Draft chapter 90: Water Service System

§ 90.17 Completion By The City

The 2026 draft's § 90.17 beside the current code's § 90.16: removed words are struck through, added words underlined.

Comparison with a draft: not adopted. The archive holds no public hearing, ordinance or vote adopting the recodified Code through the October 20, 2026 meeting packet. Until one is adopted, every page here compares the consolidated code with a draft that can still change: the revised draft with the October 6 changes is not in the archive.

A comparison with the August 2026 draft recodification prepared by Iowa Codification for the City. The draft has not been adopted and can still change; the current code (unofficial compilation) governs until a recodified Code is adopted. Matches between sections are made by machine from the texts and are reviewed where uncertain.

Renumbered or moved citations or formatting only

What changed

Should any excavation be left open or only partly refilled for twenty-four (24) 24 hours after the water service pipe is installed and connected with the water system, or should the work be improperly done, the City shall have the right to finish or correct the work, and the Council shall assess the costs to the property owner or the plumber. If the plumber is assessed, the plumber must pay the costs before receiving another permit. If the property owner is assessed, such assessment may be collected with and in the same manner as general property taxes.
(Code of Iowa, Sec. 364.12[3a & h]) 364.12(3)(a) and (h))

Word-level comparison of the current text with the draft's; spacing and paragraph breaks come from the documents' text. Footnotes are left out.

Current code

§ 90.16 Completion By The City

Should any excavation be left open or only partly refilled for twenty-four (24) hours after the water service pipe is installed and connected with the water system, or should the work be improperly done, the City shall have the right to finish or correct the work, and the Council shall assess the costs to the property owner or the plumber. If the plumber is assessed, the plumber must pay the costs before receiving another permit. If the property owner is assessed, such assessment may be collected with and in the same manner as general property taxes.

(Code of Iowa, Sec. 364.12[3a & h])

2010 Code, Chapter 90 · source page

2026 draft

§ 90.17 Completion By The City

Should any excavation be left open or only partly refilled for 24 hours after the water service pipe is installed and connected with the water system, or should the work be improperly done, the City shall have the right to finish or correct the work, and the Council shall assess the costs to the property owner or the plumber. If the plumber is assessed, the plumber must pay the costs before receiving another permit. If the property owner is assessed, such assessment may be collected with and in the same manner as general property taxes.

(Code of Iowa, Sec. 364.12(3)(a) and (h))

August 2026 draft · page 191

Back to draft chapter 90 · All changes

Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.