other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Document 280
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 624 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP
200 feet of the exterior boundaries of the property for which
the change or repeal is proposed. Each unit owner within a
condominium regime is considered the owner of the area of
the lot proportionate to the number of units in the regime as
a whole.
(9) If the OPD District is approved, the City will record the
necessary documents, and the developer shall reimburse the City for
the recording fees.
K. Modifications to Plans Prior to Completion of Initial Construction.
(1) The City may approve minor modifications to approved plans
that are consistent with the original findings and conditions approved
in the formal process that would not intensify any potentially
detrimental effects for the project.
(2) A request for changes in an approved site plan or building
plan that would affect a condition of approval shall be treated as a
new application, except that such changes determined to be minor, in
the opinion of Council, may be approved by the Council.
L. Phased Development. An approved development may be built in
phases as part of the project’s plan if the construction and provisions of all
necessary elements including, but not limited to, parking, drainage, common
open spaces, landscaping, and public and recreational facilities which are
shown on the approved plan proceed at a rate commensurate with the
construction of buildings. If the City or its designee determines that the rate
of building construction is not commensurate with the construction of the
aforementioned necessary elements, the City, or its designee, shall notify the
developer that no Building Permits will be issued until the rate of construction
conforms accordingly. Failure to comply with the terms of this section in a
timely manner shall result in all construction being halted until compliance is
restored.
M. Conformance with Approved Plan - Modifications After Initial
Construction. When the project has been completed, the use of the lands and
construction, modification, or alterations of any buildings or structures within
the development shall remain in conformance with the approved development
plan. However, any minor alteration or modification of existing buildings
may be reviewed and approved by the City if the request is found to be
consistent with the purpose and intent of the approved development plan.
8. Exceptions. The approval criteria contained in this section are to be used by
the City as a minimum requirement for evaluating planned developments. However,
such criteria are not intended to restrict creativity and an applicant may request in
writing, modifications to the planned development approval criteria. The City will
use the following criteria when evaluating any such request:
A. The modification will be in harmony with the purpose and intent of
the City Zoning Code and the comprehensive plan.
B. The modification will generally enhance the proposed planned
development and will not have adverse impact on its physical, visual, or
spatial characteristics.
CODE OF ORDINANCES, TIFFIN, IOWA
- 1772 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.