<th>Application No.: 4R</th>
<th>Application Period:</th>
<th>From</th>
<th>10/24/25</th>
<th>to</th>
<th>11/30/25</th>
<th>Application Date:</th>
<th>11/21/25</th>
</tr>
<tr>
<td>211</td>
<td>Process Piping Materials</td>
<td>$111,340.84</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>111,340.84</td>
</tr>
<tr>
<td>212</td>
<td>Process Piping Labor</td>
<td>$85,502.50</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>85,502.50</td>
</tr>
<tr>
<td>213</td>
<td>Valves Materials</td>
<td>$83,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>83,000.00</td>
</tr>
<tr>
<td>214</td>
<td>Valves Labor</td>
<td>$30,614.26</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>30,614.26</td>
</tr>
<tr>
<td>215</td>
<td>Structure 30 - Clearwell</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>216</td>
<td>Process Piping Materials</td>
<td>$62,822.42</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>62,822.42</td>
</tr>
<tr>
<td>217</td>
<td>Process Piping Labor</td>
<td>$69,588.64</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>69,588.64</td>
</tr>
<tr>
<td>218</td>
<td>Valves Materials</td>
<td>$42,830.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>42,830.00</td>
</tr>
<tr>
<td>219</td>
<td>Valves Labor</td>
<td>$26,450.68</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>26,450.68</td>
</tr>
<tr>
<td>220</td>
<td>Insulation</td>
<td>$6,825.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>6,825.00</td>
</tr>
<tr>
<td>221</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>222</td>
<td><b>Pollution Control Equipment</b></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>223</td>
<td>Vertical Turbine Pumps Materials</td>
<td>$115,300.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>115,300.00</td>
</tr>
<tr>
<td>224</td>
<td>Vertical Turbine Pumps Labor</td>
<td>$24,601.24</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>24,601.24</td>
</tr>
<tr>
<td>225</td>
<td>Slide Gates Materials</td>
<td>$24,155.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>24,155.00</td>
</tr>
<tr>
<td>226</td>
<td>Slide Gates Labor</td>
<td>$9,001.40</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>9,001.40</td>
</tr>
<tr>
<td>227</td>
<td>Clearwell Leak Testing</td>
<td>$18,144.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>18,144.00</td>
</tr>
<tr>
<td>228</td>
<td>Lab Equipment</td>
<td>$7,216.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>7,216.00</td>
</tr>
<tr>
<td>229</td>
<td>Filter Media Replacement Materials</td>
<td>$49,780.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>49,780.00</td>
</tr>
<tr>
<td>230</td>
<td>Filter Media Replacement Labor</td>
<td>$16,480.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>16,480.00</td>
</tr>
<tr>
<td>231</td>
<td>Forced Draft Aerator Materials</td>
<td>$125,890.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>125,890.00</td>
</tr>
<tr>
<td>232</td>
<td>Forced Draft Aerator Labor</td>
<td>$14,995.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>14,995.00</td>
</tr>
<tr>
<td>233</td>
<td>RO System Materials</td>
<td>$1,408,500.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>1,408,500.00</td>
</tr>
<tr>
<td>234</td>
<td>RO System Labor</td>
<td>$203,600.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>203,600.00</td>
</tr>
<tr>
<td>235</td>
<td>Chem Sys Chlorine Fluoride Caustic</td>
<td>$125,425.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>125,425.00</td>
</tr>
<tr>
<td>236</td>
<td>Chem Systems Labor</td>
<td>$41,582.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>41,582.00</td>
</tr>
<tr>
<td>237</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>238</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>239</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>240</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>241</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
</table>
Sheets in this document
- p. 22 Concept Design · Streamline Architects · Tiffin Events Center
- p. 23 Concept Design · Streamline Architects · Tiffin Events Center
- p. 24 Concept Design · Streamline Architects · Tiffin Events Center
- p. 25 Concept Design · Streamline Architects · Tiffin Events Center
- p. 26 Concept Design · Streamline Architects · Tiffin Events Center
- p. 27 Concept Design · Streamline Architects · Tiffin Events Center
- p. 28 Concept Design · Streamline Architects · Tiffin Events Center
- p. 29 Concept Design · Gallant Design
- p. 30 Concept Design | Tiffin Events Center · Streamline Architects
- p. 31 Concept Design · Streamline Architects · Tiffin Events Center
- p. 32 Concept Design · Streamline Architects · Tiffin Events Center
- p. 33 Concept Design · Gallant Design
- p. 34 Concept Design · Streamline Architects · Tiffin Events Center
- p. 35 Floor Plan
- p. 36 C120 · General Notes and Details · MMS Consultants
- p. 45 A.200 · South Elevation
- p. 46 Floor Plan
- p. 47 Floor Plan · Basement
- p. 48 A.200 · South Elevation
- p. 49 A.201 · North Elevation
- p. 50 Floor Plan · Level 2
- p. 51 A.200 · Building Elevations
- p. 52 Floor Plans
- p. 53 C200 · Site Layout · Iowa DOT
- p. 54 C300 · Site Utilities Plan
- p. 55 C301 · Site Utilities Plan
- p. 56 Revised Site P
- p. 57 Preliminary Plat
- p. 58 2 · Road Typical Section
- p. 59 3 · Revised Phasing & Utility Layout
- p. 71 Concept Design · Streamline Architects · Tiffin Events Center
- p. 72 Concept Design · Streamline Architects · Tiffin Events Center
- p. 73 Concept Design · Streamline Architects · Tiffin Events Center
- p. 74 Concept Design · Streamline Architects · Tiffin Events Center
- p. 75 Concept Design · Streamline Architects · Tiffin Events Center
- p. 76 Concept Design · Streamline Architects · Tiffin Events Center
- p. 77 Concept Design · Streamline Architects · Tiffin Events Center
- p. 78 Concept Design · Gallant Design
- p. 79 Concept Design | Tiffin Events Center · Streamline Architects
- p. 80 Concept Design · Streamline Architects · Tiffin Events Center
- p. 81 Concept Design · Streamline Architects · Tiffin Events Center
- p. 82 Concept Design · Gallant Design
- p. 83 Concept Design · Streamline Architects · Tiffin Events Center
- p. 84 Floor Plan
- p. 85 C120 · General Notes and Details · MMS Consultants
- p. 94 A.200 · South Elevation
- p. 95 Floor Plan
- p. 96 Floor Plan · Basement
- p. 97 A.200 · South Elevation
- p. 98 A.201 · North Elevation
- p. 99 Floor Plans
- p. 100 A.200 · Building Elevations
- p. 101 Floor Plans
- p. 102 C200 · Site Layout · Iowa DOT
- p. 103 C300 · Site Utilities Plan
- p. 104 C301 · Site Utilities South
- p. 105 Revised Site Plan
- p. 106 Preliminary Plat
- p. 107 2 · Road Typical Section
- p. 108 3 · Address City Comments Revised Phasing & Utility Layout
Sources
- revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.