Packet: Tiffin City Council Work Session (09/15/2026)
packet
Document 281
Dated September 15, 2026City Council — work session, September 15, 2026 730 pages
Ordinance 1983-117, Ordinance 2018-437, Ordinance 2010-302, Ordinance 2012-309, Ordinance 2007-288, Ordinance 2012-313, Ordinance 2007-287, Ordinance 2018-433, Ordinance 2019-446, Ordinance 2012-319, Ordinance 69
Open the PDF (opens in a new tab) Searchable PDF (opens in a new tab)
Packet: Tiffin City Council Work Session (09/15/2026), Page 368 of 730
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 158 SUDAS
length buried vertically to within one-foot of the finished
grade.”
H. 2D-1 D. 13. Add the following
“13. Other Jurisdictional Requirements:
a. No Corrugated PVC or HDPE pipe shall be installed within
the public right-of-way or with easements shared with other
utilities except for subsurface drainage pipes.
b. No corrugated PVC or HDPE pipe shall be used where the
pipe crosses easements used by other utilities.
c. Flared end sections are required at all storm sewer outlets
and shall include IDOT RF-14 ties and rip-rap or other
channel protection as recommended by the City Engineer.”
I. 2G-1 F. 5. Add the following subsection:
“5. Other Jurisdictional Requirements:
Refer to City of Tiffin Ordinances for specific requirements.
a. Dry Hydrant Installation.
1) All wet-bottom detention facilities shall have an
emergency vehicle accessible dry hydrant installed at the
direction of the Fire Chief. All dry hydrants installation sites
will be approved by the Fire Chief and construction drawings
will be approved by the Fire Chief and City Engineer.
2) Figures G-1.02 and 2G-1.03 show typical installation
details.”
CODE OF ORDINANCES, TIFFIN, IOWA
- 1360 -
Sources
- City agenda center (revize): Agenda packet (packet_2026-09-15_3ae8c189-9979-4d30-987b-38d0c38bde62.pdf) — where it was found first seen Oct 12, 2026
Data last updated November 5, 2026. Built from the archive's documents; see how the data is built.