Page 299 of 313

Text from the PDF text layer; check the PDF for anything that matters.
Executive Summary Overview January was a windy and cold month. We saw multiple days with high winds and brutal cold wind chills resulting in multiple weather delays, reducing our weather bucket (see weather log). Even with the weather, the site made steady progress. The CMU walls are erected in the locker room area. We were able to get the roof on Building B (North lean- to) and started installing the liner on Building A (gym building). The interior steel columns and beams were delivered and started erection. In the next couple of weeks, the second floor will start taking shape. Our main concern is getting the building enclosed with the roof and the exterior metal panels to begin temporary heating for the slab pours. Major Milestones / Accomplishments • PEMB Building B is roofed Upcoming Milestones • PEMB Building A Roof • Main interior steel erection completion Key Issues and Concerns • Color selection of AF-2 – Wrapped up with additional samples • Finalizing owner supplied equipment and getting contractors on board • Electrical and Gas service to building • Weather and building enclosure to pour slabs on grades Be authentic, lead with humility, and recognize the needs of others. Care for one another and extend a helping hand wherever it’s needed. Honor our history. Owner Progress Report | 250120 January 2026 Miron Construction Co., Inc. | 5

Sheets in this document

  • p. 37 1 · Lots Layout · Shoemaker & Haaland · Valley Subdivision (37-20)
  • p. 38 2 · DWN: MJW Survey Date(S): 2024 · Valley Subdivision (37-20)
  • p. 54 Preliminary Plat · MMS Consultants
  • p. 247 Renewal Communications Flow
  • p. 275 City of Tiffin FY 25-26 Town Hours by Month (chart; data on p. 274)
  • p. 278 City of Tiffin FY 25-26 (chart; data on p. 276)
  • p. 309 2nd Floor In Wall Rough In · Prep/Pour/Strip Slab on Grade

Sources

  • revize: Agenda packet (packet_2026-02-17_520e00e5-d070-4eea-a5c2-4e5eec3f920e.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.