Discussion and Review of Potential Funding Opportunities through the IDOT for Trail and Pedestrian Tunnel Improvements — Hwy 6 Ped Underpass Options & Cost Estimate

Dated August 18, 2026City Council — work session, August 18, 2026 3 pages

Open the PDF

Page 1 of 3

Text from the PDF text layer; check the PDF for anything that matters.
Orange Route Yellow Route (Option 6, 600 FT (Option 4, 700 FT) - off page) Green route (Option 3, 1,500 FT) 10' trail from Croell Avenue to N. Route 10' trail through Kimberlite St 10' trail installed adjacent to roadway, regrading for swale needed, block wall potentially needed. Pink route (Option 5, 1,000 FT) 10' trail installed adjacent to roadway, regrading for swale needed, block wall potentially needed. Red (Option 1, 200 FT) Excavate end of existing ped tunnel, install wing walls on Blue Route (Option 2, both sides, add lighting and 125 FT) 200 FT sidewalk ramp with walls to access trail Route 10' trail

Sources

  • revize: Hwy 6 Ped Underpass Options & Cost Estimate (I2LTBrGdVFAyz18LtZ4Y62hjbQF9wE.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: C Discussion and Review of Potential Funding Opportunities through the IDOT for Trail...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.