other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Document 280
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 617 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP
(2) In the event that the dedicated open space will contain
amenities, such as trails, the City may require such amenities be
installed by the developer with the costs shared jointly by the
developer and City based upon an estimate of proportional use by the
residents of the proposed development. The timing of such
improvements shall be determined and set forth in a development
agreement between the developer and the City.
K. Private Shared Open Space.
(1) In the event open space land is to be retained under private
ownership, the developer must submit a legally binding instrument
setting forth the procedures to be followed for maintaining the areas
and for financing maintenance costs. Such costs will be shared by all
owners of property located within the planned development through
the use of an owners’ association or other entity satisfactory to the
City. Any cost incurred by the City due to the failure of this
designated entity to meet its obligations under the provisions of this
Subsection 6(K)(1) shall be assessed against, and will become a lien
on all individual properties located within the planned development in
favor of the City.
(2) The intended purpose of any private shared open space
proposed for a planned development must be set forth in the plan.
Such land must be suitably improved for its intended purpose. The
timing of such improvements shall be set forth in a legally binding
instrument as described in Subsection 6 (K)(1).
L. Commencement of Construction. Construction must commence
within two years from the date the City grants its approval of the OPD Site
District (or any extension granted by the City) or the approval shall become
null and void without any action by the Council. In such a case the applicant
may resubmit the voided OPD but it will be subject to the entire processing
procedure outlined in Subsection 7 unless waived by Council.
M. Building Permits. No Building Permit shall be issued for the
construction, reconstruction, or structural alteration of a building nor shall any
use be established or converted nor shall a certificate of occupancy be granted
without conformity with the provisions of the approved OPD district plans
and agreements.
N. Other Conditions. Other conditions may be imposed if found
necessary to protect and promote the best interests of the surrounding property
or the neighborhood. Such conditions include, but are not limited to, the
following:
(1) Improvement of traffic circulation for vehicles and
pedestrians in the proposed development and adjoining properties or
streets.
(2) Specific landscaping or screening requirements to maintain
privacy or reduce impact on adjoining properties.
(3) Joint use of private open space or amenities by adjoining
property owners.
CODE OF ORDINANCES, TIFFIN, IOWA
- 1765 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.