Page 147 of 198

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>Application No.</th> <th>Application Period:</th> <th>From</th> <th>10/01/25</th> <th>to</th> <th>10/23/25</th> <th>Application Date:</th> <th>10/23/25</th> </tr> <tr> <td>211</td> <td>Process Piping Materials</td> <td>$111,340.84</td> <td></td> <td></td> <td></td> <td></td> <td>111,340.84</td> </tr> <tr> <td>212</td> <td>Process Piping Labor</td> <td>$85,502.50</td> <td></td> <td></td> <td></td> <td></td> <td>85,502.50</td> </tr> <tr> <td>213</td> <td>Valves Materials</td> <td>$83,000.00</td> <td></td> <td></td> <td></td> <td></td> <td>83,000.00</td> </tr> <tr> <td>214</td> <td>Valves Labor</td> <td>$30,614.26</td> <td></td> <td></td> <td></td> <td></td> <td>30,614.26</td> </tr> <tr> <td>215</td> <td>Structure 30 - Clearwell</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>216</td> <td>Process Piping Materials</td> <td>$62,822.42</td> <td></td> <td></td> <td></td> <td></td> <td>62,822.42</td> </tr> <tr> <td>217</td> <td>Process Piping Labor</td> <td>$69,588.64</td> <td></td> <td></td> <td></td> <td></td> <td>69,588.64</td> </tr> <tr> <td>218</td> <td>Valves Materials</td> <td>$42,830.00</td> <td></td> <td></td> <td></td> <td></td> <td>42,830.00</td> </tr> <tr> <td>219</td> <td>Valves Labor</td> <td>$26,450.68</td> <td></td> <td></td> <td></td> <td></td> <td>26,450.68</td> </tr> <tr> <td>220</td> <td>Insulation</td> <td>$6,825.00</td> <td></td> <td></td> <td></td> <td></td> <td>6,825.00</td> </tr> <tr> <td>221</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>222</td> <td><b>Pollution Control Equipment</b></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>223</td> <td>Vertical Turbine Pumps Materials</td> <td>$115,300.00</td> <td></td> <td></td> <td></td> <td></td> <td>115,300.00</td> </tr> <tr> <td>224</td> <td>Vertical Turbine Pumps Labor</td> <td>$24,601.24</td> <td></td> <td></td> <td></td> <td></td> <td>24,601.24</td> </tr> <tr> <td>225</td> <td>Slide Gates Materials</td> <td>$24,155.00</td> <td></td> <td></td> <td></td> <td></td> <td>24,155.00</td> </tr> <tr> <td>226</td> <td>Slide Gates Labor</td> <td>$9,001.40</td> <td></td> <td></td> <td></td> <td></td> <td>9,001.40</td> </tr> <tr> <td>227</td> <td>Clearwell Leak Testing</td> <td>$18,144.00</td> <td></td> <td></td> <td></td> <td></td> <td>18,144.00</td> </tr> <tr> <td>228</td> <td>Lab Equipment</td> <td>$7,216.00</td> <td></td> <td></td> <td></td> <td></td> <td>7,216.00</td> </tr> <tr> <td>229</td> <td>Filter Media Replacement Materials</td> <td>$49,780.00</td> <td></td> <td></td> <td></td> <td></td> <td>49,780.00</td> </tr> <tr> <td>230</td> <td>Filter Media Replacement Labor</td> <td>$16,480.00</td> <td></td> <td></td> <td></td> <td></td> <td>16,480.00</td> </tr> <tr> <td>231</td> <td>Forced Draft Aerator Materials</td> <td>$125,890.00</td> <td></td> <td></td> <td></td> <td></td> <td>125,890.00</td> </tr> <tr> <td>232</td> <td>Forced Draft Aerator Labor</td> <td>$14,995.00</td> <td></td> <td></td> <td></td> <td></td> <td>14,995.00</td> </tr> <tr> <td>233</td> <td>RO System Materials</td> <td>$1,408,500.00</td> <td></td> <td></td> <td></td> <td></td> <td>1,408,500.00</td> </tr> <tr> <td>234</td> <td>RO System Labor</td> <td>$203,600.00</td> <td></td> <td></td> <td></td> <td></td> <td>203,600.00</td> </tr> <tr> <td>235</td> <td>Chem Sys Chlorine Fluoride Caustic</td> <td>$125,425.00</td> <td></td> <td></td> <td></td> <td></td> <td>125,425.00</td> </tr> <tr> <td>236</td> <td>Chem Systems Labor</td> <td>$41,582.00</td> <td></td> <td></td> <td></td> <td></td> <td>41,582.00</td> </tr> <tr> <td>237</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>238</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>239</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>240</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>241</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> </table>

Sheets in this document

  • p. 19 A.200 · South Elevation
  • p. 20 Floor Plan
  • p. 21 Floor Plan · Basement
  • p. 22 A.200 · South Elevation
  • p. 23 A.201 · North Elevation
  • p. 24 Floor Plan · Level 2
  • p. 25 A.200 · Building Elevations
  • p. 26 Floor Plan · Level 2
  • p. 27 C200 · Site Layout · Iowa DOT
  • p. 28 C300 · Site Utilities Plan
  • p. 29 C301 · Site Utilities South
  • p. 30 Revised Site Plan
  • p. 31 Preliminary Plat
  • p. 32 2 · Road Typical Section
  • p. 33 3 · Address City Comments Revised Phasing & Utility Layout
  • p. 43 H2 · MSA
  • p. 44 H3 · MSA
  • p. 45 H4 · MSA
  • p. 51 Acquisition Plat · Iowa DOT · Reeve'S Addition Part One
  • p. 52 YW25 · Acquisition Plat · Iowa DOT
  • p. 53 Acquisition Plat · Iowa DOT
  • p. 54 Acquisition Plat · Iowa DOT
  • p. 55 Section: 28 · Iowa DOT
  • p. 56 Plot Plan · Iowa DOT
  • p. 57 Plot Plan · Iowa DOT
  • p. 62 Acquisition Plat · Iowa DOT · Reeve'S Addition Part One
  • p. 63 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction
  • p. 64 Acquisition Plat · Iowa DOT
  • p. 65 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction
  • p. 66 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction Tiffin, Iowa
  • p. 119 MSA · Water Treatment Plant Upgrades - City of Tiffin

Sources

  • revize: Agenda packet (packet_2026-02-03_01b8a8d6-6f0a-495e-b8d2-c37c2999a723.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.