Page 139 of 198

Text read by the vision model; check the PDF for anything that matters.
Contractor's Application for Payment Owner: City of Tiffin Engineer: MSA Professional Services Contractor: Tricon Construction Group Project: Water Treatment Plant Upgrades - City of Tiffin Contract: Water Treatment Plant Upgrades Owner's Project No.: ____________________________ Engineer's Project No.: 13603016 Contractor's Project No.: ____________________________ Application No.: 38 Application Date: 10/23/2025 Application Period: From 10/1/2025 to 10/23/2025 <table> <tr> <th> </th> <th> </th> <th> </th> </tr> <tr> <td>1. Original Contract Price</td> <td>$</td> <td>12,182,553.00</td> </tr> <tr> <td>2. Net change by Change Orders</td> <td>$</td> <td>12,420.34</td> </tr> <tr> <td>3. Current Contract Price (Line 1 + Line 2)</td> <td>$</td> <td>12,194,973.34</td> </tr> <tr> <td>4. Total Work completed and materials stored to date<br>(Sum of Column G Lump Sum Total and Column G Unit Price Total)</td> <td>$</td> <td>1,230,320.50</td> </tr> <tr> <td>5. Retainage<br>a. 5% X $1,197,488.81 Work Completed<br>b. 5% X $32,831.69 Stored Materials<br>c. Total Retainage (Line 5.a + Line 5.b)</td> <td>$</td> <td>59,874.44<br>1,641.58<br>61,516.02</td> </tr> <tr> <td>6. Amount eligible to date (Line 4 - Line 5.c)</td> <td>$</td> <td>1,168,804.48</td> </tr> <tr> <td>7. Less previous payments (Line 6 from prior application)</td> <td>$</td> <td>761,599.65</td> </tr> <tr> <td>8. <b>Amount due this application</b></td> <td>$</td> <td>407,204.83</td> </tr> <tr> <td>9. Balance to finish, including retainage (Line 3 - Line 4, plus 5c)</td> <td>$</td> <td>11,026,168.86</td> </tr> </table> Contractor's Certification The undersigned Contractor certifies, to the best of its knowledge, the following: Contractor: Tricon Construction Group Signature: Mary K. Stone Date: 10/23/2025 PAYMENT OF: $407,204.83 (line 8 or other - attach explanation of the other amount) Recommended by Engineer By: ____________________________ Title: ____________________________ Date: ____________________________ Approved by Owner By: ____________________________ Title: ____________________________ Date: ____________________________ Approved by Funding Agency By: ____________________________ Title: ____________________________ Date: ____________________________ Date: ____________________________

Sheets in this document

  • p. 19 A.200 · South Elevation
  • p. 20 Floor Plan
  • p. 21 Floor Plan · Basement
  • p. 22 A.200 · South Elevation
  • p. 23 A.201 · North Elevation
  • p. 24 Floor Plan · Level 2
  • p. 25 A.200 · Building Elevations
  • p. 26 Floor Plan · Level 2
  • p. 27 C200 · Site Layout · Iowa DOT
  • p. 28 C300 · Site Utilities Plan
  • p. 29 C301 · Site Utilities South
  • p. 30 Revised Site Plan
  • p. 31 Preliminary Plat
  • p. 32 2 · Road Typical Section
  • p. 33 3 · Address City Comments Revised Phasing & Utility Layout
  • p. 43 H2 · MSA
  • p. 44 H3 · MSA
  • p. 45 H4 · MSA
  • p. 51 Acquisition Plat · Iowa DOT · Reeve'S Addition Part One
  • p. 52 YW25 · Acquisition Plat · Iowa DOT
  • p. 53 Acquisition Plat · Iowa DOT
  • p. 54 Acquisition Plat · Iowa DOT
  • p. 55 Section: 28 · Iowa DOT
  • p. 56 Plot Plan · Iowa DOT
  • p. 57 Plot Plan · Iowa DOT
  • p. 62 Acquisition Plat · Iowa DOT · Reeve'S Addition Part One
  • p. 63 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction
  • p. 64 Acquisition Plat · Iowa DOT
  • p. 65 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction
  • p. 66 Acquisition Plat · Iowa DOT · US Highway 6 Reconstruction Tiffin, Iowa
  • p. 119 MSA · Water Treatment Plant Upgrades - City of Tiffin

Sources

  • revize: Agenda packet (packet_2026-02-03_01b8a8d6-6f0a-495e-b8d2-c37c2999a723.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.