, in case of an emergency
affecting the safety of persons and property, as provided in Article 10 of AIA Document A201–2017.
§ 7.7.3 Costs of repairing or correcting damaged or nonconforming Work executed by the Construction Manager,
Subcontractors, or suppliers, provided that such damaged or nonconforming Work was not caused by the negligence
of, or failure to fulfill a specific responsibility by, the Construction Manager, and only to the extent that the cost of
repair or correction is not recovered by the Construction Manager from insurance, sureties, Subcontractors,
suppliers, or others.
§ 7.7.4 The costs described in Sections 7.1 through 7.7 shall be included in the Cost of the Work, notwithstanding
any provision of AIA Document A201–2017 or other Conditions of the Contract which may require the
Construction Manager to pay such costs, unless such costs are excluded by the provisions of Section 7.9.
§ 7.8 Related Party Transactions
§ 7.8.1 For purposes of this Section 7.8, the term “related party” shall mean (1) a parent, subsidiary, affiliate, or other
entity having common ownership of, or sharing common management with, the Construction Manager; (2) any
entity in which any stockholder in, or management employee of, the Construction Manager holds an equity interest
in excess of ten percent in the aggregate; (3) any entity which has the right to control the business or affairs of the
Construction Manager; or (4) any person, or any member of the immediate family of any person, who has the right
to control the business or affairs of the Construction Manager.
§ 7.8.2 If any of the costs to be reimbursed arise from a transaction between the Construction Manager and a related
party, the Construction Manager shall notify the Owner of the specific nature of the contemplated transaction,
including the identity of the related party and the anticipated cost to be incurred, before any such transaction is
consummated or cost incurred. If the Owner, after such notification, authorizes the proposed transaction in writing,
then the cost incurred shall be included as a cost to be reimbursed, and the Construction Manager shall procure the
Work, equipment, goods, or service, from the related party, as a Subcontractor, according to the terms of Article 9.
If the Owner fails to authorize the transaction in writing, the Construction Manager shall procure the Work,
equipment, goods, or service from some person or entity other than a related party according to the terms of Article
9.
§ 7.9 Costs Not To Be Reimbursed
§ 7.9.1 The Cost of the Work shall not include the items listed below:
.1 Salaries and other compensation of the Construction Manager’s personnel stationed at the Construction
Manager’s principal office or offices other than the site office, except as specifically provided in
Section 7.2, or as may be provided in Article 14;
.2 Bonuses, profit sharing, incentive compensation, and any other discretionary payments, paid to anyone
hired by the Construction Manager or paid to any Subcontractor or vendor, unless the Owner has
provided prior approval;
.3 Expenses of the Construction Manager’s principal office and offices other than the site office;
.4 Overhead and general expenses, except as may be expressly included in Sections 7.1 to 7.7;
.5 The Construction Manager’s capital expenses, including interest on the Construction Manager’s capital
employed for the Work;
.6 Except as provided in Section 7.7.3 of this Agreement, costs due to the negligence of, or failure to
fulfill a specific responsibility of the Contract;
.7 Any cost not specifically and expressly described in Sections 7.1 to 7.7;
.8 Costs, other than costs included in Change Orders approved by the Owner, that would cause the
Guaranteed Maximum Price to be exceeded; and
.9 Costs for services incurred during the Preconstruction Phase.
ARTICLE 8 DISCOUNTS, REBATES, AND REFUNDS
§ 8.1 Cash discounts obtained on payments made by the Construction Manager shall accrue to the Owner if (1)
before making the payment, the Construction Manager included the amount to be paid, less such discount, in an
Application for Payment and received payment from the Owner, or (2) the Owner has deposited funds with the
AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American
Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This
draft was produced at 10:57:51 ET on 09/18/2024 under Order No.4104244063 which expires on 01/20/2025, is not for resale, is licensed for 15
one-time use only, and may only be used in accordance with the AIA Contract Documents ® Terms of Service. To report copyright violations, e-
mail [email protected].
User Notes: (3B9ADA45)
Sources
- sharepoint (J-1 - Miron Contract - Recreation Center - A133.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.