other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Document 280
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 519 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP
Commercial Setbacks
C-1B Neighborhood Business District
Interior Maximum
Minimum Front Corner Rear Floor
Major Minimum Side Height of
Lot Yard Yard Yard Area
Category Lot Area Yard Principal
Width Setback Setback Setback Ratio
Setback Use
Recreation and
Social N/A N/A 30′ 15′ 30′ 30′ 0.4 35′
Facilities Uses
Miscellaneous
N/A N/A 30′ 15′ 30′ 40′ 0.4 35′
Uses
7. Sign Regulations. Signs are permitted according to the provisions of Chapter
167.
8. Parking and Loading Regulations.
A. Parking areas shall consist of areas that are aesthetically pleasing,
landscaped to screen public views, and located so as not to be the dominant
feature along any street or within any development. The use of alternate
materials to designate pedestrian areas within or adjacent to parking lots is
encouraged, and pedestrian areas shall be separated from vehicular traffic
with landscaping, decorative posts, special paving, or other measures to
clearly define the pedestrian spaces. Property owners are encouraged to
establish shared parking zones among uses on one or more lots.
B. Parking and loading shall be provided according to the provisions of
Section 165.06.
9. Lighting Regulations. Exterior lighting is provided according to the
provisions of Section 165.07.
10. Site Plan Regulations.
A. To insure compliance with the provisions of this section, any
construction, change in use, or increase in intensity of an existing use, but
excluding normal maintenance activity, in the C-1B District, a site plan shall
be required. Prior to applying for a Building Permit, all commercial zones
shall submit a site plan for review by City designee and City Engineer. It is
the intent of this section that site plans for C-1B District are prepared by a
designer having professional competence in urban planning. The Council
shall require the applicant to engage a qualified designer. The site plan must
follow appropriate design standards and must be approved prior to Building
Permit approval.
B. Site plan must follow all requirements listed below:
(1) Date, compass point, legend of symbols, and minimum scale
of 1” = 40′.
(2) Legal description including total area of property.
(3) Address, if assigned.
(4) Landowners’ and applicant’s name, address, and contact
information.
(5) Vicinity map that identifies the location of the proper in
relationship to the neighborhood or the rest of the City.
CODE OF ORDINANCES, TIFFIN, IOWA
- 1635 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.