packet
Packet: Tiffin Regular City Council Meeting (02/17/2026)
Dated February 17, 2026City Council — regular meeting, February 17, 2026 313 pages
Ord. 2026-523, Ord. 2025-520, Res. 2026-008, Res. 2026-009, Res. 2026-010, Res. 2026-011, Res. 2026-012, Res. 2026-013, Res. 2026-005, Res. 2026-006, Res. 2026-007
Page 302 of 313
Text from the PDF text layer; check the PDF for anything that matters.Construction Summary
Schedule Update
Scheduled January Activities: Scheduled February Activities:
• Foundation backfill (95%) • 2nd floor interior steel
• Erection of pre-engineered metal building (100%) • PEMB roofing
• PEMB Roofing (35%) • PEMB exterior metal panels
• PEMB exterior metal panels (20%)
• Locker Room CMU (95%)
Manpower Report
List of major subcontractors & number of employees onsite:
Total number of employees: 25
• AAA Mechanical – 1 • Price Electric – 2
• Cedar Valley Steel – 3 • Seehase Masonry - 6
• Merit Construction – 1 • SG Construction – 8
• Miron Concrete - 2
• Miron Construction Manager - 2
Delays
• Weather – See Daily Log Weather Report
‒ 3 days in January
• 1/19/2026 – Dangerous cold temperatures -20F below wind chill
• 1/22/2026 – High winds picked up during the morning
• 1/23/2026 – Dangerous cold temperatures, -20F below wind chill
• 1/26/2026 – Dangerous cold temperatures, -20F below wind chill (Day made up on 2/1)
Weather Delays (Construction)
Scheduled Occurred Left
12 8 4
• Materials & Labor
‒ N/A Deliver unmatched quality,
create meaningful
Key Issues / Concerns & Recommended Action Steps connections, and craft
• Installation progress of exterior metal panels and roof unforgettable experiences in
everything we do. Capture
what truly matters and find
ways to inspire.
Owner Progress Report | 250120 January 2026 Miron Construction Co., Inc. | 8
Sheets in this document
- p. 37 1 · Lots Layout · Shoemaker & Haaland · Valley Subdivision (37-20)
- p. 38 2 · DWN: MJW Survey Date(S): 2024 · Valley Subdivision (37-20)
- p. 54 Preliminary Plat · MMS Consultants
- p. 247 Renewal Communications Flow
- p. 275 City of Tiffin FY 25-26 Town Hours by Month (chart; data on p. 274)
- p. 278 City of Tiffin FY 25-26 (chart; data on p. 276)
- p. 309 2nd Floor In Wall Rough In · Prep/Pour/Strip Slab on Grade
Sources
- revize: Agenda packet (packet_2026-02-17_520e00e5-d070-4eea-a5c2-4e5eec3f920e.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.