other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Document 280
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 560 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP
G. Failure to Act. The failure of the Planning and Zoning Commission
to act on an application within 120 days following formal filing of the
application may be appealed to the Board of Adjustment.
H. Appeal of Decision. Following the determination of the Council,
based on the recommendation of the Planning and Zoning Commission, the
applicant or any person aggrieved shall have the option of filing an appeal to
the Board of Adjustment. An appeal shall be filed within 10 days of the
Council’s decision.
I. Continued Enforcement.
(1) The Planning and Zoning Commission or Zoning
Administrator must investigate any purported violation of
performance standards. Uses, buildings, or structures lawfully
established prior to the effective date† and subject to performance
standards existing at that time, may be found to be in violation with
those previously applicable standards. Alleged violations may be
brought to the Council’s attention by City staff, a peace officer,
health, or environmental employees, officials, or citizens. If a
violation is alleged, the Zoning Administrator shall inform the
suspected perpetrator and must initiate an independent engineering
analysis consistent with the analysis procedure outlined in Paragraph
F. Administrative determinations made in conjunction with the
analysis may be appealed according to Paragraph H.
J. Revocation of Permits. If an alleged violation is determined to be
valid by the independent engineering analysis, any permits previously issued
in conjunction with the established use, building, or structure are void and the
operator shall cease operation until the violation is remedied. Failure to cease
operation within two days of notice to do so by the City constitutes a violation
of this Zoning Code and the penalty provision cited in Section 165.32 may be
imposed.
K. Technical Provisions.
(1) Noise
a. To measure the intensity and frequency of sound, the
sound level meter, the octave band analyzer, and the impact
noise analyzer may be employed. The flat network and the
fast meter response of the sound level meter may be used.
Sounds of short duration that cannot be measured accurately
with the sound level meter may be measured with the impact
noise analyzer. Octave band analyzers calibrated in the
preferred frequencies (American Standards Association S1
6-1960, Preferred Frequencies for Acoustical
Measurements) must be used with the following tables. The
suspected perpetrator will be required to hire, at the approval
of the City, a consultant to measure, record, and report to the
Council results about compliance with this Code. All costs
shall be the responsibility of the property owner.
†
EDITOR’S NOTE: Language adding these performance standards was adopted by Ordinance No.
2018-433 on June 19, 2018.
CODE OF ORDINANCES, TIFFIN, IOWA
- 1688 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.