other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Document 280
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 621 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP
J. OPD District Formal Approval Process. After completion of all
planning requirements, an OPD Concept District or OPD Site District
application may be submitted and the formal approval process may proceed as
follows:
(1) The applicant shall submit to the Clerk a properly completed
and signed application on a form provided by the City and pay to the
City a fee as set by Council. The applicant shall also submit to the
Clerk with the application graphic depictions of the following:
a. A land use plan, sized and drawn to a sufficient scale
to show necessary details, including:
i. Dimensions and acreage of overall project
site.
ii. Dimension and acreage of each underlying
zoning district.
iii. Dimension and acreage of each parcel to be
dedicated to the City.
iv. Dimensions and acreage of each unit or state
of development.
v. Location of properties proposed.
vi. Location and use of all parcels adjacent to the
proposed development.
b. Site plans(s), sized and drawn to a sufficient scale to
show necessary details, (site plans not required for OPD
Concept District Applications) including:
i. Date, compass point, legend of symbols,
graphical scale.
ii. Property boundary lines to the nearest one-
hundredth of a foot.
iii. Existing and proposed topography at contour
intervals of no more than one foot, extended beyond
the boundaries of the site to adjacent properties as
necessary to address site drainage.
iv. Location of any established floodways,
floodway fringe, and floodplain overlay lines, if
applicable.
v. Location of existing trees, identifying those
that will be preserved.
vi. Location of existing and proposed utilities,
public and private.
vii. Location of existing and proposed easements,
public and private.
viii. Location, footprint, size and use of all
buildings and structures, existing and proposed.
CODE OF ORDINANCES, TIFFIN, IOWA
- 1769 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.