other · C
Discussion and Review of Highway 6 Reconstruction Project and the Intersections of Croell Avenue and Kimberlite Street
Page 1 of 9
Text from the PDF text layer; check the PDF for anything that matters.City of Ti in – US 6 (Marengo Rd) Operations Analysis for Intersections with Croell Ave
and Kimberlite St.
Prepared by: MSA Professional Services, Inc.
Date: October 17, 2025
Project Overview
MSA Professional Services completed a tra ic operations review for two key intersections
along US 6 in the City of Ti&in:
1. US 6 & Croell Avenue
2. US 6 & Kimberlite Street
The study evaluated current and future tra ic conditions and assessed potential
intersection improvements needed to accommodate continued city growth and new
development north of US 6.
Alternatives Studied
Five intersection improvement options were evaluated as part of this review. Each
alternative assumes US 6 will be reconstructed to a three-lane cross section—one lane in
each direction with a two-way left-turn lane (TWLTL).
Option Croell Avenue Kimberlite Street
1 O&set right-turn lane Tra&ic Signal
Restricted access (right-in/right-out
2 Tra&ic Signal
only)
Restricted access (right-in/right-out
3 Tra&ic Signal
only)
4 Tra&ic Signal Tra&ic Signal
5 Tra&ic Signal Single-Lane Roundabout
These alternatives were selected to compare a range of design and operational strategies—
from limited-access control to full intersection control—to improve both safety and tra&ic
flow along the US 6 corridor.
Sources
- revize: Attachment (eIJR7D9HhC0paKyoYQYz7wRWIxothH.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (.WS - D - Highway 6 Project - Intersections of Croell and Kimberlite.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Highway 6 Reconstruction Project and the Intersections of...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.