Draft chapter 100: Stormwater Utility
§ 100.05 Determination Of Stormwater Utility Charge
The 2026 draft's § 100.05 beside the current code's § 100.05: removed words are struck through, added words underlined.
Comparison with a draft: not adopted. The archive holds no public hearing, ordinance or vote adopting the recodified Code through the October 20, 2026 meeting packet. Until one is adopted, every page here compares the consolidated code with a draft that can still change: the revised draft with the October 6 changes is not in the archive.
A comparison with the August 2026 draft recodification prepared by Iowa Codification for the City. The draft has not been adopted and can still change; the current code (unofficial compilation) governs until a recodified Code is adopted. Matches between sections are made by machine from the texts and are reviewed where uncertain.
Wording changed wording changed (94% same words)
What changed
A. The
B. The
(1) The issuance of a
(2)
(3)
2. Nonresidential Property.
A. The
B. The
(1) The issuance of a
(2)
(3)
Word-level comparison of the current text with the draft's; spacing and paragraph breaks come from the documents' text. Footnotes are left out.
Current code
§ 100.05 Determination Of Storm Water Utility Charge
1. Residential Property.
A. The storm water utility charge for residential properties shall be $3.00 per month.
B. The storm water utility charge shall commence upon the earlier of the following:
(1) The issuance of a certificate of occupancy;
(2) Ninety (90) days after construction is halted, provided construction is at least 50% complete; or
(3) Ninety (90) days after construction is completed, even if a certificate of occupancy has not been issued for the property.
2. Nonresidential Property.
A. The storm water utility charge for nonresidential properties shall be $5.00 per month.
B. The storm water utility charge shall commence upon the earlier of the following:
(1) The issuance of a certificate of occupancy;
(2) Ninety (90) days after construction is halted, provided construction is at least 50% complete; or
(3) Ninety (90) days after construction is completed, even if a certificate of occupancy has not been issued for the property.
2026 draft
§ 100.05 Determination Of Stormwater Utility Charge
1. Residential Property.
A. The stormwater utility charge for residential properties shall be $3.00 per month.
B. The stormwater utility charge shall commence upon the earlier of the following:
(1) The issuance of a Certificate of Occupancy;
(2) 90 days after construction is halted, provided construction is at least 50 percent complete; or
(3) 90 days after construction is completed, even if a Certificate of Occupancy has not been issued for the property.
2. Nonresidential Property.
A. The stormwater utility charge for nonresidential properties shall be $5.00 per month.
B. The stormwater utility charge shall commence upon the earlier of the following:
(1) The issuance of a Certificate of Occupancy;
(2) 90 days after construction is halted, provided construction is at least 50 percent complete; or
(3) 90 days after construction is completed, even if a Certificate of Occupancy has not been issued for the property
Back to draft chapter 100 · All changes
Data last updated October 23, 2026. Built from the archive's documents; see how the data is built.