engineering report · M-6
M-6 - City Engineer Report
Page 1 of 2
Text from the PDF text layer; check the PDF for anything that matters. PROJECT UPDATE A Review of MSA Projects in Your Community
City of Tiffin, IA
CLIENT LIAISONS:
Kevin Bailey, PE / Abby Mouw, P.E.
Office: 319.364.4773
Cell(s): 319.855.8392/ 563.260.6880
[email protected] / [email protected]
DATE:
May 2, 2022
ENGINEERING SERVICES
Transition Announcement
Joe Elsinger is stepping down in May. MSA remains committed to providing full, quality service to the City of
Tiffin. Kevin Bailey, PE is transitioning in as lead for City of Tiffin projects. Kevin, Abby and Joe met with the City
Administrator and Staff on 4/25 to discuss the transition and current projects. Joe has enjoyed working with
the City of Tiffin but has decided to make a career change on the Mayo Clinic’s Facilities and Operations team.
The City of Tiffin should expect our current level of service to continue uninterrupted.
Upcoming Projects
As MSA gains familiarity with the City’s infrastructure and engineering needs, we will continue to advise the
City on anticipated major projects for planning purposes. A summary of major upcoming infrastructure projects
are listed below.
Major Upcoming Description Next Steps/Schedule
Infrastructure Project
Wastewater Treatment The current wastewater treatment facility (WWTF) has a Final Compliance with NPDES
Improvements chloride compliance schedule. This may be addressed by Permit required October 1, 2025.
removing chloride from the wastewater collection system, or MSA has prepared scope of
additional treatment at the plant. Another major consideration services for initial evaluation.
is that the existing treatment facility is at or near capacity for
BOD (Biological Oxygen Demand) loadings. Future growth for
the City will require additional treatment capacity.
Water System Scope includes additional capacity (wells and water treatment Planning through project
Improvements plant expansion) and new water tower. Work is underway to completion for water treatment
provide additional capacity with new wells as required by & storage improvements (new
additional demand. If the City chooses to reduce chloride in the tower) takes 2-3 years. MSA has
wastewater system (see above) by treating the water treatment prepared scope of services for
plant’s backwash water and/or reducing softener usage by initial evaluation.
customers, significant modifications will be required to the
City’s water treatment processes.
Park Road Improvements We understand this is a high priority project with the City to Design 2023/Construction 2024
relieve congestion on the old 2-lane section of roadway. MSA
remains available for planning and design of the final phase of
Park Road from near Aster Drive to Hwy 6 when funding
becomes available.
PROJECT UPDATE
Page 1 of 2