other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Document 280
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 590 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP
reconstructed, must fully comply with applicable industrial
performance standards existing at the time of use establishment or at
the time of most recent structural alteration.
(2) Any use established, any building or structure constructed, or
tract of land developed for any permitted, special, or accessory use in
this zoning district must comply with all of the performance standards
herein set forth.
C. Procedure. Uses, buildings, or structures required to comply with this
provision must make a showing of probable compliance with these
performance standards before undertaking the alteration. The showing must
be in the form of a letter submitted with the zoning application (or building
application if proper industrial zoning already exists), prepared by the City
Engineer, certifying that the use, building, or structure complies with all
industrial performance standard requirements. The letter must be based on
the engineer’s personal scrutiny of the site and proposed use or alteration, and
must have analytical foundation in accepted engineering principles. In
addition, the Planning and Zoning Commission or the Council may require
the applicant to submit:
(1) A plot plan showing the location of all present and proposed
structures, drives, parking lots, waste disposal areas, bulk storage
areas, streets, streams, or other significant features on or within 200
feet of the proposed site.
(2) A description of the activity to be conducted regarding waste
products, external effects, or other conditions that are regulated
herein; provided however, that the applicant may not be required to
reveal any trade secrets or sufficient detail with regard to a process
that would cause any secret process or manufacturing procedure for a
closely guarded proprietary compound or product to become public
knowledge and be available to competitors.
(3) The type and location of abatement devices to control, or
recording instruments to measure conformance with required
standards, not including devices and instruments that are inherent in
the manufacturing process.
(4) Such other data and certification that may reasonably be
required by the Planning and Zoning Commission or the Council to
reach a determination.
(5) All information and evidence submitted in applications to
indicate conformity to performance standards must constitute a
certification and an agreement on the part of the applicant that the
proposed use can and will conform to such standards at all times.
D. Administrative Options. The Planning and Zoning Commission may
approve the establishment of the use, building, or structure, if all pertinent
provisions of this Code, and other applicable City ordinances are complied
with. If the Planning and Zoning Commission determines that the proposed
use, building or structure does not comply with performance standards, they
may inform the applicant that either more information is necessary or that an
CODE OF ORDINANCES, TIFFIN, IOWA
- 1730 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.