Page 143 of 198

Text read by the vision model; check the PDF for anything that matters.
Progress Estimate - Lump Sum Work <table> <tr> <th>Application No.</th> <th>Application Period:</th> <th>From</th> <th>10/01/25</th> <th>to</th> <th>10/23/25</th> <th>Application Date:</th> <th>10/23/25</th> </tr> <tr> <td>87</td> <td>Metal Roofing - Materials</td> <td>$35,256.00</td> <td></td> <td></td> <td></td> <td></td> <td>35,256.00</td> </tr> <tr> <td>88</td> <td>Metal Roofing - Labor</td> <td>$40,587.00</td> <td></td> <td></td> <td></td> <td></td> <td>40,587.00</td> </tr> <tr> <td>89</td> <td>Preformed Metal Soffit - Materials</td> <td>$5,877.00</td> <td></td> <td></td> <td></td> <td></td> <td>5,877.00</td> </tr> <tr> <td>90</td> <td>Preformed Metal Soffit - Labor</td> <td>$9,992.12</td> <td></td> <td></td> <td></td> <td></td> <td>9,992.12</td> </tr> <tr> <td>91</td> <td>Gutters & Downspouts - Materials</td> <td>$5,600.00</td> <td></td> <td></td> <td></td> <td></td> <td>5,600.00</td> </tr> <tr> <td>92</td> <td>Gutters & Downspouts - Labor</td> <td>$8,544.32</td> <td></td> <td></td> <td></td> <td></td> <td>8,544.32</td> </tr> <tr> <td>93</td> <td><b>Structure 30 - Clearwell</b></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>94</td> <td>Metal Roofing - Materials</td> <td>$9,442.00</td> <td></td> <td></td> <td></td> <td></td> <td>9,442.00</td> </tr> <tr> <td>95</td> <td>Metal Roofing - Labor</td> <td>$11,566.68</td> <td></td> <td></td> <td></td> <td></td> <td>11,566.68</td> </tr> <tr> <td>96</td> <td>Preformed Metal Soffit - Materials</td> <td>$3,655.00</td> <td></td> <td></td> <td></td> <td></td> <td>3,655.00</td> </tr> <tr> <td>97</td> <td>Preformed Metal Soffit - Labor</td> <td>$6,552.46</td> <td></td> <td></td> <td></td> <td></td> <td>6,552.46</td> </tr> <tr> <td>98</td> <td>Gutters & Downspouts - Materials</td> <td>$2,651.00</td> <td></td> <td></td> <td></td> <td></td> <td>2,651.00</td> </tr> <tr> <td>99</td> <td>Gutters & Downspouts - Labor</td> <td>$3,215.42</td> <td></td> <td></td> <td></td> <td></td> <td>3,215.42</td> </tr> <tr> <td>100</td> <td>Roof Hatches - Materials</td> <td>$6,200.00</td> <td></td> <td></td> <td></td> <td></td> <td>6,200.00</td> </tr> <tr> <td>101</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>102</td> <td><b>Openings</b></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>103</td> <td>HM Frames, Doors & Hardware-Materials</td> <td>$53,528.00</td> <td></td> <td></td> <td></td> <td></td> <td>53,528.00</td> </tr> <tr> <td>104</td> <td>HM Frames, Doors & Hardware-Labor</td> <td>$6,890.00</td> <td></td> <td></td> <td></td> <td></td> <td>6,890.00</td> </tr> <tr> <td>105</td> <td>Vault Doors - Materials</td> <td>$49,611.00</td> <td></td> <td></td> <td></td> <td></td> <td>49,611.00</td> </tr> <tr> <td>106</td> <td>Vault Doors - Labor</td> <td>$3,110.00</td> <td></td> <td></td> <td></td> <td></td> <td>3,110.00</td> </tr> <tr> <td>107</td> <td>Overhead Door</td> <td>$43,790.00</td> <td></td> <td></td> <td></td> <td></td> <td>43,790.00</td> </tr> <tr> <td>108</td> <td>Aluminum Windows</td> <td>$8,996.00</td> <td></td> <td></td> <td></td> <td></td> <td>8,996.00</td> </tr> <tr> <td>109</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>110</td> <td><b>Finishes</b></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>111</td> <td>Resilient Base</td> <td>$2,500.00</td> <td></td> <td></td> <td></td> <td></td> <td>2,500.00</td> </tr> <tr> <td>112</td> <td>Epoxy Flooring</td> <td>$67,408.00</td> <td></td> <td></td> <td></td> <td></td> <td>67,408.00</td> </tr> <tr> <td>113</td> <td>High Performance Coatings</td> <td>$68,724.00</td> <td></td> <td></td> <td></td> <td></td> <td>68,724.00</td> </tr> <tr> <td>114</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>115</td> <td><b>Specialties</b></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>116</td> <td>Signage</td> <td>$450.00</td> <td></td> <td></td> <td></td> <td></td> <td>450.00</td> </tr> <tr> <td>117</td> <td>Metal Lockers</td> <td>$7,100.00</td> <td></td> <td></td> <td></td> <td></td> <td>7,100.00</td> </tr> </table>

Sheets in this document

  • p. 19 A.200 · South Elevation
  • p. 20 Floor Plan
  • p. 21 Floor Plan · Basement
  • p. 22 A.200 · South Elevation
  • p. 23 A.201 · North Elevation
  • p. 24 Floor Plan · Level 2
  • p. 25 A.200 · Building Elevations
  • p. 26 Floor Plan · Level 2
  • p. 27 C200 · Site Layout · Iowa DOT
  • p. 28 C300 · Site Utilities Plan
  • p. 29 C301 · Site Utilities South
  • p. 30 Revised Site Plan
  • p. 31 Preliminary Plat
  • p. 32 2 · Road Typical Section
  • p. 33 3 · Address City Comments Revised Phasing & Utility Layout
  • p. 43 H2 · MSA
  • p. 44 H3 · MSA
  • p. 45 H4 · MSA
  • p. 51 Acquisition Plat · Iowa DOT · Reeve'S Addition Part One
  • p. 52 YW25 · Acquisition Plat · Iowa DOT
  • p. 53 Acquisition Plat · Iowa DOT
  • p. 54 Acquisition Plat · Iowa DOT
  • p. 55 Section: 28 · Iowa DOT
  • p. 56 Plot Plan · Iowa DOT
  • p. 57 Plot Plan · Iowa DOT
  • p. 62 Acquisition Plat · Iowa DOT · Reeve'S Addition Part One
  • p. 63 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction
  • p. 64 Acquisition Plat · Iowa DOT
  • p. 65 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction
  • p. 66 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction Tiffin, Iowa
  • p. 119 MSA · Water Treatment Plant Upgrades - City of Tiffin

Sources

  • revize: Agenda packet (packet_2026-02-03_01b8a8d6-6f0a-495e-b8d2-c37c2999a723.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.