Project Representatives Separate Contractors, Definition of 4.2.10 6.1.1 Property Insurance Shop Drawings, Definition of 10.2.5, 11.2 3.12.1 Proposal Requirements Shop Drawings, Product Data and Samples 1.1.1 3.11, 3.12, 4.2.7 PROTECTION OF PERSONS AND PROPERTY Site, Use of 10 3.13, 6.1.1, 6.2.1 Regulations and Laws Site Inspections 1.5, 2.3.2, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 9.6.4, 9.9.1, 3.2.2, 3.3.3, 3.7.1, 3.7.4, 4.2, 9.9.2, 9.4.2, 9.10.1, 13.4 10.2.2, 13.1, 13.3, 13.4.1, 13.4.2, 13.5, 14, 15.2.8, Site Visits, Architect’s 15.4 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.4 Rejection of Work Special Inspections and Testing 4.2.6, 12.2.1 4.2.6, 12.2.1, 13.4 Releases and Waivers of Liens Specifications, Definition of 9.3.1, 9.10.2 1.1.6 Representations Specifications 3.2.1, 3.5, 3.12.6, 8.2.1, 9.3.3, 9.4.2, 9.5.1, 9.10.1 1.1.1, 1.1.6, 1.2.2, 1.5, 3.12.10, 3.17, 4.2.14 Representatives Statute of Limitations 2.1.1, 3.1.1, 3.9, 4.1.1, 4.2.10, 13.2.1 15.1.2, 15.4.1.1 Responsibility for Those Performing the Work Stopping the Work 3.3.2, 3.18, 4.2.2, 4.2.3, 5.3, 6.1.3, 6.2, 6.3, 9.5.1, 10 2.2.2, 2.4, 9.7, 10.3, 14.1 Retainage Stored Materials 9.3.1, 9.6.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3 6.2.1, 9.3.2, 10.2.1.2, 10.2.4 Review of Contract Documents and Field Subcontractor, Definition of Conditions by Contractor 5.1.1 3.2, 3.12.7, 6.1.3 SUBCONTRACTORS Review of Contractor’s Submittals by Owner and 5 Architect Subcontractors, Work by 3.10.1, 3.10.2, 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2 1.2.2, 3.3.2, 3.12.1, 3.18, 4.2.3, 5.2.3, 5.3, 5.4, Review of Shop Drawings, Product Data and 9.3.1.2, 9.6.7 Samples by Contractor Subcontractual Relations 3.12 5.3, 5.4, 9.3.1.2, 9.6, 9.10, 10.2.1, 14.1, 14.2.1 Rights and Remedies Submittals 1.1.2, 2.4, 2.5, 3.5, 3.7.4, 3.15.2, 4.2.6, 5.3, 5.4, 6.1, 3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.4, 9.2, 9.3, 6.3, 7.3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 12.2.1, 12.2.2, 9.8, 9.9.1, 9.10.2, 9.10.3 12.2.4, 13.3, 14, 15.4 Submittal Schedule Royalties, Patents and Copyrights 3.10.2, 3.12.5, 4.2.7 3.17 Subrogation, Waivers of Rules and Notices for Arbitration 6.1.1, 11.3 15.4.1 Substances, Hazardous Safety of Persons and Property 10.3 10.2, 10.4 Substantial Completion Safety Precautions and Programs 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 3.3.1, 4.2.2, 4.2.7, 5.3, 10.1, 10.2, 10.4 12.2, 15.1.2 Samples, Definition of Substantial Completion, Definition of 3.12.3 9.8.1 Samples, Shop Drawings, Product Data and Substitution of Subcontractors 3.11, 3.12, 4.2.7 5.2.3, 5.2.4 Samples at the Site, Documents and Substitution of Architect 3.11 2.3.3 Schedule of Values Substitutions of Materials 9.2, 9.3.1 3.4.2, 3.5, 7.3.8 Schedules, Construction Sub-subcontractor, Definition of 3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.6.2 5.1.2 Separate Contracts and Contractors Subsurface Conditions 1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 6, 8.3.1, 12.1.2 3.7.4 AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 15:45:01 ET on 01/14/2025 under Order 8 No.4104244063 which expires on 02/28/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail [email protected]. User Notes: (3B9ADA0D)

Sources

  • sharepoint (J-1 - Miron Contract - Recreation Center - A201.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.