other

Tiffin Comprehensive Plan – Updated 2018

88 pages

Open the PDF

Page 34 of 88

Text from the PDF text layer; check the PDF for anything that matters.
Infrastructure Infrastructure Systems Water System Based on population projections during the planning period, with an average per capita water usage of 100 GPD, the projected average day water demand would be approximately 600,000 GPD. Peak demand may reach 800,000 GPD. Currently the city has 500,000 in elevated storage capacity with the new water tower that was constructed in 2013. The City may need a capacity of approximately 1,216,800 GPD by the year 2030 to ensure adequate fire protection and water supply for the community. Future Water System Recommendations  Construction of new water tower within 15 years.  Plan on two new wells within 5 years.  Establish a Capital Improvements Plan for a detailed schedule of water system repairs and maintenance. New construction dots the landscape of Tiffin – April 2014 City of Tiffin 2018 City of Tiffin, Comprehensive Comprehensive Plan Plan 34

Sources

  • citysite: Tiffin Comprehensive Plan – Updated 2018 (Adopted-Tiffin-Comprehensive-Plan.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.