Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP
may be asked to analyze the prospects of compliance. Costs of such analysis
must be paid by the applicant.
F. Use of Independent Engineering Analysis. Upon submission of an
independent engineering analysis authorized by the City, the Planning and
Zoning Commission must authorize establishment of the use, building, or
structure if the independent analysis confirms probable compliance with this
provision and if all other applicable provisions of this and other City
ordinances are satisfied. If, however, the independent engineering analysis
indicates that the proposed use, building, or structure is not likely to comply
with this provision, then the application must be denied until such time that
the proposal is able to comply fully.
G. Appeal of Administrative Determination. Action, or a lack of action
by the Planning and Zoning Commission, with reference to these performance
standards may be appealed to the Board of Adjustment. Or, in instances when
no action has been taken by the Planning and Zoning Commission within 120
days after formal filing of the application.
H. Continued Enforcement.
(1) The Planning and Zoning Commission shall investigate any
purported violation of performance standards. Uses, buildings, or
structures lawfully established prior to the effective date of this
Zoning Code and subject to performance standards existing at that
time, may be found to be in violation with those previously applicable
standards. Alleged violations may be brought to the Council’s
attention by employees of that office, or by County or State law
enforcement, health, or environmental employees or officials or
citizens. If a violation is alleged, the Planning and Zoning
Commission shall inform the suspected perpetrator and shall initiate
an independent engineering analysis consistent with the analysis
procedure outlined herein. Administrative determinations made in
conjunction with the analysis may be appealed in the same manner
heretofore outlined.
(2) Revocation of Permits. If an alleged violation is determined
to be valid by the independent engineering analysis, any permits
previously issued in conjunction with the established use, building, or
structure are void and the operator must cease operation until the
violation is remedied. Failure to cease operation within two days of
notice to do so by the City constitutes a violation of this Zoning Code
and the penalty provision cited in Section 165.32 may be imposed.
I. Technical Provisions.
(1) Noise
a. To measure the intensity and frequency of sound, the
sound level meter, the octave band analyzer, and the impact
noise analyzer may be employed. The flat network and the
fast meter response of the sound level meter may be used.
Sounds of short duration that cannot be measured accurately
with the sound level meter, may be measured with the
impact noise analyzer. Octave band analyzers calibrated in
CODE OF ORDINANCES, TIFFIN, IOWA
- 1713 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.