other · K-2

K-2 - Power ro Deerview Park - AED

Open the PDF Searchable (OCR) PDF

Page 1 of 2

Text read by the vision model; check the PDF for anything that matters.
Neumiller Electric Inc. Phone: 319-665-9036 Fax: 319-333-1370 FULL SERVICE ELECTRICAL CONTRACTOR Name / Address City of Tiffin 300 Railroad St. PO Box 259 Tiffin, IA 52340 <table> <tr> <th colspan="4">Project</th> </tr> <tr> <th colspan="4">Deer View Park-Shelter Power & Wiring</th> </tr> <tr> <th>Description</th> <th>Qty</th> <th>Rate</th> <th>Total</th> </tr> <tr> <td>Deer View Park-Shelter Power & Wiring<br><br>-Provide and install a free standing combination 200 Amp 1 phase meter socket/panel about 120' north of the shelter as discussed with Jeff from REC. The meter socket will be installed by the power company's transformer or secondary box that will be installed in this location by REC.<br>-Provide and install underground conduit and wire from the meter socket to the power company connection point.<br>-Provide and install a 100 Amp weatherproof panel in the shelter. New circuit breakers will be provided and installed as needed for the new outlets and lighting circuits that will be installed.<br>-Provide and install a 100 Amp 240 volt 1 phase circuit underground from the meter socket to the panel in the shelter.<br>-Provide and install grounding as needed to meet code.<br>-Provide and install 3 new weatherproof duplex receptacles in the shelter. There will be one on the north side mounted on the structural 4x4' pole below the electrical panel, one on the south side mounted on the center east pole, and one on the southeast pole for an AED as discussed with Brian.<br>-Provide and install 2 new 6" surface mounted disk lights on the ceiling of the shelter. The lights will be controlled by the circuit breaker as discussed with Brian.<br>-This does not include any other wiring or work that is not listed.<br>-This does not include any power company charges.<br><br>-NOTE: Jeff Brimeyer from REC estimates their charges to be approximately $4,500.00. This is not included in the estimated cost above.</td> <td>1</td> <td>6,375.00</td> <td>6,375.00</td> </tr> </table> Total $6,375.00

Sources

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.