Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>ITEM NO.</th>
<th>CONTRACT ITEMS</th>
<th>UNIT</th>
<th>EST QTY</th>
<th>UNIT PRICE</th>
<th>CONTRACTOR'S BID PRICE</th>
<th colspan="2">Pay Period #10</th>
<th colspan="2">TOTAL TO DATE</th>
</tr>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th>QTY</th>
<th>AMOUNT</th>
<th>QTY</th>
<th>AMOUNT</th>
</tr>
<tr>
<td colspan="10">(NOTE: Items shown in BOLD are the ADDENDUM CHANGES)</td>
</tr>
<tr>
<td>1</td>
<td>CLEARING & GRUBBING</td>
<td>UNITS</td>
<td>337.80</td>
<td>$30.00</td>
<td>$10,734.00</td>
<td></td>
<td></td>
<td>307.80</td>
<td>$9,234.00</td>
</tr>
<tr>
<td>2</td>
<td>EXCAVATION, CLASS 10, ROADWAY AND BORROW</td>
<td>CY</td>
<td>5634.76</td>
<td>$13.50</td>
<td>$76,069.26</td>
<td>516.25</td>
<td>$6,969.38</td>
<td>5,634.76</td>
<td>$76,069.27</td>
</tr>
<tr>
<td>3</td>
<td>EXCAVATION, CLASS 10, WASTE</td>
<td>CY</td>
<td>4626.04</td>
<td>$12.50</td>
<td>$57,825.50</td>
<td>290.94</td>
<td>$3,636.75</td>
<td>4,626.04</td>
<td>$57,825.51</td>
</tr>
<tr>
<td>4</td>
<td>TOPSOIL, STRP, SALVAGE & RESPREAD</td>
<td>CY</td>
<td>1008.72</td>
<td>$33.00</td>
<td>$33,287.76</td>
<td>150.00</td>
<td>$4,950.00</td>
<td>889.91</td>
<td>$29,567.03</td>
</tr>
<tr>
<td>5</td>
<td>SUBGRADE PREPARATION</td>
<td>SY</td>
<td>9296.45</td>
<td>$2.00</td>
<td>$18,592.90</td>
<td>1,033.36</td>
<td>$2,066.72</td>
<td>9,296.36</td>
<td>$18,592.72</td>
</tr>
<tr>
<td>6</td>
<td>MODIFIED SUBBASE</td>
<td>CY</td>
<td>1579.47</td>
<td>$42.00</td>
<td>$66,337.74</td>
<td>337.78</td>
<td>$14,186.76</td>
<td>1,579.47</td>
<td>$66,337.74</td>
</tr>
<tr>
<td>7</td>
<td>SHOULDER FINISH, EARTH</td>
<td>STA</td>
<td>44.45</td>
<td>$300.00</td>
<td>$13,335.00</td>
<td>(24.55)</td>
<td>($7,365.00)</td>
<td>44.45</td>
<td>$13,335.00</td>
</tr>
<tr>
<td>8</td>
<td>REMOVAL OF KNOWN PIPE CULVERTS, MISC. SIZE AND TYPE</td>
<td>LF</td>
<td>1120.00</td>
<td>$15.00</td>
<td>$16,800.00</td>
<td>30.00</td>
<td>$450.00</td>
<td>1,517.00</td>
<td>$22,755.00</td>
</tr>
<tr>
<td>9</td>
<td>STORM SEWER, TRENCHED, 12 IN. DIA.</td>
<td>LF</td>
<td>168.50</td>
<td>$80.00</td>
<td>$13,480.00</td>
<td>58.50</td>
<td>$4,680.00</td>
<td>219.00</td>
<td>$18,160.00</td>
</tr>
<tr>
<td>10</td>
<td>STORM SEWER, TRENCHED, 15 IN. DIA.</td>
<td>LF</td>
<td>833.50</td>
<td>$80.00</td>
<td>$66,680.00</td>
<td></td>
<td></td>
<td>874.50</td>
<td>$69,960.00</td>
</tr>
<tr>
<td>11</td>
<td>STORM SEWER, TRENCHED, 18 IN. DIA.</td>
<td>LF</td>
<td>580.00</td>
<td>$100.00</td>
<td>$58,000.00</td>
<td></td>
<td></td>
<td>605.00</td>
<td>$60,500.00</td>
</tr>
<tr>
<td>12</td>
<td>STORM SEWER, TRENCHED, 24 IN. DIA.</td>
<td>LF</td>
<td>558.70</td>
<td>$145.00</td>
<td>$81,011.50</td>
<td></td>
<td></td>
<td>524.00</td>
<td>$75,980.00</td>
</tr>
<tr>
<td>13</td>
<td>PIPE APRON, RCP, 24 IN.</td>
<td>EACH</td>
<td>1.00</td>
<td>$2,950.00</td>
<td>$2,950.00</td>
<td></td>
<td></td>
<td>1.00</td>
<td>$2,950.00</td>
</tr>
<tr>
<td>14</td>
<td>PIPE APRON GUARD</td>
<td>EACH</td>
<td>1.00</td>
<td>$1,400.00</td>
<td>$1,400.00</td>
<td></td>
<td></td>
<td>1.00</td>
<td>$1,400.00</td>
</tr>
<tr>
<td>15</td>
<td>SUBDRAIN, PERFORATED PLASTIC PIPE, 4 IN. DIA.</td>
<td>LF</td>
<td>2994.00</td>
<td>$19.50</td>
<td>$58,383.00</td>
<td>510.00</td>
<td>$9,945.00</td>
<td>3,592.00</td>
<td>$70,944.00</td>
</tr>
<tr>
<td>16</td>
<td>SUBDRAIN OUTLET, CMP, 4 IN. DIA</td>
<td>EACH</td>
<td>28.00</td>
<td>$250.00</td>
<td>$7,000.00</td>
<td>4.00</td>
<td>$1,000.00</td>
<td>38.00</td>
<td>$8,000.00</td>
</tr>
<tr>
<td>17</td>
<td>SUBDRAIN CLEANOUT, TYPE B, 24-INCH</td>
<td>EACH</td>
<td>4.00</td>
<td>$1,250.00</td>
<td>$5,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>18</td>
<td>WATERMAIN, TRENCHED, DR-18 PVC, 6 IN. DIA.</td>
<td>LF</td>
<td>819.00</td>
<td>$55.00</td>
<td>$45,045.00</td>
<td></td>
<td></td>
<td>459.00</td>
<td>$25,245.00</td>
</tr>
<tr>
<td>19</td>
<td>WATERMAIN, TRENCHED, DR-18 PVC, 4 IN. DIA.</td>
<td>LF</td>
<td>11.00</td>
<td>$85.00</td>
<td>$935.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>20</td>
<td>WATERMAIN, TRENCHLESS, DR-18 PVC, 6 IN. DIA.</td>
<td>LF</td>
<td>329.00</td>
<td>$70.00</td>
<td>$23,030.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>21</td>
<td>FITTINGS, MJ, DIP, 6 IN. DIA.</td>
<td>EACH</td>
<td>40.00</td>
<td>$400.00</td>
<td>$16,000.00</td>
<td></td>
<td></td>
<td>15.00</td>
<td>$6,000.00</td>
</tr>
<tr>
<td>22</td>
<td>FITTINGS, MJ, DIP, 12 IN. DIA.</td>
<td>EACH</td>
<td>2.00</td>
<td>$1,000.00</td>
<td>$2,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>23</td>
<td>WATER SERVICE PIPE, TYPE K COPPER, 1 IN. DIA.</td>
<td>LF</td>
<td>239.00</td>
<td>$23.00</td>
<td>$5,497.00</td>
<td></td>
<td></td>
<td>30.00</td>
<td>$690.00</td>
</tr>
<tr>
<td>24</td>
<td>WATER SERVICE CORPORATION, 1 IN. DIA.</td>
<td>EACH</td>
<td>4.00</td>
<td>$450.00</td>
<td>$1,800.00</td>
<td></td>
<td></td>
<td>1.00</td>
<td>$500.00</td>
</tr>
<tr>
<td>25</td>
<td>WATER SERVICE CURB STOP AND BOX, 1 IN. DIA.</td>
<td>EACH</td>
<td>4.00</td>
<td>$500.00</td>
<td>$2,000.00</td>
<td></td>
<td></td>
<td>1.00</td>
<td>$500.00</td>
</tr>
<tr>
<td>26</td>
<td>GATE VALVE, MJ, 6 IN. DIA.</td>
<td>EACH</td>
<td>10.00</td>
<td>$1,900.00</td>
<td>$19,000.00</td>
<td></td>
<td></td>
<td>5.00</td>
<td>$9,500.00</td>
</tr>
<tr>
<td>27</td>
<td>GATE VALVE, MJ, 6 IN. DIA.</td>
<td>EACH</td>
<td>1.00</td>
<td>$4,350.00</td>
<td>$4,350.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>28</td>
<td>FIRE HYDRANT ASSEMBLY, WM-201</td>
<td>EACH</td>
<td>1.00</td>
<td>$7,800.00</td>
<td>$7,800.00</td>
<td></td>
<td></td>
<td>1.00</td>
<td>$7,800.00</td>
</tr>
<tr>
<td>29</td>
<td>VALVE BOX EXTENSION/ADJUSTMENT</td>
<td>EACH</td>
<td>10.00</td>
<td>$500.00</td>
<td>$5,000.00</td>
<td></td>
<td></td>
<td>7.00</td>
<td>$3,500.00</td>
</tr>
<tr>
<td>30</td>
<td>FIRE HYDRANT ADJUSTMENT</td>
<td>EACH</td>
<td>1.00</td>
<td>$1,850.00</td>
<td>$1,850.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>31</td>
<td>WATERMAIN CONFLICTS</td>
<td>EACH</td>
<td>7.00</td>
<td>$5,300.00</td>
<td>$38,100.00</td>
<td></td>
<td></td>
<td>4.00</td>
<td>$22,000.00</td>
</tr>
<tr>
<td>32</td>
<td>WATERMAIN REMOVALS</td>
<td>LS</td>
<td>1.00</td>
<td>$1,000.00</td>
<td>$1,000.00</td>
<td></td>
<td></td>
<td>0.50</td>
<td>$500.00</td>
</tr>
<tr>
<td>33</td>
<td>MANHOLE, SW-401, 48 IN.</td>
<td>EACH</td>
<td>3.00</td>
<td>$4,750.00</td>
<td>$14,250.00</td>
<td></td>
<td></td>
<td>2.00</td>
<td>$9,500.00</td>
</tr>
<tr>
<td>34</td>
<td>MANHOLE, SW-401, 60 IN.</td>
<td>EACH</td>
<td>1.00</td>
<td>$3,500.00</td>
<td>$3,500.00</td>
<td></td>
<td></td>
<td>2.00</td>
<td>$11,000.00</td>
</tr>
<tr>
<td>35</td>
<td>INTAKE, SW-501</td>
<td>EACH</td>
<td>27.00</td>
<td>$3,800.00</td>
<td>$102,600.00</td>
<td></td>
<td></td>
<td>24.00</td>
<td>$91,200.00</td>
</tr>
<tr>
<td>36</td>
<td>INTAKE, SW-501, MODIFIED</td>
<td>EACH</td>
<td>3.00</td>
<td>$2,650.00</td>
<td>$16,950.00</td>
<td></td>
<td></td>
<td>3.00</td>
<td>$16,950.00</td>
</tr>
<tr>
<td>37</td>
<td>INTAKE, SW-507</td>
<td>EACH</td>
<td>1.00</td>
<td>$5,000.00</td>
<td>$5,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>38</td>
<td>INTAKE, SW-512</td>
<td>EACH</td>
<td>2.00</td>
<td>$1,350.00</td>
<td>$2,700.00</td>
<td></td>
<td></td>
<td>4.00</td>
<td>$5,400.00</td>
</tr>
<tr>
<td>39</td>
<td>MANHOLE ADJUSTMENT, MINOR</td>
<td>EACH</td>
<td>7.00</td>
<td>$3,500.00</td>
<td>$24,500.00</td>
<td></td>
<td></td>
<td>7.00</td>
<td>$3,500.00</td>
</tr>
<tr>
<td>40</td>
<td>INTAKE ADJUSTMENT, MINOR</td>
<td>EACH</td>
<td>2.00</td>
<td>$750.00</td>
<td>$1,500.00</td>
<td>2.00</td>
<td>$1,500.00</td>
<td>2.00</td>
<td>$1,500.00</td>
</tr>
<tr>
<td>41</td>
<td>REMOVE INTAKE</td>
<td>EACH</td>
<td>10.00</td>
<td>$750.00</td>
<td>$7,500.00</td>
<td></td>
<td></td>
<td>9.00</td>
<td>$6,750.00</td>
</tr>
<tr>
<td>42</td>
<td>PATCHES, FULL DEPTH FINISH, BY COUNT</td>
<td>EACH</td>
<td>10.00</td>
<td>$100.00</td>
<td>$1,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>43</td>
<td>PATCHES, FULL DEPTH FINISH, BY COUNT</td>
<td>SY</td>
<td>111.00</td>
<td>$200.00</td>
<td>$22,200.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>44</td>
<td>SUBBAS (PATCHES)</td>
<td>SY</td>
<td>111.00</td>
<td>$40.00</td>
<td>$4,440.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>45</td>
<td>PAVEMENT, PCC, CLASS C, 3 DURABILITY 9 IN. THICK</td>
<td>SY</td>
<td>1794.20</td>
<td>$78.00</td>
<td>$139,947.60</td>
<td>689.35</td>
<td>$33,769.30</td>
<td>1,794.42</td>
<td>$139,946.76</td>
</tr>
<tr>
<td>46</td>
<td>PAVEMENT, PCC, CLASS C, 3 DURABILITY 6 IN. THICK</td>
<td>SY</td>
<td>1549.80</td>
<td>$57.00</td>
<td>$88,338.60</td>
<td>1,931.20</td>
<td>$110,057.00</td>
<td></td>
<td></td>
</tr>
<tr>
<td>47</td>
<td>PAVEMENT, BRICK/FAVER INLAY</td>
<td>SY</td>
<td>657.70</td>
<td>$71.00</td>
<td>$46,696.70</td>
<td>163.85</td>
<td>$11,633.35</td>
<td>657.70</td>
<td>$46,696.70</td>
</tr>
<tr>
<td>48</td>
<td>BITUMINOUS BEDDING COURSE</td>
<td>SY</td>
<td>657.70</td>
<td>$29.90</td>
<td>$19,665.23</td>
<td></td>
<td></td>
<td>657.70</td>
<td>$19,665.24</td>
</tr>
<tr>
<td>49</td>
<td>CURB AND GUTTER, 36 IN. WIDE, 9 IN. THICK</td>
<td>LF</td>
<td>3533.40</td>
<td>$32.70</td>
<td>$115,542.18</td>
<td>292.00</td>
<td>$9,548.40</td>
<td>3,834.00</td>
<td>$115,561.80</td>
</tr>
<tr>
<td>50</td>
<td>PAVEMENT, HMA, STANDARD TRAFFIC, 5 IN. THICK</td>
<td>SY</td>
<td>4805.30</td>
<td>$45.90</td>
<td>$220,563.27</td>
<td></td>
<td></td>
<td>3,596.89</td>
<td>$165,097.25</td>
</tr>
<tr>
<td>51</td>
<td>FULL DEPTH RECLAMATION</td>
<td>SY</td>
<td>6203.10</td>
<td>$4.50</td>
<td>$27,913.95</td>
<td></td>
<td></td>
<td>6,449.76</td>
<td>$29,023.93</td>
</tr>
<tr>
<td>52</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>971.00</td>
<td>$9.00</td>
<td>$8,739.00</td>
<td>246.40</td>
<td>$2,217.60</td>
<td>993.36</td>
<td>$9,942.24</td>
</tr>
<tr>
<td>53</td>
<td>REMOVAL OF DRIVEWAY</td>
<td>SY</td>
<td>489.00</td>
<td>$9.00</td>
<td>$4,401.00</td>
<td>251.73</td>
<td>$2,265.57</td>
<td>1,145.49</td>
<td>$10,309.41</td>
</tr>
<tr>
<td>54</td>
<td>REMOVAL OF PAVEMENT</td>
<td>SY</td>
<td>800.00</td>
<td>$9.00</td>
<td>$7,200.00</td>
<td>292.05</td>
<td>$2,628.45</td>
<td>804.85</td>
<td>$7,243.65</td>
</tr>
<tr>
<td>55</td>
<td>SIDEWALK, PCC, 4 IN.</td>
<td>SY</td>
<td>1221.30</td>
<td>$50.70</td>
<td>$61,919.91</td>
<td>323.95</td>
<td>$16,424.27</td>
<td>821.24</td>
<td>$41,636.87</td>
</tr>
<tr>
<td>56</td>
<td>SIDEWALK, PCC, 6 IN.</td>
<td>SY</td>
<td>801.60</td>
<td>$80.00</td>
<td>$64,128.00</td>
<td>31.43</td>
<td>$2,514.40</td>
<td>813.03</td>
<td>$24,830.40</td>
</tr>
<tr>
<td>57</td>
<td>COMBINED SIDEWALK AND RETAINING WALL</td>
<td>CY</td>
<td>82.10</td>
<td>$275.00</td>
<td>$22,577.50</td>
<td></td>
<td></td>
<td>88.16</td>
<td>$24,244.00</td>
</tr>
<tr>
<td>58</td>
<td>CONCRETE STEPS</td>
<td>SF</td>
<td>72.00</td>
<td>$150.00</td>
<td>$10,800.00</td>
<td></td>
<td></td>
<td>82.00</td>
<td>$12,300.00</td>
</tr>
<tr>
<td>59</td>
<td>DETECTABLE WARNING</td>
<td>SF</td>
<td>374.00</td>
<td>$47.25</td>
<td>$17,671.50</td>
<td>50.00</td>
<td>$2,362.50</td>
<td>200.00</td>
<td>$9,450.00</td>
</tr>
<tr>
<td>60</td>
<td>DRIVEWAY, PAVED, PCC, 6 IN.</td>
<td>SY</td>
<td>727.00</td>
<td>$74.40</td>
<td>$54,088.80</td>
<td>109.30</td>
<td>$8,131.92</td>
<td>723.39</td>
<td>$53,820.21</td>
</tr>
</table>
<table>
<tr>
<th>Item</th>
<th>Unit</th>
<th>Qty</th>
<th>Unit Price</th>
<th>Ext. Price</th>
<th>Subtotal</th>
<th>Amount Earned</th>
</tr>
<tr><td>52</td><td>REMOVAL OF SIDEWALK</td><td>SY</td><td>971.00</td><td>$9.00</td><td>$8,739.00</td><td>246.40</td><td>2,217.60</td><td>993.36</td><td>$ 8,940.24</td></tr>
<tr><td>53</td><td>REMOVAL OF DRIVEWAY</td><td>SY</td><td>489.00</td><td>$9.00</td><td>$4,401.00</td><td>251.73</td><td>2,265.57</td><td>1,145.49</td><td>$ 10,309.41</td></tr>
<tr><td>54</td><td>REMOVAL OF PAVEMENT</td><td>SY</td><td>800.00</td><td>$9.00</td><td>$7,200.00</td><td>292.05</td><td>2,628.45</td><td>804.85</td><td>$ 7,243.65</td></tr>
<tr><td>55</td><td>SIDEWALK, PCC, 4 IN.</td><td>SY</td><td>1221.30</td><td>$50.70</td><td>$61,919.91</td><td>323.95</td><td>16,424.27</td><td>821.24</td><td>$ 41,636.87</td></tr>
<tr><td>56</td><td>SIDEWALK, PCC, 6 IN.</td><td>SY</td><td>801.60</td><td>$80.00</td><td>$64,128.00</td><td>31.43</td><td>2,514.40</td><td>310.38</td><td>$ 24,830.40</td></tr>
<tr><td>57</td><td>COMBINED SIDEWALK, AND RETAINING WALL</td><td>CY</td><td>82.10</td><td>$275.00</td><td>$22,577.50</td><td>-</td><td>-</td><td>88.16</td><td>$ 24,244.00</td></tr>
<tr><td>58</td><td>CONCRETE STEPS</td><td>SF</td><td>72.00</td><td>$150.00</td><td>$10,800.00</td><td>-</td><td>-</td><td>82.00</td><td>$ 12,300.00</td></tr>
<tr><td>59</td><td>DETECTABLE WARNING</td><td>SF</td><td>374.00</td><td>$47.25</td><td>$17,671.50</td><td>50.00</td><td>2,362.50</td><td>200.00</td><td>$ 9,450.00</td></tr>
<tr><td>60</td><td>DRIVEWAY, PAVED, PCC, 6 IN.</td><td>SY</td><td>727.00</td><td>$74.40</td><td>$54,088.80</td><td>109.30</td><td>8,131.92</td><td>723.39</td><td>$ 53,820.21</td></tr>
<tr><td>61</td><td>DRIVEWAY, GRANULAR</td><td>TON</td><td>34.00</td><td>$31.00</td><td>$1,054.00</td><td>-</td><td>-</td><td>18.06</td><td>$ 559.86</td></tr>
<tr><td>62</td><td>SLOPE PROTECTION, WOOD EXCELSIOR MAT</td><td>SQ</td><td>7.00</td><td>$100.00</td><td>$700.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>63</td><td>STABILIZING CROP SEEDING, FERTILIZING, (URBAN)</td><td>ACRE</td><td>0.50</td><td>$1,500.00</td><td>$750.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>64</td><td>CONVENTIONAL SEEDING, SEEDING, FERT. AND MULCHING</td><td>ACRE</td><td>1.25</td><td>$3,500.00</td><td>$4,375.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>65</td><td>PERIMETER+SLOPE SEDIMENT CONTROL DEVICE 9 INCH</td><td>LF</td><td>300.00</td><td>$3.00</td><td>$900.00</td><td>-</td><td>-</td><td>575.00</td><td>$ 1,725.00</td></tr>
<tr><td>66</td><td>PERIMETER+SLOPE SEDIMENT CONTROL DEVICE 12 INCH</td><td>LF</td><td>300.00</td><td>$4.00</td><td>$1,200.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>67</td><td>REMOVE PERIMETER+SLOPE SEDIMENT CONTROL DEVICE</td><td>LF</td><td>600.00</td><td>$9.50</td><td>$5,700.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>68</td><td>REVETMENT, CLASS D</td><td>TON</td><td>20.00</td><td>$60.00</td><td>$1,200.00</td><td>-</td><td>-</td><td>11.24</td><td>$ 674.40</td></tr>
<tr><td>69</td><td>EROSION STONE</td><td>TON</td><td>5.00</td><td>$120.00</td><td>$600.00</td><td>-</td><td>-</td><td>8.31</td><td>$ 997.20</td></tr>
<tr><td>70</td><td>SWPPP MANAGEMENT</td><td>LS</td><td>1.00</td><td>$6,300.00</td><td>$6,300.00</td><td>0.10</td><td>630.00</td><td>0.80</td><td>$ 5,040.00</td></tr>
<tr><td>71</td><td>MOBILIZATION</td><td>LS</td><td>1.00</td><td>$135,000.00</td><td>$135,000.00</td><td>-</td><td>-</td><td>1.00</td><td>$ 135,000.00</td></tr>
<tr><td>72</td><td>TRAFFIC CONTROL</td><td>LS</td><td>1.00</td><td>$15,000.00</td><td>$15,000.00</td><td>-</td><td>-</td><td>0.90</td><td>$ 13,500.00</td></tr>
<tr><td>73</td><td>RELOCATION OF MAILBOXES</td><td>EACH</td><td>8.00</td><td>$375.00</td><td>$3,000.00</td><td>-</td><td>-</td><td>6.00</td><td>$ 2,250.00</td></tr>
<tr><td>74</td><td>REMOVAL OF SIGNS</td><td>EACH</td><td>29.00</td><td>$50.00</td><td>$1,450.00</td><td>4.00</td><td>200.00</td><td>24.00</td><td>$ 1,200.00</td></tr>
<tr><td>75</td><td>REMOVE AND REINSTALL SIGNS</td><td>EACH</td><td>17.00</td><td>$150.00</td><td>$2,550.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>76</td><td>TYPE A SIGNS</td><td>SF</td><td>95.05</td><td>$20.00</td><td>$1,901.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>77</td><td>STEEL POSTS FOR TYPE A SIGNS</td><td>LF</td><td>728.00</td><td>$13.00</td><td>$9,464.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>78</td><td>LIGHT POLES</td><td>EACH</td><td>12.00</td><td>$3,200.00</td><td>$38,400.00</td><td>4.00</td><td>12,800.00</td><td>10.00</td><td>$ 32,000.00</td></tr>
<tr><td>79</td><td>ELECTRICAL CIRCUITS</td><td>LF</td><td>2237.00</td><td>$15.00</td><td>$33,555.00</td><td>692.00</td><td>10,380.00</td><td>1,838.00</td><td>$ 27,570.00</td></tr>
<tr><td>80</td><td>HANDHOLES AND JUNCTION BOXES</td><td>EACH</td><td>5.00</td><td>$1,000.00</td><td>$5,000.00</td><td>2.00</td><td>2,000.00</td><td>4.00</td><td>$ 4,000.00</td></tr>
<tr><td>81</td><td>PAINTED PAV'T MARKS, WATERBORNE/SOLVENT BASED</td><td>STA</td><td>57.44</td><td>$130.00</td><td>$5,616.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>82</td><td>PAINTED PAV'T SYMBOLS, WATERBORNE/SOLVENT BASED</td><td>EACH</td><td>3.00</td><td>$133.00</td><td>$399.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>83</td><td>REMOVAL OF FENCE, CHAIN LINK</td><td>LF</td><td>106.00</td><td>$15.00</td><td>$1,590.00</td><td>-</td><td>-</td><td>-</td><td>$ -</td></tr>
<tr><td>84</td><td>SPOT REPAIRS, SANITARY SEWER, BY COUNT</td><td>EACH</td><td>1.00</td><td>$250.00</td><td>$250.00</td><td>-</td><td>-</td><td>3.00</td><td>$ 750.00</td></tr>
<tr><td>85</td><td>SPOT REPAIRS, SANITARY SEWER, BY LINEAR FOOT</td><td>LF</td><td>15.00</td><td>$400.00</td><td>$6,000.00</td><td>-</td><td>-</td><td>61.00</td><td>$ 24,400.00</td></tr>
<tr><th colspan="7">TOTAL OF THE BASE BID (Total of Items 1-85):</th><th colspan="2">$2,134,856.90</th><th colspan="2">$ 179,525.37</th><th colspan="2">$1,891,423.19</th></tr>
<tr>
<th>CO1</th>
<td>6-Inch Subgrade Stabilization</td>
<td>CY</td>
<td>346.00</td>
<td>$75.00</td>
<td>$25,950.00</td>
<td>$ -</td>
<td>412.31</td>
<td>$ 30,923.25</td>
</tr>
<tr>
<th></th>
<td>Polymer Grid Subgrade Stabilization</td>
<td>SY</td>
<td>2,077.11</td>
<td>$3.50</td>
<td>$7,269.89</td>
<td>$ -</td>
<td>3,253.20</td>
<td>$ 11,386.21</td>
</tr>
<tr>
<th></th>
<td>Utility Conflict Delay</td>
<td>HR</td>
<td>8.00</td>
<td>$450.00</td>
<td>$3,600.00</td>
<td>$ -</td>
<td>8.00</td>
<td>$ 3,600.00</td>
</tr>
<tr>
<th>CO2</th>
<td>Additional tree removal</td>
<td>LS</td>
<td>1.00</td>
<td>$7,800.00</td>
<td>$7,800.00</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 7,800.00</td>
</tr>
<tr>
<th></th>
<td>Fire Hydrant Extension</td>
<td>LS</td>
<td>1.00</td>
<td>$1,500.00</td>
<td>$1,500.00</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 1,500.00</td>
</tr>
<tr>
<th></th>
<td>Addition Concrete 107 Third Street</td>
<td>LS</td>
<td>1.00</td>
<td>$1,200.00</td>
<td>$1,200.00</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 1,200.00</td>
</tr>
<tr>
<th></th>
<td>Additional Drainable Backfill for Wall</td>
<td>LF</td>
<td>440.00</td>
<td>$22.50</td>
<td>$9,900.00</td>
<td>$ -</td>
<td>440.00</td>
<td>$ 9,900.00</td>
</tr>
<tr>
<th>CO3</th>
<td>Remove and replace Retaining Wall 330 Summerhays</td>
<td>LS</td>
<td>1.00</td>
<td>$1,450.00</td>
<td>$1,450.00</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 1,450.00</td>
</tr>
<tr>
<th></th>
<td>Lower Existing Water Line 331 Summerhays</td>
<td>LS</td>
<td>1.00</td>
<td>$3,250.00</td>
<td>$3,250.00</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 3,250.00</td>
</tr>
<tr>
<th></th>
<td>Winter Stabilization Mulch</td>
<td>LS</td>
<td>1.00</td>
<td>$1,100.00</td>
<td>$1,100.00</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 1,100.00</td>
</tr>
<tr>
<th>CO4</th>
<td>Watermain Conflict, 8-inch</td>
<td>LS</td>
<td>1.00</td>
<td>$6,930.00</td>
<td>$6,930.00</td>
<td>$ -</td>
<td>2.00</td>
<td>$ 13,860.00</td>
</tr>
<tr>
<th></th>
<td>Water Service Abandonment 1-inch</td>
<td>LS</td>
<td>1.00</td>
<td>$2,100.00</td>
<td>$2,100.00</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 2,100.00</td>
</tr>
<tr>
<th></th>
<td>Water Service Abandonment 2-inch</td>
<td>LS</td>
<td>1.00</td>
<td>$2,100.00</td>
<td>$2,100.00</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 2,100.00</td>
</tr>
<tr>
<th></th>
<td>Sewer Service Abandonment</td>
<td>LS</td>
<td>1.00</td>
<td>$1,200.00</td>
<td>$1,200.00</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 1,200.00</td>
</tr>
<tr>
<th></th>
<td>SW-501 Intake (Mod.)</td>
<td>EACH</td>
<td>1.00</td>
<td>$6,743.40</td>
<td>$6,743.40</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 6,743.40</td>
</tr>
<tr>
<th>CO5</th>
<td>Water Service 6-inch</td>
<td>EACH</td>
<td>1.00</td>
<td>$10,807.49</td>
<td>$10,807.49</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 10,807.49</td>
</tr>
<tr>
<th></th>
<td>Storm Sewer Service 8-inch</td>
<td>EACH</td>
<td>2.00</td>
<td>$2,100.00</td>
<td>$4,200.00</td>
<td>$ -</td>
<td>1.00</td>
<td>$ 2,100.00</td>
</tr>
<tr>
<th>CO6</th>
<td>Additional 6-inch Subgrade Stabilization</td>
<td>CY</td>
<td>50.00</td>
<td>$75.00</td>
<td>$3,750.00</td>
<td>$ -</td>
<td>50.00</td>
<td>$ 3,750.00</td>
</tr>
<tr>
<th></th>
<td>Additional Polymer Grid Subgrade Stabilization</td>
<td>SY</td>
<td>300.00</td>
<td>$3.50</td>
<td>$1,050.00</td>
<td>$ -</td>
<td>300.00</td>
<td>$ 1,050.00</td>
</tr>
<tr>
<th>CO7</th>
<td>Additional 6-inch Subgrade Stabilization</td>
<td>CY</td>
<td>85.56</td>
<td>$75.00</td>
<td>$6,417.00</td>
<td>$ -</td>
<td>68.62</td>
<td>$ 5,146.50</td>
</tr>
<tr>
<th></th>
<td>Additional Polymer Grid Subgrade Stabilization</td>
<td>SY</td>
<td>513.33</td>
<td>$3.50</td>
<td>$1,796.66</td>
<td>$ -</td>
<td>534.32</td>
<td>$ 1,870.12</td>
</tr>
<tr>
<th colspan="7">CHANGE ORDER SUB-TOTAL</th><th colspan="2">$ -</th><th colspan="2">$ 122,836.97</th>
</tr>
<tr>
<th colspan="7">AMOUNT EARNED TOTAL</th><th colspan="2">$179,525.37</th><th colspan="2">$2,014,260.16</th>
</tr>
<tr>
<th>9998</th>
<td>Materials Stored on-site</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$ -</td>
<td>$ -</td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<th>9999</th>
<td>Materials Installed on-site (Deduct)</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$ -</td>
<td>$ -</td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<th colspan="7">MATERIALS SUB-TOTAL</th><th colspan="2">$ -</th><th colspan="2">$ -</th>
</tr>
<tr>
<th colspan="7">TOTAL</th><th colspan="2">$ 179,525.37</th><th colspan="2">$ 2,014,260.16</th>
</tr>
</table>
Sheets in this document
- p. 70 L12 · Section 29-T80N-R7W · MMS Consultants
Sources
- revize: Agenda packet (packet_2025-11-04_73ebb6df-1577-4a68-a966-eb391c55ede2.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.