August 28, 2026
PROJECT UPDATE
Upcoming Infrastructure
Description Next Steps/Schedule
Project
The current wastewater treatment facility (WWTF) has a chloride Final Compliance with NPDES
compliance schedule. There is not any wastewater treatment Permit required October 1, 2025.
equipment/processes designed to remove chloride so typically
source control is the only economical means of meeting MSA presented its findings on
Wastewater Treatment
compliance. The existing treatment facility is at about 50% November 1st, 2022. MSA has
Improvements
capacity. However, if the past growth rate continues an expansion prepared a proposed schedule
will be required in the next 5-7 years. for wastewater treatment, water
treatment and water supply
From design to construction the process typically takes 3-4 years. improvement projects.
Due to the City's continued growth and the new water treatment
plant, it was noted that Well #6 may need to be brought online
MSA will solicit quotes from
within the next 12 months. The only work recommended for the
Well 6 qualified well drilling
City is the well acidization and test pumping. The testing results will
contractors.
provide the information needed to properly size the pump,
watermain, electrical service, and other associated infrastructure.
North Park Road & Aster Drive MSA is preparing a PSA for review by the City to signalize this MSA is preparing a PSA for
Intersection Improvements intersection. review by the City.
PROJECT UPDATE
Page 5 of 5
Sheets in this document
- p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 24 Weatherstripping - Jamb Weatherstripping
- p. 25 Certifications: *Unnotched & Notched profiles available
- p. 26 Thresholds - Saddle
- p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 45 10A100 · Safety Plan · MSA · Overall Facility
- p. 46 10A101 · Life Safety Plan · MSA
- p. 47 Floor Limits (Graphical · MSA
- p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
- p. 49 Plan Review Comm · MSA · Proposed
- p. 50 Typical Architectural Details · MSA
- p. 51 Typical Details and Schedule Architectural Schedules · MSA
- p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 53 99H601 · HVAC Schedules · MSA
- p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
- p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
- p. 57 Typical Structural Details · MSA
- p. 58 MSA
- p. 62 Power Plan · MSA
- p. 77 EJ1A · Roof Trusses Layout
- p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
- p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
- p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
- p. 82 MT20 · Notes
- p. 160 Exhibit A: Project Location