other · C

Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT

Open the PDF Searchable PDF tesseract layer

Page 559 of 718

Text from the PDF text layer; check the PDF for anything that matters.
CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP engineering principles. In addition, the Planning and Zoning Commission may require the applicant to submit: (1) A plot plan showing the location of all present and proposed structures, drives, parking lots, waste disposal areas, bulk storage areas, streets, streams, or other significant features on or within 200 feet of the proposed site. (2) A description of the activity to be conducted regarding waste products, external effects, or other conditions that are regulated herein; provided, however, that the applicant shall not be required to reveal any trade secrets or sufficient detail with regard to a process that would cause any secret process or manufacturing procedure for a closely guarded proprietary compound or product to become public knowledge and be available to competitors. (3) The type and location of abatement devices to control, or recording instruments to measure conformance with required standards, not including devices and instruments that are inherent in the manufacturing process. (4) Such other data and certification as may reasonably be required by the Planning and Zoning Commission to reach a determination. (5) All information and evidence submitted in applications to indicate conformity to performance standards shall constitute a certification and an agreement on the part of the applicant that the proposed use can and will conform to such standards at all times. D. Administrative Options. The Planning and Zoning Commission may approve and authorize the establishment of the use, building, or structure if all pertinent provisions of this Zoning Code and other applicable ordinances are complied with. If, however, the Planning and Zoning Commission determines that the proposed use, building, or structure does not comply with performance standards, they shall inform the applicant that either more information is necessary or that an independent engineering analysis of the proposed use, building, or structure is required prior to final Council approval. E. Need for Independent Engineering Analysis. If the Planning and Zoning Commission determines that reason exists to doubt the compliance with any applicable performance standard provision, a State licensed professional engineer of the City’s choosing (but acceptable to the petitioner) may be asked to analyze the prospects of compliance. Costs of such analysis shall be paid by the applicant. F. Use of Independent Engineering Analysis. Upon submission of an independent engineering analysis authorized by the City, the Planning and Zoning Commission shall authorize establishment of the use, building, or structure if the independent analysis confirms probable compliance with this provision and if all other applicable provisions of this and other City ordinances are satisfied. If, however, the independent engineering analysis indicates that the proposed use, building, or structure is not likely to comply with this provision, then the application shall be denied until such time that the proposal is able to comply fully. CODE OF ORDINANCES, TIFFIN, IOWA - 1687 -

Sources

  • revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...

This document's details as JSON

Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.