packet

Packet: Tiffin Regular City Council Meeting (01/20/2026)

Open the PDF Searchable PDF tesseract layer

Page 147 of 168

Text from the PDF text layer; check the PDF for anything that matters.
Design/Action Items Accomplishments • ASI to reflect width of basketball court was received Upcoming Submittals/Design Deliverables • Submission of fire protection shop drawings Submittals • Exterior louver shop drawing and color Requests for Information • 17 Total RFI’s • 1 RFI’s this month • 0 Pending answers ‒ 0 over due Areas of Concern / Focus • ASI’s to be released: ‒ SW mechanical screen door move ‒ Civil updates that were not previously issued ‒ Exterior metal panel call out drawing cleanup • Athletic flooring color selection ‒ Selected color for AF-2 (Navy) was in a different price range. Reviewing color selections for AF-1 and AF-2. Get involved, respond with urgency, and work as a team to get the job done. Leverage the strengths of each individual and overcome obstacles as one. Owner Progress Report | 250120 December 2025 Miron Construction Co., Inc. | 6

Sheets in this document

  • p. 122 City of Tiffin FY 25-26 Town Hours by Month (chart; data on p. 121)
  • p. 125 City of Tiffin FY 25-26 (chart; data on p. 123)
  • p. 156 Site Concrete · Curbs and Sidewalks

Sources

  • revize: Agenda packet (packet_2026-01-20_90c65bec-67b6-402b-bdf8-06af06b13840.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.