packet
Packet: Tiffin Regular City Council Meeting (02/17/2026)
Document 657
Dated February 17, 2026City Council — regular meeting, February 17, 2026 313 pages
Ord. 2026-523, Ord. 2025-520, Res. 2026-008, Res. 2026-009, Res. 2026-010, Res. 2026-011, Res. 2026-012, Res. 2026-013, Res. 2026-005, Res. 2026-006, Res. 2026-007
Page 202 of 313
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>ITEM NO.</th>
<th>CONTRACT ITEMS</th>
<th>UNIT</th>
<th>EST QTY</th>
<th>UNIT PRICE</th>
<th>CONTRACTOR'S BID PRICE</th>
<th colspan="2">Pay Period #12</th>
<th colspan="2">TOTAL TO DATE</th>
</tr>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th>QTY</th>
<th>AMOUNT</th>
<th>QTY</th>
<th>AMOUNT</th>
</tr>
<tr><td>1</td><td>CLEARING & GRUBBING</td><td>UNITS</td><td>357.80</td><td>$30.00</td><td>$10,734.00</td><td></td><td></td><td>307.80</td><td>$9,234.00</td></tr>
<tr><td>2</td><td>EXCAVATION, CLASS 10, ROADWAY AND BORROW</td><td>CY</td><td>5634.76</td><td>$13.50</td><td>$76,069.26</td><td></td><td></td><td>5,634.76</td><td>$76,069.27</td></tr>
<tr><td>3</td><td>EXCAVATION, CLASS 10, WASTE</td><td>CY</td><td>4626.04</td><td>$12.50</td><td>$57,825.50</td><td></td><td></td><td>4,626.04</td><td>$57,825.51</td></tr>
<tr><td>4</td><td>TOPSOIL, STRP, SALVAGE & RESPREAD</td><td>CY</td><td>1008.72</td><td>$33.00</td><td>$33,287.76</td><td></td><td></td><td>889.91</td><td>$29,367.03</td></tr>
<tr><td>5</td><td>SUBGRADE PREPARATION</td><td>SY</td><td>9296.45</td><td>$2.00</td><td>$18,592.90</td><td></td><td></td><td>9,296.36</td><td>$18,592.72</td></tr>
<tr><td>6</td><td>MODIFIED SUBBASE</td><td>CY</td><td>1579.47</td><td>$42.00</td><td>$66,337.74</td><td></td><td></td><td>1,579.47</td><td>$66,337.74</td></tr>
<tr><td>7</td><td>SHOULDER FINISH, EARTH</td><td>STA</td><td>44.45</td><td>$300.00</td><td>$13,335.00</td><td></td><td></td><td>44.45</td><td>$13,335.00</td></tr>
<tr><td>8</td><td>REMOVAL OF KNOWN PIPE CULVERTS, MISC. SIZE AND TYPE</td><td>LF</td><td>1120.00</td><td>$15.00</td><td>$16,800.00</td><td>10.00</td><td>$150.00</td><td>1,537.00</td><td>$23,055.00</td></tr>
<tr><td>9</td><td>STORM SEWER, TRENCHED, 12 IN DIA.</td><td>LF</td><td>168.50</td><td>$80.00</td><td>$13,480.00</td><td></td><td></td><td>219.00</td><td>$17,520.00</td></tr>
<tr><td>10</td><td>STORM SEWER, TRENCHED, 15 IN DIA.</td><td>LR</td><td>833.50</td><td>$80.00</td><td>$66,680.00</td><td></td><td></td><td>874.50</td><td>$69,960.00</td></tr>
<tr><td>11</td><td>STORM SEWER, TRENCHED, 18 IN DIA.</td><td>LF</td><td>580.00</td><td>$100.00</td><td>$58,000.00</td><td></td><td></td><td>605.00</td><td>$60,500.00</td></tr>
<tr><td>12</td><td>STORM SEWER, TRENCHED, 24 IN DIA.</td><td>LF</td><td>558.70</td><td>$145.00</td><td>$81,011.50</td><td>46.00</td><td>$6,670.00</td><td>570.00</td><td>$82,681.50</td></tr>
<tr><td>13</td><td>PPE APRON, RC2, 24 IN.</td><td>EACH</td><td>1.00</td><td>$2,950.00</td><td>$2,950.00</td><td></td><td></td><td>1.00</td><td>$2,950.00</td></tr>
<tr><td>14</td><td>PIPE APRON GUARD</td><td>EACH</td><td>1.00</td><td>$1,400.00</td><td>$1,400.00</td><td></td><td></td><td>1.00</td><td>$1,400.00</td></tr>
<tr><td>15</td><td>SUBDRAIN, PERFORATED PLASTIC PIPE, 4 IN. DIA.</td><td>LF</td><td>2994.00</td><td>$19.50</td><td>$58,383.00</td><td>16.00</td><td>$195.00</td><td>3,612.00</td><td>$70,434.00</td></tr>
<tr><td>16</td><td>SUBDRAIN OUTLET, CNP, 4 IN. DIA</td><td>EACH</td><td>28.00</td><td>$250.00</td><td>$7,000.00</td><td>2.00</td><td>$500.00</td><td>42.00</td><td>$10,500.00</td></tr>
<tr><td>17</td><td>SUBDRAIN CLEANOUT, TYPE 3, 24-INCH</td><td>EACH</td><td>4.00</td><td>$1,250.00</td><td>$5,000.00</td><td>2.00</td><td>$2,500.00</td><td>4.00</td><td>$5,000.00</td></tr>
<tr><td>18</td><td>WATERMAIN, TRENCHED, DR-18 PVC, 6 IN. DIA.</td><td>LF</td><td>819.00</td><td>$55.00</td><td>$45,045.00</td><td>29.00</td><td>$1,595.00</td><td>695.00</td><td>$38,225.00</td></tr>
<tr><td>19</td><td>WATERMAIN, TRENCHED, DR-18 PVC, 4 IN. DIA.</td><td>LF</td><td>11.00</td><td>$85.00</td><td>$935.00</td><td></td><td></td><td></td><td></td></tr>
<tr><td>20</td><td>WATERMAIN, TRENCHLESS, DR-18 PVC, 6 IN. DIA.</td><td>LF</td><td>329.00</td><td>$79.00</td><td>$25,930.00</td><td></td><td></td><td>329.00</td><td>$25,930.00</td></tr>
<tr><td>21</td><td>FITTINGS, MJ, DIP, 6 IN. DIA.</td><td>EACH</td><td>40.00</td><td>$400.00</td><td>$16,000.00</td><td>10.00</td><td>$4,000.00</td><td>30.00</td><td>$12,000.00</td></tr>
<tr><td>22</td><td>FITTINGS, MJ, DIP, 12 IN. DIA.</td><td>EACH</td><td>2.00</td><td>$1,000.00</td><td>$2,000.00</td><td>2.00</td><td>$2,000.00</td><td>4.00</td><td>$4,000.00</td></tr>
<tr><td>23</td><td>WATER SERVICE PIPE, TYPE K COPPER, 1 IN. DIA.</td><td>LF</td><td>239.00</td><td>$23.00</td><td>$5,497.00</td><td>42.00</td><td>$966.00</td><td>78.00</td><td>$1,794.00</td></tr>
<tr><td>24</td><td>WATER SERVICE CORPORATION, 1 IN. DIA.</td><td>EACH</td><td>4.00</td><td>$450.00</td><td>$1,800.00</td><td>2.00</td><td>$900.00</td><td>3.00</td><td>$1,350.00</td></tr>
<tr><td>25</td><td>WATER SERVICE CURB STOP AND BOX, 1 IN. DIA.</td><td>EACH</td><td>4.00</td><td>$500.00</td><td>$2,000.00</td><td></td><td></td><td>1.00</td><td>$500.00</td></tr>
<tr><td>26</td><td>GATE VALVE, MJ, 6 IN. DIA.</td><td>EACH</td><td>10.00</td><td>$1,900.00</td><td>$19,000.00</td><td>2.00</td><td>$3,800.00</td><td>11.00</td><td>$20,900.00</td></tr>
<tr><td>27</td><td>GATE VALVE, MJ, 6 IN. DIA.</td><td>EACH</td><td>1.00</td><td>$4,350.00</td><td>$4,350.00</td><td></td><td></td><td></td><td></td></tr>
<tr><td>28</td><td>FIRE HYDRANT ASSEMBLY, WM-201</td><td>EACH</td><td>1.00</td><td>$7,800.00</td><td>$7,800.00</td><td></td><td></td><td>1.00</td><td>$7,800.00</td></tr>
<tr><td>29</td><td>VALVE BOX EXTENSION/ADJUSTMENT</td><td>EACH</td><td>10.00</td><td>$500.00</td><td>$5,000.00</td><td>4.00</td><td>$2,000.00</td><td>12.00</td><td>$6,000.00</td></tr>
<tr><td>30</td><td>FIREHYDRANT ADJUSTMENT</td><td>EACH</td><td>1.00</td><td>$1,850.00</td><td>$1,850.00</td><td></td><td></td><td></td><td></td></tr>
<tr><td>31</td><td>WATERMAIN CONFLICTS</td><td>EACH</td><td>7.00</td><td>$5,500.00</td><td>$38,500.00</td><td></td><td></td><td>4.00</td><td>$22,000.00</td></tr>
<tr><td>32</td><td>WATERMAIN REMOVALS</td><td>LS</td><td>1.00</td><td>$1,000.00</td><td>$1,000.00</td><td>0.30</td><td>$300.00</td><td>1.00</td><td>$1,000.00</td></tr>
<tr><td>33</td><td>MANHOLE, SW-401, 48 IN.</td><td>EACH</td><td>3.00</td><td>$4,750.00</td><td>$14,250.00</td><td></td><td></td><td>2.00</td><td>$9,500.00</td></tr>
<tr><td>34</td><td>MANHOLE, SW-401, 60 IN.</td><td>EACH</td><td>1.00</td><td>$5,500.00</td><td>$5,500.00</td><td></td><td></td><td>2.00</td><td>$11,000.00</td></tr>
<tr><td>35</td><td>INTAKE, SW-501</td><td>EACH</td><td>27.00</td><td>$3,800.00</td><td>$102,600.00</td><td>2.00</td><td>$7,600.00</td><td>26.00</td><td>$98,800.00</td></tr>
<tr><td>36</td><td>INTAKE, SW-501, MODIFIED</td><td>EACH</td><td>3.00</td><td>$5,650.00</td><td>$16,950.00</td><td></td><td></td><td>3.00</td><td>$16,950.00</td></tr>
<tr><td>37</td><td>INTAKE, SW-507</td><td>EACH</td><td>1.00</td><td>$5,000.00</td><td>$5,000.00</td><td>1.00</td><td>$5,000.00</td><td>1.00</td><td>$5,000.00</td></tr>
<tr><td>38</td><td>INTAKE, SW-512</td><td>EACH</td><td>2.00</td><td>$1,350.00</td><td>$2,700.00</td><td></td><td></td><td>4.00</td><td>$4,000.00</td></tr>
<tr><td>39</td><td>MANHOLE ADJUSTMENT, MINOR</td><td>EACH</td><td>7.00</td><td>$500.00</td><td>$3,500.00</td><td></td><td></td><td>7.00</td><td>$3,500.00</td></tr>
<tr><td>40</td><td>INTAKE ADJUSTMENT, MINOR</td><td>EACH</td><td>2.00</td><td>$750.00</td><td>$1,500.00</td><td></td><td></td><td>2.00</td><td>$1,500.00</td></tr>
<tr><td>41</td><td>REMOVE INTAKE</td><td>EACH</td><td>10.00</td><td>$750.00</td><td>$7,500.00</td><td></td><td></td><td>9.00</td><td>$6,750.00</td></tr>
<tr><td>42</td><td>PATCHES, FULL DEPTH FINISH, BY COUNT</td><td>EACH</td><td>10.00</td><td>$100.00</td><td>$1,000.00</td><td>5.00</td><td>$500.00</td><td>5.00</td><td>$500.00</td></tr>
<tr><td>43</td><td>PATCHES, FULL DEPTH FINISH, BY COUNT</td><td>SY</td><td>111.00</td><td>$200.00</td><td>$22,200.00</td><td>30.67</td><td>$6,134.00</td><td>30.67</td><td>$6,134.00</td></tr>
<tr><td>44</td><td>SURBAS, (PATCHES)</td><td>SY</td><td>111.00</td><td>$40.00</td><td>$4,440.00</td><td>30.67</td><td>$1,226.80</td><td>30.67</td><td>$1,226.80</td></tr>
<tr><td>45</td><td>PAVEMENT, PCC, CLASS C, 3 DURABILITY 9 IN. THICK</td><td>SY</td><td>1794.20</td><td>$78.00</td><td>$139,947.60</td><td>(323.10)</td><td>(25,201.80)</td><td>1,471.32</td><td>$114,762.95</td></tr>
<tr><td>46</td><td>PAVEMENT, PCC, CLASS C, 3 DURABILITY 6 IN. THICK</td><td>SY</td><td>1549.80</td><td>$57.00</td><td>$88,338.60</td><td></td><td></td><td>1,931.00</td><td>$110,067.00</td></tr>
<tr><td>47</td><td>PAVEMENT, BRICK/RAVER INLAY</td><td>SY</td><td>657.70</td><td>$71.00</td><td>$46,469.70</td><td></td><td></td><td>657.70</td><td>$46,469.70</td></tr>
<tr><td>48</td><td>BITUMINOUS SEDGING COURSE</td><td>SY</td><td>657.70</td><td>$29.90</td><td>$19,665.23</td><td></td><td></td><td>657.70</td><td>$19,665.23</td></tr>
<tr><td>49</td><td>CURB AND GUTTER, 36 IN. WIDE, 9 IN. THICK</td><td>LF</td><td>3533.40</td><td>$32.70</td><td>$115,542.18</td><td></td><td></td><td>3,534.00</td><td>$115,541.80</td></tr>
<tr><td>50</td><td>PAVEMENT, EMA, STANDARD TRAFFIC, 3 IN. THICK</td><td>SY</td><td>4805.30</td><td>$45.90</td><td>$220,563.27</td><td>828.64</td><td>$38,034.58</td><td>4,425.33</td><td>$203,131.83</td></tr>
<tr><td>51</td><td>FULL DEPTH RECLAMATION</td><td>SY</td><td>6203.10</td><td>$4.50</td><td>$27,913.95</td><td></td><td></td><td>6,449.76</td><td>$29,023.93</td></tr>
<tr><td>52</td><td>REMOVAL OF SIDEWALK</td><td>SY</td><td>971.00</td><td>$9.00</td><td>$8,739.00</td><td></td><td></td><td>993.36</td><td>$8,940.24</td></tr>
<tr><td>53</td><td>REMOVAL OF DRIVEWAY</td><td>SY</td><td>489.00</td><td>$9.00</td><td>$4,401.00</td><td></td><td></td><td>1,145.49</td><td>$10,309.41</td></tr>
<tr><td>54</td><td>REMOVAL OF PAVEMENT</td><td>SY</td><td>800.00</td><td>$2.00</td><td>$1,600.00</td><td></td><td></td><td>804.85</td><td>$1,629.65</td></tr>
<tr><td>55</td><td>SIDEWALK, PCC, 6 IN.</td><td>SY</td><td>1221.30</td><td>$50.70</td><td>$61,919.91</td><td>400.06</td><td>$20,283.04</td><td>1,221.30</td><td>$61,919.91</td></tr>
<tr><td>56</td><td>SIDEWALK, PCC, 6 IN.</td><td>SY</td><td>801.60</td><td>$80.00</td><td>$64,128.00</td><td>491.22</td><td>$39,297.60</td><td>801.60</td><td>$64,128.00</td></tr>
<tr><td>57</td><td>COMBINED SIDEWALK AND RETAINING WALL</td><td>CY</td><td>82.19</td><td>$275.00</td><td>$22,377.50</td><td></td><td></td><td>88.16</td><td>$24,244.00</td></tr>
<tr><td>58</td><td>CONCRETE STEPS</td><td>SF</td><td>72.00</td><td>$150.00</td><td>$10,800.00</td><td>21.00</td><td>$3,150.00</td><td>103.00</td><td>$15,450.00</td></tr>
<tr><td>59</td><td>DETECTABLE WARNING</td><td>SF</td><td>374.00</td><td>$47.25</td><td>$17,571.50</td><td>184.00</td><td>$8,694.00</td><td>434.00</td><td>$26,265.50</td></tr>
<tr><td>60</td><td>DRIVEWAY, PAVED, PCC, 6 IN.</td><td>SY</td><td>727.00</td><td>$74.40</td><td>$54,088.80</td><td>215.40</td><td>$15,025.76</td><td>938.79</td><td>$69,114.57</td></tr>
<tr><td>61</td><td>DRIVEWAY, GRANULAR</td><td>TON</td><td>34.00</td><td>$31.00</td><td>$1,054.00</td><td></td><td></td><td>18.06</td><td>$559.86</td></tr>
</table>
<table>
<tr>
<th>53</th>
<th>REMOVAL OF DRIVEWAY</th>
<th>SY</th>
<th>489.00</th>
<th>$8.00</th>
<th>$4,401.00</th>
<th>$ - </th>
<th>1,145.49</th>
<th>$ 10,309.41</th>
</tr>
<tr>
<th>54</th>
<th>REMOVAL OF PAVEMENT</th>
<th>SY</th>
<th>820.00</th>
<th>$8.00</th>
<th>$7,200.00</th>
<th>$ - </th>
<th>804.85</th>
<th>$ 7,243.65</th>
</tr>
<tr>
<th>55</th>
<th>SIDEWALK, PCC, 4 IN.</th>
<th>SY</th>
<th>1221.30</th>
<th>$50.70</th>
<th>$61,919.91</th>
<th>400.06</th>
<th>20,283.04</th>
<th>1,221.30</th>
<th>$ 61,919.91</th>
</tr>
<tr>
<th>56</th>
<th>SIDEWALK, PCC, 6 IN.</th>
<th>SY</th>
<th>801.60</th>
<th>$80.00</th>
<th>$64,128.00</th>
<th>491.22</th>
<th>39,297.60</th>
<th>801.60</th>
<th>$ 64,128.00</th>
</tr>
<tr>
<th>57</th>
<th>COMBINED SIDEWALK AND RETAINING WALL</th>
<th>CY</th>
<th>82.10</th>
<th>$275.00</th>
<th>$22,377.50</th>
<th>$ - </th>
<th>88.16</th>
<th>$ 24,244.00</th>
</tr>
<tr>
<th>58</th>
<th>CONCRETE STEPS</th>
<th>SF</th>
<th>72.00</th>
<th>$150.00</th>
<th>$10,800.00</th>
<th>21.00</th>
<th>$3,150.00</th>
<th>103.00</th>
<th>$ 15,450.00</th>
</tr>
<tr>
<th>59</th>
<th>DETECTABLE WARNING</th>
<th>SF</th>
<th>374.00</th>
<th>$47.25</th>
<th>$17,571.50</th>
<th>184.00</th>
<th>$8,694.00</th>
<th>434.00</th>
<th>$ 20,506.50</th>
</tr>
<tr>
<th>60</th>
<th>DRIVEWAY, PAVED, PCC, 6 IN</th>
<th>SY</th>
<th>727.00</th>
<th>$74.40</th>
<th>$54,088.80</th>
<th>215.40</th>
<th>$15,025.76</th>
<th>938.79</th>
<th>$ 69,845.97</th>
</tr>
<tr>
<th>61</th>
<th>DRIVEWAY, GRANULAR</th>
<th>TON</th>
<th>34.00</th>
<th>$31.00</th>
<th>$1,054.00</th>
<th>$ - </th>
<th>18.06</th>
<th>$ 559.86</th>
</tr>
<tr>
<th>62</th>
<th>SLOPE PROTECTION, WOOD EXCLESOR MAT</th>
<th>SQ</th>
<th>7.00</th>
<th>$100.00</th>
<th>$700.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>63</th>
<th>STABILIZING CROP SEEDING, FERTILIZING, (URBAN)</th>
<th>ACRE</th>
<th>0.50</th>
<th>$1,500.00</th>
<th>$750.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>64</th>
<th>CONVENTIONAL SEEDING, SEEDING, FERT., AND MULCHING</th>
<th>ACRE</th>
<th>1.25</th>
<th>$3,500.00</th>
<th>$4,375.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>65</th>
<th>PERIMETER+SLOPE SEDIMENT CONTROL DEVICE 9 INCH</th>
<th>LF</th>
<th>300.00</th>
<th>$3.00</th>
<th>$900.00</th>
<th>$ - </th>
<th>575.00</th>
<th>$ 1,725.00</th>
</tr>
<tr>
<th>66</th>
<th>PERIMETER+SLOPE SEDIMENT CONTROL DEVICE 12 INCH</th>
<th>LF</th>
<th>300.00</th>
<th>$4.00</th>
<th>$1,200.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>67</th>
<th>REMOVE PERIMETER+SLOPE SEDIMENT CONTROL DEVICE</th>
<th>LF</th>
<th>600.00</th>
<th>$8.50</th>
<th>$5,100.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>68</th>
<th>REVETMENT, CLASS D</th>
<th>TON</th>
<th>20.00</th>
<th>$60.00</th>
<th>$1,200.00</th>
<th>$ - </th>
<th>11.24</th>
<th>$ 674.40</th>
</tr>
<tr>
<th>69</th>
<th>EROSION STONE</th>
<th>TON</th>
<th>5.00</th>
<th>$120.00</th>
<th>$500.00</th>
<th>$ - </th>
<th>8.31</th>
<th>$ 997.20</th>
</tr>
<tr>
<th>70</th>
<th>SWPPP MANAGEMENT</th>
<th>LS</th>
<th>1.00</th>
<th>$6,300.00</th>
<th>$6,300.00</th>
<th>$ - </th>
<th>0.80</th>
<th>$ 5,040.00</th>
</tr>
<tr>
<th>71</th>
<th>Mobilization</th>
<th>LS</th>
<th>1.00</th>
<th>$135,000.00</th>
<th>$135,000.00</th>
<th>$ - </th>
<th>1.00</th>
<th>$ 135,000.00</th>
</tr>
<tr>
<th>72</th>
<th>TRAFFIC CONTROL</th>
<th>LS</th>
<th>1.00</th>
<th>$15,000.00</th>
<th>$15,000.00</th>
<th>0.10</th>
<th>1,500.00</th>
<th>1.00</th>
<th>$ 15,000.00</th>
</tr>
<tr>
<th>73</th>
<th>RELOCATION OF MAILBOXES</th>
<th>EACH</th>
<th>8.00</th>
<th>$573.00</th>
<th>$3,784.00</th>
<th>$ - </th>
<th>6.00</th>
<th>$ 2,250.00</th>
</tr>
<tr>
<th>74</th>
<th>REMOVAL OF SIGNS</th>
<th>EACH</th>
<th>29.00</th>
<th>$350.00</th>
<th>$10,150.00</th>
<th>$ - </th>
<th>24.00</th>
<th>$ 8,640.00</th>
</tr>
<tr>
<th>75</th>
<th>REMOVE AND REINSTALL SIGNS</th>
<th>EACH</th>
<th>17.00</th>
<th>$150.00</th>
<th>$2,550.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>76</th>
<th>TYPE A SIGNS</th>
<th>SF</th>
<th>95.05</th>
<th>$20.00</th>
<th>$1,901.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>77</th>
<th>STEEL POSTS FOR TYPE A SIGNS</th>
<th>LF</th>
<th>728.00</th>
<th>$13.00</th>
<th>$9,464.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>78</th>
<th>LIGHT POLES</th>
<th>EACH</th>
<th>12.00</th>
<th>$3,200.00</th>
<th>$38,400.00</th>
<th>2.00</th>
<th>$5,400.00</th>
<th>12.00</th>
<th>$ 38,400.00</th>
</tr>
<tr>
<th>79</th>
<th>ELECTRICAL CIRCUITS</th>
<th>LF</th>
<th>2237.00</th>
<th>$15.00</th>
<th>$33,555.00</th>
<th>399.00</th>
<th>$5,985.00</th>
<th>2,237.00</th>
<th>$ 33,555.00</th>
</tr>
<tr>
<th>80</th>
<th>HANDHOLES AND JUNCTION BOXES</th>
<th>EACH</th>
<th>5.00</th>
<th>$1,000.00</th>
<th>$5,000.00</th>
<th>1.00</th>
<th>$1,000.00</th>
<th>5.00</th>
<th>$ 5,000.00</th>
</tr>
<tr>
<th>81</th>
<th>PAINTED PAV'T MARKS, WATERBORNE/SOLVENT BASED</th>
<th>STA</th>
<th>37.44</th>
<th>$150.00</th>
<th>$5,616.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>82</th>
<th>PAINTED PAV'T SYMBOLS, WATERBORNE/SOLVENT BASED</th>
<th>EACH</th>
<th>3.00</th>
<th>$153.00</th>
<th>$459.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>83</th>
<th>REMOVAL OF FENCE, CHAIN LINK</th>
<th>LF</th>
<th>106.00</th>
<th>$15.00</th>
<th>$1,590.00</th>
<th>$ - </th>
<th>$ - </th>
<th>$ - </th>
</tr>
<tr>
<th>84</th>
<th>SPOT REPAIRS, SANITARY SEWER, BY COUNT</th>
<th>EACH</th>
<th>1.00</th>
<th>$250.00</th>
<th>$250.00</th>
<th>$ - </th>
<th>3.00</th>
<th>$ 750.00</th>
</tr>
<tr>
<th>85</th>
<th>SPOT REPAIRS, SANITARY SEWER, BY LINEAR FOOT</th>
<th>LF</th>
<th>15.00</th>
<th>$400.00</th>
<th>$6,000.00</th>
<th>$ - </th>
<th>61.00</th>
<th>$ 24,400.00</th>
</tr>
<tr>
<th colspan="8">TOTAL OF THE BASE BID (Total of Items 1-85):</th>
<th>$2,134,856.90</th>
<th>$1,61,204.98</th>
<th>$2,165,638.67</th>
</tr>
</table>
CO1 16-Inch Subgrade Stabilization
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td>Polymer Grid Subgrade Stabilization</td>
<td>CY</td>
<td>346.00</td>
<td>$75.00</td>
<td>$25,950.00</td>
<td>$ - </td>
<td>412.31</td>
<td>$ 30,923.25</td>
</tr>
<tr>
<td>Utility Conflict Delay</td>
<td>SY</td>
<td>2,077.11</td>
<td>$3.50</td>
<td>$7,269.89</td>
<td>$ - </td>
<td>3,253.20</td>
<td>$ 11,386.21</td>
</tr>
<tr>
<td>Utility Conflict Delay</td>
<td>HR</td>
<td>8.00</td>
<td>$450.00</td>
<td>$3,600.00</td>
<td>6.00</td>
<td>2,700.00</td>
<td>20.00</td>
<td>$ 9,020.00</td>
</tr>
</table>
CO2 Additional tree removal
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td>Fire Hydrant Extension</td>
<td>LS</td>
<td>1.00</td>
<td>$7,800.00</td>
<td>$7,800.00</td>
<td>$ - </td>
<td>1.00</td>
<td>$ 7,800.00</td>
</tr>
<tr>
<td>Addition Concrete 107 Third Street</td>
<td>LS</td>
<td>-1.00</td>
<td>$1,200.00</td>
<td>$1,200.00</td>
<td>$ - </td>
<td>1.00</td>
<td>$ 1,200.00</td>
</tr>
<tr>
<td>Additional Drainable Backfill for Wall</td>
<td>LF</td>
<td>440.00</td>
<td>$22.50</td>
<td>$9,900.00</td>
<td>$ - </td>
<td>440.00</td>
<td>$ 9,900.00</td>
</tr>
</table>
CO3 Remove and replace Retaining Wall 330 Summerhays
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td>Lower Existing Water Line 331 Summerhays</td>
<td>LS</td>
<td>1.00</td>
<td>$1,450.00</td>
<td>$1,450.00</td>
<td>$ - </td>
<td>1.00</td>
<td>$ 1,450.00</td>
</tr>
<tr>
<td>Winter Stabilization Mulch</td>
<td>LS</td>
<td>1.00</td>
<td>$3,250.00</td>
<td>$3,250.00</td>
<td>$ - </td>
<td>1.00</td>
<td>$ 3,250.00</td>
</tr>
</table>
CO4 Watermain Conflict, 8-inch
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td>Water Service Abandonment 1-inch</td>
<td>LS</td>
<td>1.00</td>
<td>$2,100.00</td>
<td>$2,100.00</td>
<td>$ - </td>
<td>1.00</td>
<td>$ 2,100.00</td>
</tr>
<tr>
<td>Water Service Abandonment 2-inch</td>
<td>LS</td>
<td>1.00</td>
<td>$2,100.00</td>
<td>$2,100.00</td>
<td>$ - </td>
<td>1.00</td>
<td>$ 2,100.00</td>
</tr>
<tr>
<td>Sewer Service Abandonment</td>
<td>LS</td>
<td>1.00</td>
<td>$1,200.00</td>
<td>$1,200.00</td>
<td>$ - </td>
<td>1.00</td>
<td>$ 1,200.00</td>
</tr>
<tr>
<td>SW-501 Intake (Mod.)</td>
<td>EACH</td>
<td>1.00</td>
<td>$6,743.40</td>
<td>$5,743.40</td>
<td>$ - </td>
<td>1.00</td>
<td>$ 6,743.40</td>
</tr>
</table>
CO5 Water Service 6-inch
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td>Storm Sewer Service 8-inch</td>
<td>EACH</td>
<td>1.00</td>
<td>$10,807.49</td>
<td>$10,807.49</td>
<td>$ - </td>
<td>1.00</td>
<td>$ 10,807.49</td>
</tr>
</table>
CC6 Additional 6-inch Subgrade Stabilization
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td>Additional Polymer Grid Subgrade Stabilization</td>
<td>CY</td>
<td>50.00</td>
<td>$75.00</td>
<td>$3,750.00</td>
<td>$ - </td>
<td>50.00</td>
<td>$ 3,750.00</td>
</tr>
<tr>
<td>Additional Polymer Grid Subgrade Stabilization</td>
<td>SY</td>
<td>300.00</td>
<td>$3.50</td>
<td>$1,050.00</td>
<td>$ - </td>
<td>300.00</td>
<td>$ 1,050.00</td>
</tr>
</table>
CO7 Additional 6-inch Subgrade Stabilization
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td>Additional Polymer Grid Subgrade Stabilization</td>
<td>CY</td>
<td>85.56</td>
<td>$75.00</td>
<td>$6,417.00</td>
<td>$ - </td>
<td>68.62</td>
<td>$ 5,146.50</td>
</tr>
<tr>
<td>Additional Polymer Grid Subgrade Stabilization</td>
<td>SY</td>
<td>513.33</td>
<td>$3.50</td>
<td>$1,796.66</td>
<td>$ - </td>
<td>534.32</td>
<td>$ 1,870.12</td>
</tr>
</table>
CO8 Reconstruction of Sanitary Sewer Services
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td>Full Depth Patch, 9-Inch PCC</td>
<td>SY</td>
<td>349.35</td>
<td>$165.00</td>
<td>$57,642.75</td>
<td>323.10</td>
<td>$53,311.50</td>
<td>323.10</td>
<td>$ 53,311.50</td>
</tr>
</table>
CHANGE ORDER SUB-TOTAL
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>73,211.11</td>
<td></td>
<td>198,748.08</td>
</tr>
</table>
AMOUNT EARNED TOTAL
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>234,416.09</td>
<td></td>
<td>2,304,386.75</td>
</tr>
</table>
9998 Materials Stored on-site
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$ - </td>
<td></td>
<td>$ - </td>
</tr>
</table>
9999 Materials Installed on-site (Deduct)
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$ - </td>
<td></td>
<td>$ - </td>
</tr>
</table>
MATERIALS SUB-TOTAL
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$ - </td>
<td></td>
<td>$ - </td>
</tr>
</table>
TOTAL
<table>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>234,416.09</td>
<td></td>
<td>2,304,386.75</td>
</tr>
</table>
Sheets in this document
- p. 37 1 · Lots Layout · Shoemaker & Haaland · Valley Subdivision (37-20)
- p. 38 2 · DWN: MJW Survey Date(S): 2024 · Valley Subdivision (37-20)
- p. 54 Preliminary Plat · MMS Consultants
- p. 247 Renewal Communications Flow
- p. 275 City of Tiffin FY 25-26 Town Hours by Month (chart; data on p. 274)
- p. 278 City of Tiffin FY 25-26 (chart; data on p. 276)
- p. 309 2nd Floor In Wall Rough In · Prep/Pour/Strip Slab on Grade
Sources
- revize: Agenda packet (packet_2026-02-17_520e00e5-d070-4eea-a5c2-4e5eec3f920e.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated November 1, 2026. Built from the archive's documents; see how the data is built.