other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Document 280
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 559 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP
engineering principles. In addition, the Planning and Zoning Commission
may require the applicant to submit:
(1) A plot plan showing the location of all present and proposed
structures, drives, parking lots, waste disposal areas, bulk storage
areas, streets, streams, or other significant features on or within 200
feet of the proposed site.
(2) A description of the activity to be conducted regarding waste
products, external effects, or other conditions that are regulated
herein; provided, however, that the applicant shall not be required to
reveal any trade secrets or sufficient detail with regard to a process
that would cause any secret process or manufacturing procedure for a
closely guarded proprietary compound or product to become public
knowledge and be available to competitors.
(3) The type and location of abatement devices to control, or
recording instruments to measure conformance with required
standards, not including devices and instruments that are inherent in
the manufacturing process.
(4) Such other data and certification as may reasonably be
required by the Planning and Zoning Commission to reach a
determination.
(5) All information and evidence submitted in applications to
indicate conformity to performance standards shall constitute a
certification and an agreement on the part of the applicant that the
proposed use can and will conform to such standards at all times.
D. Administrative Options. The Planning and Zoning Commission may
approve and authorize the establishment of the use, building, or structure if all
pertinent provisions of this Zoning Code and other applicable ordinances are
complied with. If, however, the Planning and Zoning Commission determines
that the proposed use, building, or structure does not comply with
performance standards, they shall inform the applicant that either more
information is necessary or that an independent engineering analysis of the
proposed use, building, or structure is required prior to final Council approval.
E. Need for Independent Engineering Analysis. If the Planning and
Zoning Commission determines that reason exists to doubt the compliance
with any applicable performance standard provision, a State licensed
professional engineer of the City’s choosing (but acceptable to the petitioner)
may be asked to analyze the prospects of compliance. Costs of such analysis
shall be paid by the applicant.
F. Use of Independent Engineering Analysis. Upon submission of an
independent engineering analysis authorized by the City, the Planning and
Zoning Commission shall authorize establishment of the use, building, or
structure if the independent analysis confirms probable compliance with this
provision and if all other applicable provisions of this and other City
ordinances are satisfied. If, however, the independent engineering analysis
indicates that the proposed use, building, or structure is not likely to comply
with this provision, then the application shall be denied until such time that
the proposal is able to comply fully.
CODE OF ORDINANCES, TIFFIN, IOWA
- 1687 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.