packet

Packet: Tiffin Regular City Council Meeting (12/02/2025)

Open the PDF Searchable PDF tesseract layer

Page 157 of 160

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>Application No.: 4R</th> <th>Application Period:</th> <th>From</th> <th>10/24/25</th> <th>to</th> <th>11/30/25</th> <th>Application Date:</th> <th>11/21/25</th> </tr> <tr> <td>211</td> <td>Process Piping Materials</td> <td>$111,340.84</td> <td></td> <td></td> <td></td> <td></td> <td>111,340.84</td> </tr> <tr> <td>212</td> <td>Process Piping Labor</td> <td>$85,502.50</td> <td></td> <td></td> <td></td> <td></td> <td>85,502.50</td> </tr> <tr> <td>213</td> <td>Valves Materials</td> <td>$83,000.00</td> <td></td> <td></td> <td></td> <td></td> <td>83,000.00</td> </tr> <tr> <td>214</td> <td>Valves Labor</td> <td>$30,614.26</td> <td></td> <td></td> <td></td> <td></td> <td>30,614.26</td> </tr> <tr> <td>215</td> <td>Structure 30 - Clearwell</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>216</td> <td>Process Piping Materials</td> <td>$62,822.42</td> <td></td> <td></td> <td></td> <td></td> <td>62,822.42</td> </tr> <tr> <td>217</td> <td>Process Piping Labor</td> <td>$69,588.64</td> <td></td> <td></td> <td></td> <td></td> <td>69,588.64</td> </tr> <tr> <td>218</td> <td>Valves Materials</td> <td>$42,830.00</td> <td></td> <td></td> <td></td> <td></td> <td>42,830.00</td> </tr> <tr> <td>219</td> <td>Valves Labor</td> <td>$26,450.68</td> <td></td> <td></td> <td></td> <td></td> <td>26,450.68</td> </tr> <tr> <td>220</td> <td>Insulation</td> <td>$6,825.00</td> <td></td> <td></td> <td></td> <td></td> <td>6,825.00</td> </tr> <tr> <td>221</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>222</td> <td><b>Pollution Control Equipment</b></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>223</td> <td>Vertical Turbine Pumps Materials</td> <td>$115,300.00</td> <td></td> <td></td> <td></td> <td></td> <td>115,300.00</td> </tr> <tr> <td>224</td> <td>Vertical Turbine Pumps Labor</td> <td>$24,601.24</td> <td></td> <td></td> <td></td> <td></td> <td>24,601.24</td> </tr> <tr> <td>225</td> <td>Slide Gates Materials</td> <td>$24,155.00</td> <td></td> <td></td> <td></td> <td></td> <td>24,155.00</td> </tr> <tr> <td>226</td> <td>Slide Gates Labor</td> <td>$9,001.40</td> <td></td> <td></td> <td></td> <td></td> <td>9,001.40</td> </tr> <tr> <td>227</td> <td>Clearwell Leak Testing</td> <td>$18,144.00</td> <td></td> <td></td> <td></td> <td></td> <td>18,144.00</td> </tr> <tr> <td>228</td> <td>Lab Equipment</td> <td>$7,216.00</td> <td></td> <td></td> <td></td> <td></td> <td>7,216.00</td> </tr> <tr> <td>229</td> <td>Filter Media Replacement Materials</td> <td>$49,780.00</td> <td></td> <td></td> <td></td> <td></td> <td>49,780.00</td> </tr> <tr> <td>230</td> <td>Filter Media Replacement Labor</td> <td>$16,480.00</td> <td></td> <td></td> <td></td> <td></td> <td>16,480.00</td> </tr> <tr> <td>231</td> <td>Forced Draft Aerator Materials</td> <td>$125,890.00</td> <td></td> <td></td> <td></td> <td></td> <td>125,890.00</td> </tr> <tr> <td>232</td> <td>Forced Draft Aerator Labor</td> <td>$14,995.00</td> <td></td> <td></td> <td></td> <td></td> <td>14,995.00</td> </tr> <tr> <td>233</td> <td>RO System Materials</td> <td>$1,408,500.00</td> <td></td> <td></td> <td></td> <td></td> <td>1,408,500.00</td> </tr> <tr> <td>234</td> <td>RO System Labor</td> <td>$203,600.00</td> <td></td> <td></td> <td></td> <td></td> <td>203,600.00</td> </tr> <tr> <td>235</td> <td>Chem Sys Chlorine Fluoride Caustic</td> <td>$125,425.00</td> <td></td> <td></td> <td></td> <td></td> <td>125,425.00</td> </tr> <tr> <td>236</td> <td>Chem Systems Labor</td> <td>$41,582.00</td> <td></td> <td></td> <td></td> <td></td> <td>41,582.00</td> </tr> <tr> <td>237</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>238</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>239</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>240</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>241</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> </table>

Sheets in this document

  • p. 22 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 23 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 24 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 25 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 26 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 27 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 28 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 29 Concept Design · Gallant Design
  • p. 30 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 31 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 32 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 33 Concept Design · Gallant Design
  • p. 34 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 35 Floor Plan
  • p. 36 C120 · General Notes and Details · MMS Consultants
  • p. 45 A.200 · South Elevation
  • p. 46 Floor Plan
  • p. 47 Floor Plan · Basement
  • p. 48 A.200 · South Elevation
  • p. 49 A.201 · North Elevation
  • p. 50 Floor Plan · Level 2
  • p. 51 A.200 · Building Elevations
  • p. 52 Floor Plans
  • p. 53 C200 · Site Layout · Iowa DOT
  • p. 54 C300 · Site Utilities Plan
  • p. 55 C301 · Site Utilities Plan
  • p. 56 Revised Site P
  • p. 57 Preliminary Plat
  • p. 58 2 · Road Typical Section
  • p. 59 3 · Revised Phasing & Utility Layout
  • p. 71 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 72 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 73 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 74 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 75 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 76 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 77 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 78 Concept Design · Gallant Design
  • p. 79 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 80 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 81 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 82 Concept Design · Gallant Design
  • p. 83 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 84 Floor Plan
  • p. 85 C120 · General Notes and Details · MMS Consultants
  • p. 94 A.200 · South Elevation
  • p. 95 Floor Plan
  • p. 96 Floor Plan · Basement
  • p. 97 A.200 · South Elevation
  • p. 98 A.201 · North Elevation
  • p. 99 Floor Plans
  • p. 100 A.200 · Building Elevations
  • p. 101 Floor Plans
  • p. 102 C200 · Site Layout · Iowa DOT
  • p. 103 C300 · Site Utilities Plan
  • p. 104 C301 · Site Utilities South
  • p. 105 Revised Site Plan
  • p. 106 Preliminary Plat
  • p. 107 2 · Road Typical Section
  • p. 108 3 · Address City Comments Revised Phasing & Utility Layout

Sources

  • revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.