Page 145 of 198

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>Application No.</th> <th>Application Period:</th> <th>From</th> <th>To</th> <th>Application Date:</th> </tr> <tr> <td>149</td> <td>Electrical</td> <td></td> <td></td> <td></td> </tr> <tr> <td>150</td> <td>Mobilization - Neumiller</td> <td>$122,150.00</td> <td>61,075.00</td> <td>2,500.00</td> <td>63,575.00</td> <td>58,575.00</td> </tr> <tr> <td>151</td> <td>Submittals</td> <td>$15,114.00</td> <td>-</td> <td>13,602.60</td> <td>13,602.60</td> <td>1,511.40</td> </tr> <tr> <td>152</td> <td>Manholes</td> <td>$20,000.00</td> <td>-</td> <td></td> <td></td> <td>20,000.00</td> </tr> <tr> <td>153</td> <td>Lighting Lot</td> <td>$39,160.00</td> <td>-</td> <td>32,831.69</td> <td>32,831.69</td> <td>6,328.31</td> </tr> <tr> <td>154</td> <td>Gear Lot</td> <td>$73,570.00</td> <td>-</td> <td></td> <td></td> <td>73,570.00</td> </tr> <tr> <td>155</td> <td>Site Material</td> <td>$155,725.00</td> <td>-</td> <td></td> <td></td> <td>155,725.00</td> </tr> <tr> <td>156</td> <td>Site Labor</td> <td>$79,845.00</td> <td>-</td> <td>10,379.85</td> <td>10,379.85</td> <td>69,465.15</td> </tr> <tr> <td>157</td> <td>Existing Plant Material</td> <td>$34,488.00</td> <td>-</td> <td></td> <td></td> <td>34,488.00</td> </tr> <tr> <td>158</td> <td>Existing Plant Labor</td> <td>$44,883.00</td> <td>-</td> <td></td> <td></td> <td>44,883.00</td> </tr> <tr> <td>159</td> <td>Well No. 3</td> <td>$4,933.00</td> <td>-</td> <td></td> <td></td> <td>4,933.00</td> </tr> <tr> <td>160</td> <td>Well No. 5 Material</td> <td>$8,819.00</td> <td>-</td> <td></td> <td></td> <td>8,819.00</td> </tr> <tr> <td>161</td> <td>RO Building Material</td> <td>$42,586.00</td> <td>-</td> <td></td> <td></td> <td>42,586.00</td> </tr> <tr> <td>162</td> <td>RO Building Labor</td> <td>$77,390.00</td> <td>-</td> <td></td> <td></td> <td>77,390.00</td> </tr> <tr> <td>163</td> <td>Clearwell Material</td> <td>$6,653.00</td> <td>-</td> <td></td> <td></td> <td>6,653.00</td> </tr> <tr> <td>164</td> <td>Clearwell Labor</td> <td>$11,184.00</td> <td>-</td> <td></td> <td></td> <td>11,184.00</td> </tr> <tr> <td>165</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>166</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>167</td> <td><b>Allotment - EP2 - Elec Equip & Controls</b></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>168</td> <td>Elec Systems Analysis</td> <td>$75,000.00</td> <td>37,500.00</td> <td></td> <td>37,500.00</td> <td>50%</td> <td>37,500.00</td> </tr> <tr> <td>169</td> <td>LV Transformers</td> <td>$125,000.00</td> <td>-</td> <td></td> <td></td> <td>0%</td> <td>125,000.00</td> </tr> <tr> <td>170</td> <td>Control Panels</td> <td>$95,890.00</td> <td>-</td> <td></td> <td></td> <td></td> <td>95,890.00</td> </tr> <tr> <td>171</td> <td>Field Instrumentation</td> <td>$185,000.00</td> <td>-</td> <td></td> <td></td> <td></td> <td>185,000.00</td> </tr> <tr> <td>172</td> <td>MCCs</td> <td>$365,000.00</td> <td>-</td> <td></td> <td></td> <td></td> <td>365,000.00</td> </tr> <tr> <td>173</td> <td>Electrical Distribution Equipment</td> <td>$114,000.00</td> <td>-</td> <td></td> <td></td> <td></td> <td>114,000.00</td> </tr> <tr> <td>174</td> <td>SCADA Networking Integration</td> <td>$102,500.00</td> <td>-</td> <td></td> <td></td> <td></td> <td>102,500.00</td> </tr> <tr> <td>175</td> <td>HS Pump #3 Enclosure</td> <td>$85,273.00</td> <td>-</td> <td></td> <td></td> <td></td> <td>85,273.00</td> </tr> <tr> <td>176</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>177</td> <td><b>Earthwork</b></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>178</td> <td>Site Preloading</td> <td>$194,820.00</td> <td>194,820.00</td> <td></td> <td>194,820.00</td> <td></td> <td></td> </tr> <tr> <td>179</td> <td>General Site Grading/Backfill</td> <td>$265,000.00</td> <td>-</td> <td></td> <td></td> <td></td> <td>265,000.00</td> </tr> </table>

Sheets in this document

  • p. 19 A.200 · South Elevation
  • p. 20 Floor Plan
  • p. 21 Floor Plan · Basement
  • p. 22 A.200 · South Elevation
  • p. 23 A.201 · North Elevation
  • p. 24 Floor Plan · Level 2
  • p. 25 A.200 · Building Elevations
  • p. 26 Floor Plan · Level 2
  • p. 27 C200 · Site Layout · Iowa DOT
  • p. 28 C300 · Site Utilities Plan
  • p. 29 C301 · Site Utilities South
  • p. 30 Revised Site Plan
  • p. 31 Preliminary Plat
  • p. 32 2 · Road Typical Section
  • p. 33 3 · Address City Comments Revised Phasing & Utility Layout
  • p. 43 H2 · MSA
  • p. 44 H3 · MSA
  • p. 45 H4 · MSA
  • p. 51 Acquisition Plat · Iowa DOT · Reeve'S Addition Part One
  • p. 52 YW25 · Acquisition Plat · Iowa DOT
  • p. 53 Acquisition Plat · Iowa DOT
  • p. 54 Acquisition Plat · Iowa DOT
  • p. 55 Section: 28 · Iowa DOT
  • p. 56 Plot Plan · Iowa DOT
  • p. 57 Plot Plan · Iowa DOT
  • p. 62 Acquisition Plat · Iowa DOT · Reeve'S Addition Part One
  • p. 63 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction
  • p. 64 Acquisition Plat · Iowa DOT
  • p. 65 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction
  • p. 66 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction Tiffin, Iowa
  • p. 119 MSA · Water Treatment Plant Upgrades - City of Tiffin

Sources

  • revize: Agenda packet (packet_2026-02-03_01b8a8d6-6f0a-495e-b8d2-c37c2999a723.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.