other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Document 280
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 522 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP
performance standards existing at the time of use establishment or at
the time of most recent structural alteration.
(2) Any use established, building or structure constructed, or
tract of land developed for any permitted, special, or accessory use in
this zoning district shall comply with all of the performance standards
herein set forth.
C. Procedure. Uses, buildings, or structures required to comply with this
provision shall make a showing of probable compliance with these
performance standards prior to undertaking any alteration. The showing shall
be in the form of a letter submitted with the zoning application (or building
application if proper commercial zoning already exists) prepared by a
professional engineer, licensed in the State, certifying that the use, building,
or structure complies with all commercial performance standard requirements.
The letter shall be based on the engineer's personal scrutiny of the site and
proposed use or alteration and shall have an analytical foundation in accepted
engineering principles. In addition, the Planning and Zoning Commission
may require the applicant to submit the following:
(1) A plot plan showing the location of all present and proposed
structures, drives, parking lots, waste disposal areas, bulk storage
areas, streets, streams, or other significant features on or within 200
feet of the proposed site.
(2) A description of the activity to be conducted regarding waste
products, external effects, or other conditions that are regulated
herein; provided, however, that the applicant shall not be required to
reveal any trade secrets or sufficient detail with regard to a process
that would cause any secret process or manufacturing procedure for a
closely guarded proprietary compound or product to become public
knowledge and be available to competitors.
(3) The type and location of abatement devices to control, or
recording instruments to measure, conformance with required
standards, not including devices and instruments that are inherent in
the manufacturing process.
(4) Such other data and certification as may reasonably be
required by the Planning and Zoning Commission to reach a
determination.
(5) All information and evidence submitted in applications to
indicate conformity to performance standards shall constitute a
certification and an agreement on the part of the applicant that the
proposed use can and will conform to such standards at all times.
D. Administrative Options. The Planning and Zoning Commission may
approve and authorize the establishment of the use, building, or structure if all
pertinent provisions of this Zoning Code and other applicable ordinances are
complied with. If, however, the Planning and Zoning Commission determines
that the proposed use, building, or structure may not comply with
performance standards, they shall inform the applicant that either more
information is necessary or that an independent engineering analysis of the
proposed use, building, or structure is required prior to final Council approval.
CODE OF ORDINANCES, TIFFIN, IOWA
- 1638 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.