bid award · K-2
K-2 - Railing Quote for 300 Block Summerhays - Orignal Town Project Phase 3
Page 1 of 2
Text read by the vision model; check the PDF for anything that matters.Beisser Lumber Company
415 Westcor Drive
Coralville, IA 52241
Phone: (319)-545-7120
Bill To: City Of Tiffin
300 Railroad Street
PO Box#259
Tiffin, IA 52340
Ship To: City Of Tiffin
General Purchases
PO Box#259
Tiffin, IA 52340
QUOTE
0001340783
Account: CITY2600 0001
Branch: 40CV
Phone: (319)-545-2572
Fax: ( ) -
<table>
<tr>
<th>PO:</th>
<th colspan="2">Ref: Wall Rails</th>
<th>Job:</th>
</tr>
<tr>
<td>Activation Date:</td>
<td>03/21/25</td>
<td>Sales Agents</td>
<td>Type: Delivery<br>Quoted For: Quoted By: austinb</td>
<td>Ship Via:</td>
</tr>
<tr>
<td>Close Date:</td>
<td>04/05/25</td>
<td>austinb</td>
<td></td>
<td></td>
</tr>
</table>
<table>
<tr>
<th>QUANTITY</th>
<th>UOM</th>
<th>ITEM/DESCRIPTION</th>
<th>PRICE/UOM</th>
<th>AMOUNT</th>
</tr>
<tr>
<td>2</td>
<td>Each</td>
<td>Westbury TUSC-C101 6' Level Rail Tx Blk<br>42" Rail Holght</td>
<td>195.00/Each</td>
<td>390.00</td>
</tr>
<tr>
<td>46</td>
<td>Each</td>
<td>Westbury 42" TUSC-C101 8' Level Rail Tx Blk</td>
<td>250.00/Each</td>
<td>11,500.00</td>
</tr>
<tr>
<td>52</td>
<td>Each</td>
<td>Westbury 2x2 43" Post Kit Text Black<br>70992 TBK</td>
<td>57.50/Each</td>
<td>2,990.00</td>
</tr>
<tr>
<td>8</td>
<td>Ctn</td>
<td>GRK 19/64x2-3/4" Caliburn-XL 25/ct<br>Use T-40 bit</td>
<td>38.75/CTN</td>
<td>310.00</td>
</tr>
<tr>
<td colspan="4">Subtotal</td>
<td>15,190.00</td>
</tr>
</table>
Return Policy:
- Stock material can be returned up to 180 days after invoicing.
- All returns must be clean, uncut, no visible defects, and suitable for resale. Non-Sellable material will be disposed of.
- Beisser Lumber reserves the right to inspect material before issuing credit.
- Product sold in bundled packages, as rail, paired, exact quantities must be returned in same quantities & proper condition.
- Non-stock items, if accepted for credit within 30 days, a restocking charge will be assessed. NOTE: Substantial time delay when processing these credits, since we must first return the items to our supplier.
- Supplier will also inspect items before a credit can be processed.
- Delay times of three or more weeks are not unusual.
- Windows, Doors, & Prefinished Trim cannot be returned.
- Our return policy is subject to change without notice.
Quote Disclaimer: Please review carefully as we agree to furnish only the items listed above. Quote is valid for 15 days and delivery taken within 30 days. Sales Tax rate subject to change based off job address. Clerical errors subject to correction.
Payment Terms:
Due 10th of Following Month
Total: $15,190.00
Sources
- sharepoint (K-2 - Railing Quote for 300 Block Summerhays - Orignal Town Project Phase 3.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.