Text from the PDF text layer; check the PDF for anything that matters. PROJECT UPDATE A Review of MSA Projects in Your Community
City of Tiffin, IA
CLIENT LIAISON:
Andrew Inhelder, PE
Office: 319.364.4773
Cell: 515.802.0906
[email protected]
DATE:
May 1, 2026
ON-GOING PROJECTS
REVERSE OSMOSIS WATER TREATMENT PLANT DESIGN – CLINT WIENEN
The precast walls and ceiling for the RO Building have been installed. Rough-Ins for the underground
plumbing and electrical are ongoing below the RO Building floor slab. The Contractor is planning to install
the roof trusses for the RO Building in the next couple of weeks and pour the floor slab towards the end of
the month. The slab and two (2) wall pours have been completed for the clearwell. They are also planning
to have the clearwell concrete completed by the end of the month. They will also be pouring the footings
and foundation walls for the existing water treatment plant expansion in the next few weeks.
SYSTEMWIDE SANITARY SEWER MODEL – ERIC THOMPSON
MSA is updating the land use data, to reflect known (but not yet completed) development in the City to be
the new benchmark for existing conditions. The City is completing drawn down tests on the lift stations.
Once completed, MSA will integrate the draw down results into the sanitary model, export outputs, and
finalize the model construction.
MSA is creating future growth maps and identifying key infrastructure placement for future development
to be discussed with City.
VILLAGE DRIVE & ROBERTS FERRY ROAD SIGNAL DESIGN – CHAD WAGNER
Project is out to bid with bids due on May 14th 2026 at 10AM.
PROJECT UPDATE
Page 1 of 5
Sources
- revize: L.1 (bQuIgxXrkqSyCfWyn2D7mUeuvMsTjq.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: L-1 City Engineer Report
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.