packet
Packet: Tiffin Regular City Council Meeting (12/02/2025)
Document 768
Dated December 2, 2025City Council — regular meeting, December 2, 2025 160 pages
Ord. 2025-522, Ord. 2025-523, Res. 2025-089, Res. 2025-090, Res. 2025-091
Page 156 of 160
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Application No.: 4R</th>
<th>Application Period:</th>
<th>From</th>
<th>10/24/25</th>
<th>To</th>
<th>11/30/25</th>
<th>Application Date:</th>
<th>11/21/25</th>
</tr>
<tr>
<td>180</td>
<td>Bldg 10 - Foundations (Exc&BF)</td>
<td></td>
<td>$25,630.00</td>
<td></td>
<td></td>
<td></td>
<td>25,630.00</td>
</tr>
<tr>
<td>181</td>
<td>Bldg 20 - RO Fundations (Exc&BF)</td>
<td></td>
<td>$45,250.00</td>
<td>30,616.00</td>
<td></td>
<td></td>
<td>14,634.00</td>
</tr>
<tr>
<td>182</td>
<td>Bldg 20 - Aeration Tank Found (Ex&BF)</td>
<td></td>
<td>$15,640.00</td>
<td>9,384.00</td>
<td></td>
<td></td>
<td>6,256.00</td>
</tr>
<tr>
<td>183</td>
<td>Bldg 30 - Foundations (Exc&BF)</td>
<td></td>
<td>$37,850.00</td>
<td></td>
<td></td>
<td></td>
<td>37,850.00</td>
</tr>
<tr>
<td>184</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>185</td>
<td><b>Exterior Improvements</b></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>186</td>
<td>Asphalt Paving (Trail)</td>
<td></td>
<td>$22,130.00</td>
<td>22,130.00</td>
<td></td>
<td></td>
<td>22,130.00</td>
</tr>
<tr>
<td>187</td>
<td>Concrete Paving (Site)</td>
<td></td>
<td>$130,288.00</td>
<td></td>
<td></td>
<td></td>
<td>130,288.00</td>
</tr>
<tr>
<td>188</td>
<td>Chain Link Fencing</td>
<td></td>
<td>$32,250.00</td>
<td></td>
<td></td>
<td></td>
<td>32,250.00</td>
</tr>
<tr>
<td>189</td>
<td>Seeding</td>
<td></td>
<td>$6,914.00</td>
<td></td>
<td></td>
<td></td>
<td>6,914.00</td>
</tr>
<tr>
<td>190</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>191</td>
<td><b>Utilities</b></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>192</td>
<td>A - 12" W to Clearwell</td>
<td></td>
<td>$32,544.00</td>
<td>29,289.60</td>
<td></td>
<td></td>
<td>3,254.40</td>
</tr>
<tr>
<td>193</td>
<td>B - 8" W to Clearwell</td>
<td></td>
<td>$25,663.00</td>
<td>20,530.40</td>
<td></td>
<td></td>
<td>5,132.60</td>
</tr>
<tr>
<td>194</td>
<td>C - UG Storm Sewer North</td>
<td></td>
<td>$48,686.00</td>
<td>14,605.80</td>
<td>24,343.00</td>
<td></td>
<td>9,737.20</td>
</tr>
<tr>
<td>195</td>
<td>D - 12" W Aerator to Clearwell</td>
<td></td>
<td>$18,549.00</td>
<td>12,984.30</td>
<td>3,709.80</td>
<td></td>
<td>1,854.90</td>
</tr>
<tr>
<td>196</td>
<td>E - 12" W Bldg 10 to Bldg 20</td>
<td></td>
<td>$8,554.00</td>
<td></td>
<td></td>
<td></td>
<td>8,554.00</td>
</tr>
<tr>
<td>197</td>
<td>G - UG Storm Sewer East</td>
<td></td>
<td>$67,822.00</td>
<td></td>
<td></td>
<td></td>
<td>67,822.00</td>
</tr>
<tr>
<td>198</td>
<td>H & J - UG Storm Sewer West/South</td>
<td></td>
<td>$87,552.00</td>
<td></td>
<td></td>
<td></td>
<td>87,552.00</td>
</tr>
<tr>
<td>199</td>
<td>K - UG Storm Sewer Clearwell West</td>
<td></td>
<td>$42,500.00</td>
<td></td>
<td></td>
<td></td>
<td>42,500.00</td>
</tr>
<tr>
<td>200</td>
<td>F - UG Sanitary Manholes & Piping</td>
<td></td>
<td>$165,835.00</td>
<td>124,376.25</td>
<td>24,875.25</td>
<td></td>
<td>149,251.50</td>
</tr>
<tr>
<td>201</td>
<td>Roof Drains</td>
<td></td>
<td>$2,500.00</td>
<td></td>
<td></td>
<td></td>
<td>2,500.00</td>
</tr>
<tr>
<td>202</td>
<td>Bldg 20 - Process Drain Manhole</td>
<td></td>
<td>$8,500.00</td>
<td>6,375.00</td>
<td>2,125.00</td>
<td></td>
<td>8,500.00</td>
</tr>
<tr>
<td>203</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>204</td>
<td><b>Process Integration (Piping)</b></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>205</td>
<td>Structure 10 - Existing Bldg</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>206</td>
<td>Process Piping Materials</td>
<td></td>
<td>$55,103.74</td>
<td></td>
<td></td>
<td></td>
<td>55,103.74</td>
</tr>
<tr>
<td>207</td>
<td>Process Piping Labor</td>
<td></td>
<td>$37,550.00</td>
<td></td>
<td></td>
<td></td>
<td>37,550.00</td>
</tr>
<tr>
<td>208</td>
<td>Valves Materials</td>
<td></td>
<td>$9,500.00</td>
<td></td>
<td></td>
<td></td>
<td>9,500.00</td>
</tr>
<tr>
<td>209</td>
<td>Valves Labor</td>
<td></td>
<td>$8,250.28</td>
<td></td>
<td></td>
<td></td>
<td>8,250.28</td>
</tr>
<tr>
<td>210</td>
<td>Structure 20 - RO Building</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
</table>
Sheets in this document
- p. 22 Concept Design · Streamline Architects · Tiffin Events Center
- p. 23 Concept Design · Streamline Architects · Tiffin Events Center
- p. 24 Concept Design · Streamline Architects · Tiffin Events Center
- p. 25 Concept Design · Streamline Architects · Tiffin Events Center
- p. 26 Concept Design · Streamline Architects · Tiffin Events Center
- p. 27 Concept Design · Streamline Architects · Tiffin Events Center
- p. 28 Concept Design · Streamline Architects · Tiffin Events Center
- p. 29 Concept Design · Gallant Design
- p. 30 Concept Design | Tiffin Events Center · Streamline Architects
- p. 31 Concept Design · Streamline Architects · Tiffin Events Center
- p. 32 Concept Design · Streamline Architects · Tiffin Events Center
- p. 33 Concept Design · Gallant Design
- p. 34 Concept Design · Streamline Architects · Tiffin Events Center
- p. 35 Floor Plan
- p. 36 C120 · General Notes and Details · MMS Consultants
- p. 45 A.200 · South Elevation
- p. 46 Floor Plan
- p. 47 Floor Plan · Basement
- p. 48 A.200 · South Elevation
- p. 49 A.201 · North Elevation
- p. 50 Floor Plan · Level 2
- p. 51 A.200 · Building Elevations
- p. 52 Floor Plans
- p. 53 C200 · Site Layout · Iowa DOT
- p. 54 C300 · Site Utilities Plan
- p. 55 C301 · Site Utilities Plan
- p. 56 Revised Site P
- p. 57 Preliminary Plat
- p. 58 2 · Road Typical Section
- p. 59 3 · Revised Phasing & Utility Layout
- p. 71 Concept Design · Streamline Architects · Tiffin Events Center
- p. 72 Concept Design · Streamline Architects · Tiffin Events Center
- p. 73 Concept Design · Streamline Architects · Tiffin Events Center
- p. 74 Concept Design · Streamline Architects · Tiffin Events Center
- p. 75 Concept Design · Streamline Architects · Tiffin Events Center
- p. 76 Concept Design · Streamline Architects · Tiffin Events Center
- p. 77 Concept Design · Streamline Architects · Tiffin Events Center
- p. 78 Concept Design · Gallant Design
- p. 79 Concept Design | Tiffin Events Center · Streamline Architects
- p. 80 Concept Design · Streamline Architects · Tiffin Events Center
- p. 81 Concept Design · Streamline Architects · Tiffin Events Center
- p. 82 Concept Design · Gallant Design
- p. 83 Concept Design · Streamline Architects · Tiffin Events Center
- p. 84 Floor Plan
- p. 85 C120 · General Notes and Details · MMS Consultants
- p. 94 A.200 · South Elevation
- p. 95 Floor Plan
- p. 96 Floor Plan · Basement
- p. 97 A.200 · South Elevation
- p. 98 A.201 · North Elevation
- p. 99 Floor Plans
- p. 100 A.200 · Building Elevations
- p. 101 Floor Plans
- p. 102 C200 · Site Layout · Iowa DOT
- p. 103 C300 · Site Utilities Plan
- p. 104 C301 · Site Utilities South
- p. 105 Revised Site Plan
- p. 106 Preliminary Plat
- p. 107 2 · Road Typical Section
- p. 108 3 · Address City Comments Revised Phasing & Utility Layout
Sources
- revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.