other · C

Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT

Open the PDF Searchable PDF tesseract layer

Page 512 of 718

Text from the PDF text layer; check the PDF for anything that matters.
CHAPTER 166 ESTABLISHMENT OF ZONING DISTRICTS AND THE OFFICIAL ZONING MAP procedure outlined in Paragraph F. Administrative determinations made in conjunction with the analysis may be appealed according to Paragraph H. J. Revocation of Permits. If an alleged violation is determined to be valid by the independent engineering analysis, any permits previously issued in conjunction with the established use, building, or structure are void and the operator must cease operation until the violation is remedied. Failure to cease operation within two days of notice to do so by the City constitutes an violation of this Zoning Code and the penalty provision cited in Section 165.32 may be imposed. K. Technical Provisions. (1) Noise. To measure the intensity and frequency of sound, the sound level meter, the octave band analyzer, and the impact noise analyzer may be employed. The flat network and the fast meter response of the sound level meter may be used. Sounds of short duration that cannot be measured accurately with the sound level meter, may be measured with the impact noise analyzer. Octave band analyzers calibrated in the preferred frequencies (American Standards Association S1 6-1960, Preferred Frequencies for Acoustical Measurements) must be used with the following tables. The suspected perpetrator will be required to hire, at the approval of the City, a consultant to measure, record, and report to the Council results about compliance with this Code. All costs shall be the responsibility of the property owner. (2) Maximum Permitted Sound Level. Cycles per Second Decibels 0-74 58 75-149 54 150-299 50 300-599 46 600-1199 40 1200-2399 33 2400-4799 26 4800-over 20 (3) Exceptions. The following uses and activities shall be exempt from the noise level regulations in the C-1A District: a. Noises not directly under control of the property user. b. Noises emanating from construction and maintenance activities between 7:00 a.m. and 10:00 p.m. Such activities are those that are non-routine operations accessory to the primary activities, and that are temporary in nature, or conducted infrequently. L. Vibration. (1) Any commercial operation or activity that must cause at any time and at any point along the nearest adjacent lot line, earth borne vibrations in excess of the limits set forth in Section 166.15(15)(L)(4) and Section 166.15(15)(L)(5) is prohibited. CODE OF ORDINANCES, TIFFIN, IOWA - 1624 -

Sources

  • revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...

This document's details as JSON

Data last updated October 21, 2026. Built from the archive's documents; see how the data is built.