City of Tiffin June 26, 2025 PROJECT UPDATE NORTH PARK ROAD IMPROVEMENTS – JAMES WATTERS Delays in the installation of the pedestrian tunnel have led to a change in staging. Stage 2 (the section between the Tiffin Elementary main entrance and Highway 6) has been approved to begin this summer. This schedule adjustment should allow for the paving of the proposed roundabout and all mainline and frontage road pavement south to Highway 6. Pavement south of the Tiffin Elementary School main entrance has been removed. Both school sites are now only accessible from the north via the Oak Hill main entrance. Traffic control appropriate for the closure at Highway 6 has been or will soon be applied. Access to both schools by the Fire Marshall is to be maintained throughout construction. Requirements for access have been conveyed to construction personnel. It is anticipated that when school resumes in August, access by car and bus to Tiffin Elementary will be open from the south and access by car to Oak Hill Elementary will be open from the north. When Stage 1A, 1B, and 2 (everything south of Oak Hill’s main entrance) is completed, Stage 3 may begin and access to all school entrances will be available from the south only. Damage to fiber lines, a handhole box, and two trees was reported by CCACSD staff. Efforts to address this damage are in progress. PROJECT UPDATE Page 2 of 4

Sources

Attached to agenda item: M Reports from City Personnel

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.