contract agreement · K-2

K-2 - Pay Application #1 – Maxwell Construction, Tiffin Heights West Watermain Extension

Open the PDF Searchable (OCR) PDF

Page 1 of 2

Text read by the vision model; check the PDF for anything that matters.
Doug Boldt From: Andrew Inhelder <[email protected]> Sent: Wednesday, August 14, 2024 4:29 PM To: Doug Boldt Subject: RE: Tiffin Heights West- Public Improvements Pay App 1 Hi Doug, After discussion with the contractor this morning, the section along Half Moon Ave has not passed pressure test yet and I have not seen an approved easement document for the section installed outside of the City ROW. Due to that, I recommend paying for the portion of the water main that has passed testing and is installed within the ROW along the Hwy. I’ve broken that quantity down below. In summary, paying 67.5% of the 329,323.00 or $222,293.03. <table> <tr> <th> </th> <th>Plan Quantity</th> <th>Uncompleted N/S Run</th> <th>Work Completed</th> <th>Unit Price</th> <th>Total</th> </tr> <tr> <td>1 8" PVC Watermain</td> <td>20</td> <td>-</td> <td>20</td> <td>$ 33.00</td> <td>$ 660.0</td> </tr> <tr> <td>2 12" PVC Watermain</td> <td>2,418</td> <td>510</td> <td>1,908</td> <td>$ 63.00</td> <td>$ 120,204.0</td> </tr> <tr> <td>3 12" PVC Restrained Joint Watermain</td> <td>590</td> <td>80</td> <td>510</td> <td>$ 80.00</td> <td>$ 40,800.0</td> </tr> <tr> <td>4 Directional Drill 12" Watermain</td> <td>113</td> <td>-</td> <td>113</td> <td>$ 135.00</td> <td>$ 15,255.0</td> </tr> <tr> <td>5 Bore & Jack 12" Watermain w/22" Casing</td> <td>105</td> <td>105</td> <td>-</td> <td>$ 770.00</td> <td>$ -</td> </tr> <tr> <td>6 8" Gate Valve</td> <td>1</td> <td>-</td> <td>1</td> <td>$ 2,500.00</td> <td>$ 2,500.0</td> </tr> <tr> <td>7 12" Gate Valve</td> <td>14</td> <td>3</td> <td>11</td> <td>$ 4,350.00</td> <td>$ 47,850.0</td> </tr> <tr> <td>8 Fire Hydrant Assembly</td> <td>8</td> <td>1</td> <td>7</td> <td>$ 7,800.00</td> <td>$ 54,600.0</td> </tr> <tr> <td>9 Connection to the Existing Watermain</td> <td>2</td> <td>1</td> <td>1</td> <td>$ 350.00</td> <td>$ 350.0</td> </tr> <tr> <td>10 Miscellaneous Water Fittings</td> <td>1.0</td> <td>0.2</td> <td>0.8</td> <td>$ 33,600.00</td> <td>$ 26,880.0</td> </tr> <tr> <td>11 Water Testing</td> <td>1.0</td> <td>0.2</td> <td>0.8</td> <td>$ 900.00</td> <td>$ 720.0</td> </tr> <tr> <td>12 Watermain Compacted Trench Backfill</td> <td>3,028</td> <td>590</td> <td>2,438</td> <td>$ 8.00</td> <td>$ 19,504.0</td> </tr> <tr> <td colspan="5">Total</td> <td>$ 329,323.0</td> </tr> </table> Thanks, Andrew

Sources

  • sharepoint (K-2 - Pay Application #1 – Maxwell Construction, Tiffin Heights West Watermain Extension.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.