Draft chapter 161: Post-construction Stormwater Runoff Control

§ 161.11 Maintenance And Repair Of Stormwater Bmps

The 2026 draft's § 161.11 beside the current code's § 161.11: removed words are struck through, added words underlined.

Comparison with a draft: not adopted. The archive holds no public hearing, ordinance or vote adopting the recodified Code through the October 20, 2026 meeting packet. Until one is adopted, every page here compares the consolidated code with a draft that can still change: the revised draft with the October 6 changes is not in the archive.

A comparison with the August 2026 draft recodification prepared by Iowa Codification for the City. The draft has not been adopted and can still change; the current code (unofficial compilation) governs until a recodified Code is adopted. Matches between sections are made by machine from the texts and are reviewed where uncertain.

Wording changed minor wording (96% same words)

What changed

1. The landowner or developer of every site subject to the provisions of this chapter will be responsible for maintaining as-built storm water stormwater BMPs in an effective state as determined in the sole judgment of the City for 25 years after completion of construction.
2. Prior to the issuance of any permit for development involving any storm water stormwater BMP, the landowner or developer must execute a storm water stormwater management easement for each BMP in a form acceptable to the City. The easement will provide for access to the BMP by the City for periodic inspection. The easement must be recorded at the expense of the landowner or developer.
3. Prior to the issuance of any development permit, the landowner or developer must execute a storm water stormwater BMP maintenance agreement in a form acceptable to the City that requires the landowner or developer to inspect and maintain each storm water stormwater BMP for a period of 25 years. The Maintenance and Repair Agreement must include but is not limited to the following:
A. Sediment Forebay.
(1) Install depth marker Depth Marker and monitor sediment build-up. Monitor Sediment Build-Up. Monitor and remove sediment after accumulation of 33% 33 percent of original depth.
(2) Remove trash and debris as needed.
(3) Inspect filter strip and re-seed or sod on a semi-annual basis.
(4) Based on inspection, plant an alternative grass species if the original grass cover has not been successfully established.
B. Pond.
(1) Prune and weed wildflower plantings Weed Wildflower Plantings as need. Needed. Inspect vegetation on a semi-annual basis. Corrective measures may include replanting any bare patches where vegetation has been unsuccessful or removed.
(2) Inspect for damage to the embankment, repair undercut or eroded areas, mow side slopes and remove litter and debris.
(3) Monitor sediment accumulation in the facility and remove sediment when the pond volume has been reduced by 25%. 25 percent.
(4) Examine to ensure that the inlet and outlet devices are free of debris and operational.
C. Overflow Spillway.
(1) Mow grass and maintain a height of 3-4 three to four inches.
(2) Inspect vegetation on a semi-annual basis and remove and replace if found dead or unhealthy.
(3) Inspect and correct grass alongside slopes for erosion and formation of rills, gullies, bank slumping and erosion.
(4) Remove sediment, grass, weeds weeds, and debris from erosion stone-rip-rap area on semi-annual basis.
In addition, the storm water stormwater BMP maintenance agreement must provide for assessment against all owners of property in the development should the storm water stormwater BMP not be maintained. In lieu of the assessment agreement, the landowner or developer may submit a maintenance bond for a period of 25 years.
4. In the event that the responsible party fails to maintain the storm water stormwater BMP, the City, upon 30 days written notice, may repair or cause to be repaired the storm water stormwater BMP to its proper working condition. After completion of the repair, the City will submit an invoice for the repair to the responsible party, who must pay said invoice within 30 days. In the event that the invoice is not paid, the City will either certify the amount to the County Treasurer for collection as contemplated in the storm water stormwater BMP maintenance agreement to be collected in the same manner as ordinary taxes. When applicable, the City may also commence proceedings against the surety for payment of the expenses.

Word-level comparison of the current text with the draft's; spacing and paragraph breaks come from the documents' text. Footnotes are left out.

Current code

§ 161.11 Maintenance And Repair Of Storm Water Bmps

1. The landowner or developer of every site subject to the provisions of this chapter will be responsible for maintaining as-built storm water BMPs in an effective state as determined in the sole judgment of the City for 25 years after completion of construction.

2. Prior to the issuance of any permit for development involving any storm water BMP, the landowner or developer must execute a storm water management easement for each BMP in a form acceptable to the City. The easement will provide for access to the BMP by the City for periodic inspection. The easement must be recorded at the expense of the landowner or developer.

3. Prior to the issuance of any development permit, the landowner or developer must execute a storm water BMP maintenance agreement in a form acceptable to the City that requires the landowner or developer to inspect and maintain each storm water BMP for a period of 25 years. The Maintenance and Repair Agreement must include but is not limited to the following:

A. Sediment Forebay.

(1) Install depth marker and monitor sediment build-up. Monitor and remove sediment after accumulation of 33% of original depth.

(2) Remove trash and debris as needed.

(3) Inspect filter strip and re-seed or sod on a semi-annual basis.

(4) Based on inspection, plant an alternative grass species if the original grass cover has not been successfully established.

B. Pond.

(1) Prune and weed wildflower plantings as need. Inspect vegetation on a semi-annual basis. Corrective measures may include replanting any bare patches where vegetation has been unsuccessful or removed.

(2) Inspect for damage to the embankment, repair undercut or eroded areas, mow side slopes and remove litter and debris.

(3) Monitor sediment accumulation in the facility and remove sediment when the pond volume has been reduced by 25%.

(4) Examine to ensure that the inlet and outlet devices are free of debris and operational.

C. Overflow Spillway.

(1) Mow grass and maintain a height of 3-4 inches.

(2) Inspect vegetation on a semi-annual basis and remove and replace if found dead or unhealthy.

(3) Inspect and correct grass alongside slopes for erosion and formation of rills, gullies, bank slumping and erosion.

(4) Remove sediment, grass, weeds and debris from erosion stone-rip-rap area on semi-annual basis.

In addition, the storm water BMP maintenance agreement must provide for assessment against all owners of property in the development should the storm water BMP not be maintained. In lieu of the assessment agreement, the landowner or developer may submit a maintenance bond for a period of 25 years.

4. In the event that the responsible party fails to maintain the storm water BMP, the City, upon 30 days written notice, may repair or cause to be repaired the storm water BMP to its proper working condition. After completion of the repair, the City will submit an invoice for the repair to the responsible party, who must pay said invoice within 30 days. In the event that the invoice is not paid, the City will either certify the amount to the County Treasurer for collection as contemplated in the storm water BMP maintenance agreement to be collected in the same manner as ordinary taxes. When applicable, the City may also commence proceedings against the surety for payment of the expenses.

Ord. 2012-313 · source page

2026 draft

§ 161.11 Maintenance And Repair Of Stormwater Bmps

1. The landowner or developer of every site subject to the provisions of this chapter will be responsible for maintaining as-built stormwater BMPs in an effective state as determined in the sole judgment of the City for 25 years after completion of construction.

2. Prior to the issuance of any permit for development involving any stormwater BMP, the landowner or developer must execute a stormwater management easement for each BMP in a form acceptable to the City. The easement will provide for access to the BMP by the City for periodic inspection. The easement must be recorded at the expense of the landowner or developer.

3. Prior to the issuance of any development permit, the landowner or developer must execute a stormwater BMP maintenance agreement in a form acceptable to the City that requires the landowner or developer to inspect and maintain each stormwater BMP for a period of 25 years. The Maintenance and Repair Agreement must include but is not limited to the following:

A. Sediment Forebay.

(1) Install Depth Marker and Monitor Sediment Build-Up. Monitor and remove sediment after accumulation of 33 percent of original depth.

(2) Remove trash and debris as needed.

(3) Inspect filter strip and re-seed or sod on a semi-annual basis.

(4) Based on inspection, plant an alternative grass species if the original grass cover has not been successfully established.

B. Pond.

(1) Prune and Weed Wildflower Plantings as Needed. Inspect vegetation on a semi-annual basis. Corrective measures may include replanting any bare patches where vegetation has been unsuccessful or removed.

(2) Inspect for damage to the embankment, repair undercut or eroded areas, mow side slopes and remove litter and debris.

(3) Monitor sediment accumulation in the facility and remove sediment when the pond volume has been reduced by 25 percent.

(4) Examine to ensure that the inlet and outlet devices are free of debris and operational.

C. Overflow Spillway.

(1) Mow grass and maintain a height of three to four inches.

(2) Inspect vegetation on a semi-annual basis and remove and replace if found dead or unhealthy.

(3) Inspect and correct grass alongside slopes for erosion and formation of rills, gullies, bank slumping and erosion.

(4) Remove sediment, grass, weeds, and debris from erosion stone-rip-rap area on semi-annual basis. In addition, the stormwater BMP maintenance agreement must provide for assessment against all owners of property in the development should the stormwater BMP not be maintained. In lieu of the assessment agreement, the landowner or developer may submit a maintenance bond for a period of 25 years.

4. In the event that the responsible party fails to maintain the stormwater BMP, the City, upon 30 days written notice, may repair or cause to be repaired the stormwater BMP to its proper working condition. After completion of the repair, the City will submit an invoice for the repair to the responsible party, who must pay said invoice within 30 days. In the event that the invoice is not paid, the City will either certify the amount to the County Treasurer for collection as contemplated in the stormwater BMP maintenance agreement to be collected in the same manner as ordinary taxes. When applicable, the City may also commence proceedings against the surety for payment of the expenses.