Text from the PDF text layer; check the PDF for anything that matters.Construction Summary
Schedule Update
Scheduled March Activities: Scheduled April Activities:
• Foundation backfill (95%) • Interior metal studs
• PEMB Roofing (95%) (Soffit and Gutters left) • Mechanical, Electrical, Plumbing (MEP)
• PEMB exterior metal panels (85%) rough in’s (in wall and overhead)
• Locker Room CMU (100%) • Hanging drywall
• Slab on grade (90%)
• Slab on metal deck (100%)
• Running Track Steel (100%)
Manpower Report
List of major subcontractors & number of employees onsite:
Total number of employees: 23
• AAA Mechanical – 1 • Price Electric – 2
• Cedar Valley Steel – 5 • SG Construction – 8
• Merit Construction – 1
• Miron Concrete - 4
• Miron Construction Manager - 2
Delays
• Weather – See Daily Log Weather Report
‒ 1 days in March
• 3/16 – Blizzard conditions
Weather Delays (Construction)
Scheduled Occurred Left
12 10 2
• Materials & Labor
‒ N/A
Key Issues / Concerns & Recommended Action Steps
• Installation progress of exterior metal panels Deliver unmatched quality,
create meaningful
connections, and craft
unforgettable experiences in
everything we do. Capture
what truly matters and find
ways to inspire.
Owner Progress Report | 250120 March 2026 Miron Construction Co., Inc. | 8
Sheets in this document
- p. 30 1 · Rezoning Exhibit · MMS Consultants
- p. 75 Title Sheet · MSA · G1 Project Overview
- p. 76 CP1 · Elevation · MSA · Roberts Ferry RD & Village DR Signal Improvements
- p. 77 Removal Plan · MSA · Roberts Ferry RD & Village DR Signal Improvements
- p. 78 Traffic Control Plan · MSA · Roberts Ferry RD & Village DR Signal Improvements
- p. 79 Pavement Marking Plan · MSA · Village DR
- p. 80 Point Number & Elevation · MSA
- p. 81 Curb Ramp Details · MSA · Roberts Ferry RD & Village DR Signal Improvements
- p. 113 City of Tiffin FY 25-26 Town Hours by Month (chart; data on p. 112)
- p. 116 City of Tiffin FY 25-26 (chart; data on p. 114)
Sources
- revize: Agenda packet (packet_2026-04-21_40d71ad9-b59e-4a3a-a8d6-2b69c659f62d.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.