{"build_id":9,"built_at":"2026-10-15T01:48:22.159262+00:00","finance_build_id":11,"disclaimer":"Compiled from published City of Tiffin documents (agendas, minutes, resolutions, memos, pay applications and payables lists); not official accounting or an official project record. Every event links to the page it was read from. Amounts marked \"as printed\" are the city's own figures; totals from the payables lists are a lower bound where a list did not reconcile or where the lists in the archive do not reach back (they begin in 2021).","total":61,"count":61,"top_level":45,"change_order_summary":{"contracts":22,"projects":21,"original":51621945.83,"net_change":206425.44,"net_change_pct":0.004,"gross_increase":702089.01,"gross_decrease":-1055655.91,"not_itemized":627700.86,"current":51829371.47,"approved_not_booked":66708.62,"change_orders":77,"large_credits":[{"slug":"recreation-center","name":"Tiffin Community Recreation Center","contractor":"MIRON CONSTRUCTION CO","date":"2025-09-25","amount":-1042001.88,"description":"Reduction after bid buyout (cf. the 2025-08-19 work session on the total bid and not-to-exceed construction cost); revised contract $11,393,140.12"}],"excluding_large_credits":{"contracts":21,"projects":20,"original":39186803.83,"net_change":1248427.32,"net_change_pct":0.0319,"gross_increase":702089.01,"gross_decrease":-13654.03,"not_itemized":627700.86,"current":40436231.35},"top_by_growth":[{"slug":"permeable-pavers","name":"Permeable Paver Parking Project","co_pct":0.3139,"co_net":92506.69,"original":294724.66},{"slug":"well-5","name":"Well #5 (test well, pump, controls and water main)","co_pct":0.1342,"co_net":39720.0,"original":296015.0},{"slug":"original-town-phase-1","name":"Original Town Urbanization – Phase One","co_pct":0.129,"co_net":137006.49,"original":1062008.0},{"slug":"original-town-phase-2","name":"Original Town Urbanization – Phase Two","co_pct":0.1232,"co_net":226742.97,"original":1840593.96},{"slug":"forevergreen-earth-stockpile","name":"Forevergreen Road Earth Stockpile / Grading","co_pct":0.1074,"co_net":14825.25,"original":138050.0},{"slug":"original-town-phase-3","name":"Original Town Urbanization – Phase Three","co_pct":0.0993,"co_net":212068.23,"original":2134856.9},{"slug":"roundabout-gateway-signage","name":"Roundabout Gateway Signage","co_pct":0.078,"co_net":920.0,"original":11800.0},{"slug":"roundabout-park-road-hwy6","name":"Tiffin Roundabout (Park Road / Highway 6, STP-A-006-7(90)--22-52)","co_pct":0.0705,"co_net":214360.29,"original":3041340.31}],"missing":[{"slug":"north-park-road","name":"North Park Road Improvements (STP-U-7662(615)--70-52)","contractor":"BOOMERANG CORP","numbers":[1,2,3,4,5,6,7,8,10,18]},{"slug":"original-town-phase-1","name":"Original Town Urbanization – Phase One","contractor":"LL PELLING","numbers":[3,4,5]},{"slug":"original-town-phase-2","name":"Original Town Urbanization – Phase Two","contractor":"RATHJE CONSTRUCTION","numbers":[5]},{"slug":"original-town-phase-3","name":"Original Town Urbanization – Phase Three","contractor":"RATHJE CONSTRUCTION","numbers":[10]},{"slug":"roundabout-park-road-hwy6","name":"Tiffin Roundabout (Park Road / Highway 6, STP-A-006-7(90)--22-52)","contractor":"RATHJE CONSTRUCTION","numbers":[4,8]},{"slug":"roberts-ferry-road-reconstruction","name":"Roberts Ferry Road Reconstruction","contractor":"VIETH CONSTRUCTION CORP","numbers":[2,5,6]},{"slug":"wwtp-phase-2","name":"Wastewater Treatment Plant Expansion – Phase Two","contractor":"PORTZEN CONSTRUCTION","numbers":[8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39,40,41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,56,57,58,59,60,61,62,63,64,65,66,67,68,69,70,71,72,73,74,75,76,77,78,79,80,81,82,83,84,85,86,87,88,89,90,91,92,93,94,95]}],"note":"Only contracts whose original amount is in the archive are counted. Increases and decreases are the change orders read; 'not itemized' is the rise in the printed contract sums the change orders in the archive do not account for (change orders missing from the archive: unknown, not zero). Net change is the printed contract sum to date minus the original."},"kinds":[{"code":"capital_project","label":"Capital project","count":26},{"code":"development_or_agreement","label":"Development or agreement","count":9},{"code":"facility","label":"Facility","count":1},{"code":"infrastructure","label":"Infrastructure","count":2},{"code":"plan_or_study","label":"Plan or study","count":1},{"code":"policy","label":"Policy","count":2},{"code":"program_or_service","label":"Program or service","count":4}],"statuses":[{"code":"complete","label":"Complete","count":17},{"code":"design","label":"Design","count":3},{"code":"ongoing","label":"Ongoing","count":15},{"code":"under_construction","label":"Under construction","count":6},{"code":"unknown","label":"Unknown","count":4}],"results":[{"slug":"park-place","name":"Park Place City Center","kind":"development_or_agreement","kind_label":"Development or agreement","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2016-08-10","last_date":"2026-10-14","last_activity":"2026-10-14","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"A mixed-use development by Andersen Development Inc. in the 2017 Park Place Commercial Urban Renewal Area: rezonings, a planned development overlay, preliminary and final plats in parts and phases, developer's and escrow agreements, and TIF development agreements for buildings (Park 8, LLC 2024; Park 3, LLC 2025).","events":191,"motions":184,"documents":189,"changes":26,"dissents":1,"source":"yaml","first_seen":"2016-08-10","last_seen":"2026-10-14","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":191,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"water-treatment-plant-upgrade","name":"Water Treatment Plant Upgrades","kind":"capital_project","kind_label":"Capital project","category":"water","status":"under_construction","status_label":"Under construction","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2022-11-15","last_date":"2026-10-06","last_activity":"2026-10-06","cost_figure":12202701.91,"cost_basis":"contract sum to date (pay applications)","percent_complete":0.8367,"summary":"Upgrade of the city's water treatment plant to reverse osmosis treatment. MSA Professional Services evaluated the water system (2022) and designed the plant (2023-24); the generator/ATS and electrical equipment were pre-purchased in 2024; Tricon Construction Group was awarded the construction contract in April 2025. Financed by an Iowa State Revolving Fund loan through water revenue bonds.","events":74,"motions":36,"documents":102,"changes":5,"dissents":1,"source":"yaml","first_seen":"2022-11-15","last_seen":"2026-10-06","funds":["608"],"contractors":["TRICON CONSTRUCTION GROUP"],"original":12182553.0,"change_orders_total":20148.91,"contract_to_date":12202701.91,"paid_to_date":9699565.5,"pay_applications":13,"change_orders":3,"links":74,"finance_status":"active","breakdown":{"contracts":1,"original":12182553.0,"net_change":20148.91,"net_change_pct":0.0017,"current":12202701.91,"gross_increase":57799.31,"gross_decrease":0.0,"not_itemized":0.0,"approved_not_booked":37650.4,"paid_to_date":9699565.5,"change_orders":3,"large_credits":[],"missing":[]},"co_net":20148.91,"co_pct":0.0017,"original_total":12182553.0,"current_total":12202701.91,"paid_total":9699565.5},{"slug":"fire-department","name":"Tiffin Fire Department","kind":"program_or_service","kind_label":"Program or service","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":["fire-pumper-truck","fire-station","fire-chief-position"],"first_date":"2007-05-09","last_date":"2026-10-06","last_activity":"2026-10-06","cost_figure":918653.67,"cost_basis":"sum of its phases","percent_complete":null,"summary":"Fire protection, provided under 28E agreements with the volunteer Tiffin Fire Association until the city created its own fire department by ordinance in 2021. Includes stipend and SAFER grant programs, mutual-aid and shared-equipment agreements, and the phases below (pumper truck, new fire station, fire chief).","events":96,"motions":75,"documents":154,"changes":8,"dissents":3,"source":"yaml","first_seen":"2007-05-09","last_seen":"2026-10-06","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":96,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"recreation-center","name":"Tiffin Community Recreation Center","kind":"capital_project","kind_label":"Capital project","category":"building","status":"under_construction","status_label":"Under construction","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2016-04-12","last_date":"2026-10-06","last_activity":"2026-10-06","cost_figure":11393140.12,"cost_basis":"contract sum to date (pay applications)","percent_complete":0.8273,"summary":"A community recreation center at 105 S. Park Road. Shive-Hattery prepared a planning study in 2018; Atura Architecture designed the building (2023-25); Miron Construction was selected as construction manager at risk (Resolution 2024-071, 5–0) and its construction services agreement approved 3–2 in April 2025, with a Guaranteed Maximum Price of $12,435,142 (May 2025). A change order of September 25, 2025 reduced the contract by $1,042,001.88 to $11,393,140.12 after bid buyout. The 2023 local option sales tax is the funding source named in the documents.","events":76,"motions":26,"documents":97,"changes":3,"dissents":1,"source":"yaml","first_seen":"2016-04-12","last_seen":"2026-10-06","funds":["340"],"contractors":["MIRON CONSTRUCTION CO"],"original":12435142.0,"change_orders_total":-1042001.88,"contract_to_date":11393140.12,"paid_to_date":8954710.11,"pay_applications":16,"change_orders":1,"links":76,"finance_status":"active","breakdown":{"contracts":1,"original":12435142.0,"net_change":-1042001.88,"net_change_pct":-0.0838,"current":11393140.12,"gross_increase":0.0,"gross_decrease":-1042001.88,"not_itemized":0.0,"approved_not_booked":0.0,"paid_to_date":8954710.11,"change_orders":1,"large_credits":[{"contractor":"MIRON CONSTRUCTION CO","date":"2025-09-25","amount":-1042001.88,"description":"Reduction after bid buyout (cf. the 2025-08-19 work session on the total bid and not-to-exceed construction cost); revised contract $11,393,140.12"}],"missing":[]},"co_net":-1042001.88,"co_pct":-0.0838,"original_total":12435142.0,"current_total":11393140.12,"paid_total":8954710.11},{"slug":"roberts-ferry-village-drive-signal","name":"Roberts Ferry Road & Village Drive Traffic Signal","kind":"capital_project","kind_label":"Capital project","category":"street","status":"under_construction","status_label":"Under construction","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2025-08-19","last_date":"2026-10-06","last_activity":"2026-10-06","cost_figure":367853.75,"cost_basis":"contract sum to date (pay applications)","percent_complete":0.5702,"summary":"A traffic signal at Roberts Ferry Road and Village Drive. MSA designed it (2025); Neumiller Electric was the low of four bidders at $367,853.75 (May 2026).","events":7,"motions":5,"documents":12,"changes":0,"dissents":0,"source":"yaml","first_seen":"2025-08-19","last_seen":"2026-10-06","funds":["347"],"contractors":["NEUMILLER ELECTRIC"],"original":367853.75,"change_orders_total":0.0,"contract_to_date":367853.75,"paid_to_date":203474.27,"pay_applications":1,"change_orders":0,"links":7,"finance_status":"active","breakdown":{"contracts":1,"original":367853.75,"net_change":0.0,"net_change_pct":0.0,"current":367853.75,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":0.0,"approved_not_booked":0.0,"paid_to_date":203474.27,"change_orders":0,"large_credits":[],"missing":[]},"co_net":0.0,"co_pct":0.0,"original_total":367853.75,"current_total":367853.75,"paid_total":203474.27},{"slug":"original-town-phase-3","name":"Original Town Urbanization – Phase Three","kind":"capital_project","kind_label":"Capital project","category":"street","status":"under_construction","status_label":"Under construction","status_source":"derived","parent":{"slug":"original-town-urbanization","name":"Original Town Urbanization"},"phase":"Phase 3","children":[],"first_date":"2023-07-18","last_date":"2026-10-06","last_activity":"2026-10-06","cost_figure":2346925.13,"cost_basis":"contract sum to date (pay applications)","percent_complete":1.0316,"summary":null,"events":58,"motions":28,"documents":80,"changes":10,"dissents":1,"source":"yaml","first_seen":"2023-07-18","last_seen":"2026-10-06","funds":["339"],"contractors":["RATHJE CONSTRUCTION"],"original":2134856.9,"change_orders_total":212068.23,"contract_to_date":2346925.13,"paid_to_date":2299941.5,"pay_applications":13,"change_orders":10,"links":58,"finance_status":"active","breakdown":{"contracts":1,"original":2134856.9,"net_change":212068.23,"net_change_pct":0.0993,"current":2346925.13,"gross_increase":210568.23,"gross_decrease":0.0,"not_itemized":1500.0,"approved_not_booked":0.0,"paid_to_date":2299941.5,"change_orders":10,"large_credits":[],"missing":[{"contractor":"RATHJE CONSTRUCTION","numbers":[10]}]},"co_net":212068.23,"co_pct":0.0993,"original_total":2134856.9,"current_total":2346925.13,"paid_total":2299941.5},{"slug":"original-town-urbanization","name":"Original Town Urbanization","kind":"capital_project","kind_label":"Capital project","category":null,"status":"under_construction","status_label":"Under construction","status_source":"derived","parent":null,"phase":null,"children":["original-town-phase-1","original-town-phase-2","original-town-phase-3"],"first_date":"2017-07-05","last_date":"2026-10-06","last_activity":"2026-10-06","cost_figure":5613276.55,"cost_basis":"sum of its phases","percent_complete":null,"summary":"Reconstruction of the streets of the original town (curb and gutter, storm sewer, sidewalks), planned since 2012 with Hart-Frederick as engineer and built in three phases: LL Pelling (phase one, awarded 2018), Rathje Construction (phase two, 2020, and phase three, 2023). Property owners share the cost through special assessments.","events":9,"motions":9,"documents":15,"changes":3,"dissents":0,"source":"yaml","first_seen":"2017-07-05","last_seen":"2026-10-06","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":9,"breakdown":{"contracts":4,"original":5037458.86,"net_change":575817.69,"net_change_pct":0.1143,"current":5613276.55,"gross_increase":341635.95,"gross_decrease":-10000.0,"not_itemized":244180.84,"approved_not_booked":0.0,"paid_to_date":5676713.21,"change_orders":32,"large_credits":[],"missing":[{"contractor":"LL PELLING","numbers":[3,4,5]},{"contractor":"RATHJE CONSTRUCTION","numbers":[5]},{"contractor":"RATHJE CONSTRUCTION","numbers":[10]}]},"co_net":575817.69,"co_pct":0.1143,"original_total":5037458.86,"current_total":5613276.55,"paid_total":5676713.21},{"slug":"north-park-road","name":"North Park Road Improvements (STP-U-7662(615)--70-52)","kind":"capital_project","kind_label":"Capital project","category":"street","status":"under_construction","status_label":"Under construction","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2019-02-19","last_date":"2026-10-06","last_activity":"2026-10-06","cost_figure":5586976.68,"cost_basis":"contract sum to date (pay applications)","percent_complete":0.9193,"summary":"Reconstruction and widening of North Park Road past the Clear Creek Amana schools with a trail and pedestrian underpass, a federal-aid (STBG) project let by the Iowa DOT. MSA designed it (2022-24); the city's TSIP, ICAAP and TAP grant applications (2023) were not funded; Boomerang Corp. was awarded the contract in January 2025 at $5,458,891.91.","events":93,"motions":41,"documents":135,"changes":9,"dissents":0,"source":"yaml","first_seen":"2019-02-19","last_seen":"2026-10-06","funds":["307"],"contractors":["BOOMERANG CORP"],"original":5458891.91,"change_orders_total":104406.49,"contract_to_date":5586976.68,"paid_to_date":5108186.91,"pay_applications":18,"change_orders":9,"links":93,"finance_status":"active","breakdown":{"contracts":1,"original":5458891.91,"net_change":128084.77,"net_change_pct":0.0235,"current":5586976.68,"gross_increase":105060.52,"gross_decrease":-654.03,"not_itemized":23024.25,"approved_not_booked":-654.03,"paid_to_date":5108186.91,"change_orders":9,"large_credits":[],"missing":[{"contractor":"BOOMERANG CORP","numbers":[1,2,3,4,5,6,7,8,10,18]}]},"co_net":128084.77,"co_pct":0.0235,"original_total":5458891.91,"current_total":5586976.68,"paid_total":5108186.91},{"slug":"fire-chief-position","name":"Fire Chief position and hiring (2025–2026)","kind":"program_or_service","kind_label":"Program or service","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":{"slug":"fire-department","name":"Tiffin Fire Department"},"phase":"Fire chief","children":[],"first_date":"2025-10-21","last_date":"2026-10-06","last_activity":"2026-10-06","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"After the fire chief's resignation in September 2025, the council approved a full-time fire chief job description (November 2025), hired a chief on a 3–2 vote in February 2026, designated the assistant chiefs as acting chief, and appointed an interim fire chief in May 2026. Review of the job description and hiring process resumed in October 2026.","events":17,"motions":7,"documents":11,"changes":1,"dissents":1,"source":"yaml","first_seen":"2025-10-21","last_seen":"2026-10-06","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":17,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"well-6","name":"Well #6","kind":"capital_project","kind_label":"Capital project","category":null,"status":"design","status_label":"Design","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2026-07-21","last_date":"2026-09-15","last_activity":"2026-09-15","cost_figure":1238940.0,"cost_basis":"largest printed estimate figure","percent_complete":null,"summary":"Placing a test well near the water treatment plant into service as Well #6. MSA estimated the project at $1,238,940 (June 2026) and was engaged for design in September 2026.","events":3,"motions":1,"documents":3,"changes":0,"dissents":0,"source":"yaml","first_seen":"2026-07-21","last_seen":"2026-09-15","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":3,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"urban-renewal-tif","name":"Urban renewal areas and TIF","kind":"program_or_service","kind_label":"Program or service","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2010-08-11","last_date":"2026-09-15","last_activity":"2026-09-15","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"The Tiffin Urban Renewal Area and the 2017 Park Place Commercial Urban Renewal Area: plan amendments, additions, the annual TIF debt certification, urban renewal loans and bonds, and development agreements paid from tax increment.","events":178,"motions":165,"documents":206,"changes":62,"dissents":2,"source":"yaml","first_seen":"2010-08-11","last_seen":"2026-09-15","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":178,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"fire-station","name":"New fire station","kind":"facility","kind_label":"Facility","category":null,"status":"planning","status_label":"Planning","status_source":"derived","parent":{"slug":"fire-department","name":"Tiffin Fire Department"},"phase":"Fire station","children":[],"first_date":"2023-01-17","last_date":"2026-09-15","last_activity":"2026-09-15","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"A new fire station in the Capital Improvements Plan (moved to FY2026-27 in 2023). The council let the department fundraise through the Tiffin Emergency Responders' Association (2024), reviewed a conceptual design by OPN Architects (2025), and approved a request for qualifications for site evaluation, planning and design in September 2026.","events":8,"motions":5,"documents":14,"changes":1,"dissents":2,"source":"yaml","first_seen":"2023-01-17","last_seen":"2026-09-15","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":8,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"local-option-sales-tax-2023","name":"Local option sales tax (2023 special election)","kind":"policy","kind_label":"Policy","category":null,"status":"complete","status_label":"Complete","status_source":"manual","parent":null,"phase":null,"children":[],"first_date":"2022-12-06","last_date":"2026-09-15","last_activity":"2026-09-15","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"A 1% local option sales tax put to voters at a special election on September 12, 2023 (Resolution 2023-042; half for property-tax relief, half for infrastructure, parks and recreation, public safety and other lawful purposes). A 2024 resolution refers to its passage; collections began January 1, 2024.","events":6,"motions":4,"documents":7,"changes":0,"dissents":3,"source":"yaml","first_seen":"2022-12-06","last_seen":"2026-09-15","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":6,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"us-hwy-6-reconstruction","name":"US Highway 6 Reconstruction","kind":"capital_project","kind_label":"Capital project","category":"street","status":"design","status_label":"Design","status_source":"manual","parent":null,"phase":null,"children":[],"first_date":"2025-03-18","last_date":"2026-09-01","last_activity":"2026-09-01","cost_figure":755838.4,"cost_basis":"paid on the payables lists","percent_complete":null,"summary":"Reconstruction of US Highway 6 through Tiffin (pavement, sidewalk/trail, box culvert, with city water main, storm sewer and a signal), designed by MSA for the city with the Iowa DOT. The 2026 DOT preconstruction agreement puts the city's estimated share at $3,920,988.98; construction is staged for 2027-28.","events":18,"motions":2,"documents":23,"changes":0,"dissents":0,"source":"yaml","first_seen":"2025-03-18","last_seen":"2026-09-01","funds":["309"],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":18,"finance_status":"active","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"tiffin-trail-system","name":"Trails and sidewalks","kind":"infrastructure","kind_label":"Infrastructure","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":["trails-phase-4","trail-phase-6","trail-phase-7","sidewalk-to-soccer-fields"],"first_date":"2011-02-09","last_date":"2026-08-18","last_activity":"2026-08-18","cost_figure":423407.14,"cost_basis":"sum of its phases","percent_complete":null,"summary":"The city's trail network along Clear Creek and its sidewalk connections, built in numbered phases (four, six and seven below), with Iowa DOT, Johnson County Conservation and MPO funding, plus safe-routes, crossing-beacon and sidewalk programs.","events":18,"motions":11,"documents":23,"changes":0,"dissents":0,"source":"yaml","first_seen":"2011-02-09","last_seen":"2026-08-18","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":18,"breakdown":{"contracts":3,"original":424359.88,"net_change":-952.74,"net_change_pct":-0.0022,"current":423407.14,"gross_increase":2138.0,"gross_decrease":0.0,"not_itemized":-3090.74,"approved_not_booked":0.0,"paid_to_date":434282.88,"change_orders":2,"large_credits":[],"missing":[]},"co_net":-952.74,"co_pct":-0.0022,"original_total":424359.88,"current_total":423407.14,"paid_total":434282.88},{"slug":"lotus-hill","name":"Lotus Hill (Andersen Addition part three)","kind":"development_or_agreement","kind_label":"Development or agreement","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":{"slug":"andersen-addition","name":"Andersen Addition"},"phase":"Lotus Hill","children":[],"first_date":"2023-01-17","last_date":"2026-08-18","last_activity":"2026-08-18","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"The Lotus Hill area of Andersen Addition part three: a planned development overlay concept (2023), its 2026 revision and the rezonings of Lotus Hill North and South (Ordinances 2026-525, 2026-526, 2026-529).","events":29,"motions":24,"documents":56,"changes":2,"dissents":0,"source":"yaml","first_seen":"2023-01-17","last_seen":"2026-08-18","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":29,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"andersen-addition","name":"Andersen Addition","kind":"development_or_agreement","kind_label":"Development or agreement","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":["lotus-hill"],"first_date":"2018-04-17","last_date":"2026-08-18","last_activity":"2026-08-18","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"A subdivision in parts one to three with rezonings, plats and subdivider's agreements (developer Hightower Development, Inc. in 2019-20); part three includes the Lotus Hill area below.","events":58,"motions":46,"documents":88,"changes":11,"dissents":0,"source":"yaml","first_seen":"2018-04-17","last_seen":"2026-08-18","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":58,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"forevergreen-earth-stockpile","name":"Forevergreen Road Earth Stockpile / Grading","kind":"capital_project","kind_label":"Capital project","category":"street","status":"under_construction","status_label":"Under construction","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2025-06-03","last_date":"2026-08-05","last_activity":"2026-07-07","cost_figure":152875.25,"cost_basis":"contract sum to date (pay applications)","percent_complete":0.992,"summary":null,"events":16,"motions":5,"documents":20,"changes":2,"dissents":0,"source":"finance","first_seen":"2025-06-03","last_seen":"2026-08-05","funds":["335"],"contractors":["CORNERSTONE EXCAVATING"],"original":138050.0,"change_orders_total":14825.25,"contract_to_date":152875.25,"paid_to_date":147103.17,"pay_applications":4,"change_orders":2,"links":16,"finance_status":"active","breakdown":{"contracts":1,"original":138050.0,"net_change":14825.25,"net_change_pct":0.1074,"current":152875.25,"gross_increase":44537.5,"gross_decrease":0.0,"not_itemized":0.0,"approved_not_booked":29712.25,"paid_to_date":147103.17,"change_orders":2,"large_credits":[],"missing":[]},"co_net":14825.25,"co_pct":0.1074,"original_total":138050.0,"current_total":152875.25,"paid_total":147103.17},{"slug":"broadband-fiber","name":"Broadband and cable (South Slope, Mediacom, Kinetic)","kind":"development_or_agreement","kind_label":"Development or agreement","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2004-06-09","last_date":"2026-06-02","last_activity":"2026-06-02","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"Cable and internet service providers' franchises and agreements: South Slope's cable franchise (2004) and fiber build-out (2015), Mediacom's franchise, and in 2026 Kinetic's (Windstream's) citywide buried fiber installation in the rights-of-way, reviewed by the city engineer under permits.","events":5,"motions":3,"documents":6,"changes":0,"dissents":0,"source":"yaml","first_seen":"2004-06-09","last_seen":"2026-06-02","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":5,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"tiffin-heights","name":"Tiffin Heights","kind":"development_or_agreement","kind_label":"Development or agreement","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":["tiffin-heights-west-watermain"],"first_date":"2013-07-10","last_date":"2026-05-19","last_activity":"2026-05-19","cost_figure":884489.7,"cost_basis":"sum of its phases","percent_complete":null,"summary":"A residential subdivision developed in parts (Tiffin Heights, Tiffin Heights East and West) with rezonings, plats and escrow agreements; Tiffin Heights West (GHS Development, 2023-26) included off-site water main improvements with city participation.","events":75,"motions":70,"documents":79,"changes":8,"dissents":0,"source":"yaml","first_seen":"2013-07-10","last_seen":"2026-05-19","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":75,"breakdown":{"contracts":1,"original":870652.6,"net_change":13837.1,"net_change_pct":0.0159,"current":884489.7,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":13837.7,"approved_not_booked":0.0,"paid_to_date":881593.7,"change_orders":0,"large_credits":[],"missing":[]},"co_net":13837.1,"co_pct":0.0159,"original_total":870652.6,"current_total":884489.7,"paid_total":881593.7},{"slug":"parks-and-recreation-facilities","name":"City parks and recreation facilities","kind":"facility","kind_label":"Facility","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":["parks-recreation-improvements-phase-1","soccer-field-parking-lot","sand-volleyball-courts"],"first_date":"2010-08-11","last_date":"2026-05-19","last_activity":"2026-05-19","cost_figure":302908.39,"cost_basis":"sum of its phases","percent_complete":null,"summary":"Improvements to Jim Bartels Tiffin City Park and the other city parks: the splash pad (2014), the Parks and Recreation Improvement Plan phase 1 (2016), soccer and ball fields, the dog park, park shelters, and the phases below.","events":55,"motions":50,"documents":66,"changes":2,"dissents":8,"source":"yaml","first_seen":"2010-08-11","last_seen":"2026-05-19","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":1,"links":55,"breakdown":{"contracts":1,"original":302908.39,"net_change":0.0,"net_change_pct":0.0,"current":302908.39,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":0.0,"approved_not_booked":0.0,"paid_to_date":302672.39,"change_orders":1,"large_credits":[],"missing":[]},"co_net":0.0,"co_pct":0.0,"original_total":302908.39,"current_total":302908.39,"paid_total":302672.39},{"slug":"eighty-380-commerce-park","name":"80/380 Commerce Park (Village Drive)","kind":"development_or_agreement","kind_label":"Development or agreement","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2017-05-02","last_date":"2026-04-07","last_activity":"2026-04-07","cost_figure":null,"cost_basis":"A developer's project: the city's obligations are tax-increment payments capped in the development agreements; the 2026 payment is a release of the developer's own escrow, not a city cost.","percent_complete":null,"summary":"Commercial development by 80/380, LLC / 80/380 Commerce Park, LLC (now The Villages, L.C.) along Village Drive: the 2017 Village Drive extension (RISE grant) and development agreement with tax increment payments, its 2025 amendments, plats of the First (2025) and Second (2026) Additions, and escrow agreements; the April 2026 payment of $370,736.86 was a partial release of the First Addition escrow.","events":26,"motions":23,"documents":45,"changes":1,"dissents":1,"source":"yaml","first_seen":"2017-05-02","last_seen":"2026-04-07","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":26,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"prairie-village","name":"Prairie Village / Prairie West","kind":"development_or_agreement","kind_label":"Development or agreement","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2013-04-10","last_date":"2026-03-17","last_activity":"2026-03-17","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"Residential and commercial development west of town (Prairie Trail West, Prairie West Addition, Prairie Village parts one to three) with rezonings, plats, escrow agreements and developer's agreements with Iowa Development Group, Inc. A December 2024 rezoning of Prairie West lots (Ordinance 2024-517) failed.","events":150,"motions":140,"documents":177,"changes":15,"dissents":5,"source":"yaml","first_seen":"2013-04-10","last_seen":"2026-03-17","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":150,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"grove-park","name":"Grove Park","kind":"development_or_agreement","kind_label":"Development or agreement","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2018-07-05","last_date":"2026-03-03","last_activity":"2026-03-03","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"A planned development with rezonings (including Ordinance 2025-523) and plats, 2018-2026.","events":34,"motions":21,"documents":49,"changes":1,"dissents":0,"source":"yaml","first_seen":"2018-07-05","last_seen":"2026-03-03","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":34,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"sheriff-law-enforcement-contract","name":"Law enforcement contract with the Johnson County Sheriff","kind":"program_or_service","kind_label":"Program or service","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"1974-03-07","last_date":"2026-09-15","last_activity":"2026-02-17","cost_figure":1975375.87,"cost_basis":"paid on the payables lists since 2021","percent_complete":null,"summary":"Law enforcement has been contracted from the Johnson County Sheriff's Office since 1974, apart from a city police chief and a contract officer around 1978-1980 (the council appointed a Chief of Police in July 1978 and approved an individual law-enforcement contract in 1980). A 2021 needs assessment preceded the current five-year contract (approved November 2023, effective July 1, 2024 to June 30, 2029), whose annual sums rise from $429,680.16 (FY2024-25) to $1,177,023.12 (FY2028-29) as deputies are added.","events":110,"motions":26,"documents":152,"changes":2,"dissents":0,"source":"yaml","first_seen":"1974-03-07","last_seen":"2026-09-15","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":110,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"cca-joint-projects","name":"Joint projects with the Clear Creek Amana school district","kind":"development_or_agreement","kind_label":"Development or agreement","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":["water-sewer-extension-2014"],"first_date":"2000-08-09","last_date":"2026-02-17","last_activity":"2026-02-04","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"Agreements and shared projects with the Clear Creek Amana (CCA) school district: utilities to the school site (the 2014 water and sewer extension below), crossing guards, storm-water and right-of-way easements, shared use of gyms and ball fields, the shared library, and North Park Road easements.","events":51,"motions":45,"documents":59,"changes":4,"dissents":2,"source":"yaml","first_seen":"2000-08-09","last_seen":"2026-02-17","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":1,"change_orders":0,"links":51,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"sand-volleyball-courts","name":"Sand Volleyball Courts","kind":"capital_project","kind_label":"Capital project","category":"park","status":"under_construction","status_label":"Under construction","status_source":"derived","parent":{"slug":"parks-and-recreation-facilities","name":"City parks and recreation facilities"},"phase":"Sand volleyball","children":[],"first_date":"2025-09-02","last_date":"2025-12-02","last_activity":"2025-12-02","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":3,"motions":1,"documents":4,"changes":0,"dissents":0,"source":"yaml","first_seen":"2025-09-02","last_seen":"2025-12-02","funds":[],"contractors":["COURTS FORE SPORTS"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":1,"change_orders":0,"links":3,"finance_status":"inactive","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"tiffin-heights-west-watermain","name":"Tiffin Heights West Off-Site Public Improvements (water main)","kind":"capital_project","kind_label":"Capital project","category":"water","status":"under_construction","status_label":"Under construction","status_source":"derived","parent":{"slug":"tiffin-heights","name":"Tiffin Heights"},"phase":"West water main","children":[],"first_date":"2024-05-07","last_date":"2025-11-04","last_activity":"2025-11-04","cost_figure":884489.7,"cost_basis":"contract sum to date (pay applications)","percent_complete":null,"summary":null,"events":12,"motions":11,"documents":24,"changes":2,"dissents":0,"source":"yaml","first_seen":"2024-05-07","last_seen":"2025-11-04","funds":[],"contractors":["MAXWELL CONSTRUCTION"],"original":870652.6,"change_orders_total":0.0,"contract_to_date":884489.7,"paid_to_date":881593.7,"pay_applications":5,"change_orders":0,"links":12,"finance_status":"inactive","breakdown":{"contracts":1,"original":870652.6,"net_change":13837.1,"net_change_pct":0.0159,"current":884489.7,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":13837.7,"approved_not_booked":0.0,"paid_to_date":881593.7,"change_orders":0,"large_credits":[],"missing":[]},"co_net":13837.1,"co_pct":0.0159,"original_total":870652.6,"current_total":884489.7,"paid_total":881593.7},{"slug":"fire-pumper-truck","name":"Fire pumper truck (Sutphen)","kind":"capital_project","kind_label":"Capital project","category":null,"status":"complete","status_label":"Complete","status_source":"manual","parent":{"slug":"fire-department","name":"Tiffin Fire Department"},"phase":"Pumper truck","children":[],"first_date":"2023-05-16","last_date":"2026-01-20","last_activity":"2025-10-21","cost_figure":918653.67,"cost_basis":"paid on the payables lists","percent_complete":null,"summary":"A new Sutphen pumper truck for the fire department. The truck committee's change order was approved in May 2023; upfitting equipment was bought in 2025, the final payment of $830,698.15 to Sutphen Corporation was on the November 4, 2025 payables list (fund 330, Tiffin Firetruck), and the old engine was sold in October 2025.","events":16,"motions":5,"documents":19,"changes":1,"dissents":0,"source":"yaml","first_seen":"2023-05-16","last_seen":"2026-01-20","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":1,"links":16,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"well-5","name":"Well #5 (test well, pump, controls and water main)","kind":"capital_project","kind_label":"Capital project","category":"water","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2021-02-02","last_date":"2025-04-01","last_activity":"2025-04-01","cost_figure":335735.0,"cost_basis":"contract sum to date (pay applications)","percent_complete":0.979,"summary":"A fifth city water well in two contracts engineered by Veenstra & Kimm: the test well by Shawver Well Company (awarded 2021) and the pump, controls and water main by Boomerang Corp. (awarded 2022).","events":71,"motions":27,"documents":93,"changes":6,"dissents":0,"source":"yaml","first_seen":"2021-02-02","last_seen":"2025-04-01","funds":["607"],"contractors":["SHAWVER WELL COMPANY","BOOMERANG CORP"],"original":296015.0,"change_orders_total":44822.49,"contract_to_date":335735.0,"paid_to_date":1103712.0,"pay_applications":11,"change_orders":6,"links":71,"finance_status":"complete","breakdown":{"contracts":1,"original":296015.0,"net_change":39720.0,"net_change_pct":0.1342,"current":335735.0,"gross_increase":39720.0,"gross_decrease":0.0,"not_itemized":0.0,"approved_not_booked":0.0,"paid_to_date":312264.05,"change_orders":2,"large_credits":[],"missing":[]},"co_net":39720.0,"co_pct":0.1342,"original_total":296015.0,"current_total":335735.0,"paid_total":312264.05},{"slug":"jasper-forevergreen-roundabout","name":"Jasper Avenue / Forevergreen Road Roundabout (28E agreement)","kind":"infrastructure","kind_label":"Infrastructure","category":"street","status":"design","status_label":"Design","status_source":"manual","parent":null,"phase":null,"children":[],"first_date":"2021-10-05","last_date":"2025-02-18","last_activity":"2025-01-21","cost_figure":null,"cost_basis":"City cost share: not in the archive (a North Liberty project; Tiffin pays half under the 28E). The $525,000 is a legal-fee settlement, shown as an event.","percent_complete":null,"summary":"A roundabout at Jasper Avenue and Forevergreen Road built by North Liberty (designed by Shive-Hattery), with Tiffin paying half under a January 2025 28E agreement among North Liberty, Tiffin, Coralville and Johnson County. The same night the council approved a settlement of four lawsuits over the Forevergreen Road project, including a $525,000 reimbursement of the landowners' attorney fees.","events":5,"motions":4,"documents":11,"changes":0,"dissents":0,"source":"yaml","first_seen":"2021-10-05","last_seen":"2025-02-18","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":5,"finance_status":"inactive","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"sidewalk-to-soccer-fields","name":"Sidewalk Connection to Soccer Fields","kind":"capital_project","kind_label":"Capital project","category":"trail","status":"complete","status_label":"Complete","status_source":"derived","parent":{"slug":"tiffin-trail-system","name":"Trails and sidewalks"},"phase":"Soccer field sidewalk","children":[],"first_date":"2023-11-07","last_date":"2024-12-17","last_activity":"2024-12-17","cost_figure":64935.54,"cost_basis":"contract sum to date (pay applications)","percent_complete":1.0,"summary":null,"events":11,"motions":7,"documents":17,"changes":1,"dissents":0,"source":"yaml","first_seen":"2023-11-07","last_seen":"2024-12-17","funds":[],"contractors":["MCCOMAS-LACINA CONSTRUCTION"],"original":64935.54,"change_orders_total":0.0,"contract_to_date":64935.54,"paid_to_date":64935.54,"pay_applications":3,"change_orders":0,"links":11,"finance_status":"complete","breakdown":{"contracts":1,"original":64935.54,"net_change":0.0,"net_change_pct":0.0,"current":64935.54,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":0.0,"approved_not_booked":0.0,"paid_to_date":64935.54,"change_orders":0,"large_credits":[],"missing":[]},"co_net":0.0,"co_pct":0.0,"original_total":64935.54,"current_total":64935.54,"paid_total":64935.54},{"slug":"kimberlite-street-south","name":"Kimberlite Street – South Improvements","kind":"capital_project","kind_label":"Capital project","category":"street","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2024-01-23","last_date":"2024-11-05","last_activity":"2024-11-05","cost_figure":291751.35,"cost_basis":"paid on the payables lists","percent_complete":null,"summary":null,"events":29,"motions":11,"documents":38,"changes":0,"dissents":0,"source":"finance","first_seen":"2024-01-23","last_seen":"2024-11-05","funds":["337"],"contractors":["ALL AMERICAN CONCRETE"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":4,"change_orders":0,"links":29,"finance_status":"complete","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"library","name":"Springmier Community Library","kind":"program_or_service","kind_label":"Program or service","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"1977-06-28","last_date":"2026-08-05","last_activity":"2024-09-03","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"The public library Tiffin shares with the Clear Creek Amana school district in the school building at 311 W. Marengo Road, governed by a library board (Ordinance 2001-245) under 28E agreements with the district (latest Resolution 2024-003: the city pays $24,000 a year).","events":30,"motions":27,"documents":33,"changes":1,"dissents":2,"source":"yaml","first_seen":"1977-06-28","last_seen":"2026-08-05","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":30,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"comprehensive-plan","name":"Comprehensive Plan","kind":"plan_or_study","kind_label":"Plan or study","category":null,"status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2013-04-10","last_date":"2024-08-06","last_activity":"2024-08-06","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"The city's comprehensive plan, prepared by the East Central Iowa Council of Governments (ECICOG): contracted in 2013 ($10,758) with a citizen committee, updated and adopted in 2018 (Resolution 2018-048) with a horizon to 2030. A future land use map was reviewed in 2024.","events":12,"motions":11,"documents":11,"changes":1,"dissents":2,"source":"yaml","first_seen":"2013-04-10","last_seen":"2024-08-06","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":12,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"potter-creek-interceptor","name":"Potter Creek Interceptor Sewer","kind":"capital_project","kind_label":"Capital project","category":"sewer","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2021-07-20","last_date":"2024-11-05","last_activity":"2024-07-02","cost_figure":1076377.4,"cost_basis":"contract sum to date (pay applications)","percent_complete":1.0502,"summary":"A sanitary sewer interceptor along Potter Creek, engineered by Hart-Frederick. The first award was denied in March 2023 and the project re-bid; Boomerang Corp. was awarded the contract in June 2023, partly funded with ARPA money (Resolution 2023-012). Accepted in July 2024.","events":31,"motions":20,"documents":51,"changes":3,"dissents":0,"source":"yaml","first_seen":"2021-07-20","last_seen":"2024-11-05","funds":["617"],"contractors":["BOOMERANG CORP"],"original":1067837.6,"change_orders_total":8539.8,"contract_to_date":1076377.4,"paid_to_date":1130450.4,"pay_applications":5,"change_orders":3,"links":31,"finance_status":"complete","breakdown":{"contracts":1,"original":1067837.6,"net_change":8539.8,"net_change_pct":0.008,"current":1076377.4,"gross_increase":11539.8,"gross_decrease":-3000.0,"not_itemized":0.0,"approved_not_booked":0.0,"paid_to_date":1130450.4,"change_orders":3,"large_credits":[],"missing":[]},"co_net":8539.8,"co_pct":0.008,"original_total":1067837.6,"current_total":1076377.4,"paid_total":1130450.4},{"slug":"zoning-code-amendments","name":"Zoning and subdivision code amendments","kind":"policy","kind_label":"Policy","category":null,"status":"ongoing","status_label":"Ongoing","status_source":"manual","parent":null,"phase":null,"children":[],"first_date":"2012-06-13","last_date":"2023-12-05","last_activity":"2023-12-05","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"Text amendments to the zoning ordinance (Ordinance 2007-287 as amended) and the subdivision ordinance, as distinct from map rezonings: storage, home occupations, apartments, the planned development overlay (OPD), signs, setbacks, fences and other sections, mostly 2013-2023.","events":92,"motions":92,"documents":81,"changes":7,"dissents":6,"source":"yaml","first_seen":"2012-06-13","last_seen":"2023-12-05","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":92,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"woodfield-ridge","name":"Woodfield Ridge","kind":"development_or_agreement","kind_label":"Development or agreement","category":null,"status":"unknown","status_label":"Unknown","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2007-03-21","last_date":"2023-10-17","last_activity":"2023-10-17","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"A residential subdivision platted in parts (parts three to seven, 2013-2021) with subdivision and escrow agreements.","events":27,"motions":27,"documents":35,"changes":0,"dissents":0,"source":"yaml","first_seen":"2007-03-21","last_seen":"2023-10-17","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":27,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"public-works-building","name":"Public Works Building","kind":"capital_project","kind_label":"Capital project","category":"building","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2021-11-02","last_date":"2023-11-07","last_activity":"2023-08-08","cost_figure":2579695.56,"cost_basis":"contract sum to date (pay applications)","percent_complete":0.6664,"summary":"A new public works building designed by Martin Gardner Architecture. Woodruff Construction was the low of seven bidders at $2,552,000 (December 2021); the final pay estimate was approved in August 2023.","events":53,"motions":24,"documents":63,"changes":2,"dissents":0,"source":"yaml","first_seen":"2021-11-02","last_seen":"2023-11-07","funds":["336"],"contractors":["WOODRUFF CONSTRUCTION"],"original":2552000.0,"change_orders_total":27695.56,"contract_to_date":2579695.56,"paid_to_date":1633213.93,"pay_applications":15,"change_orders":0,"links":53,"finance_status":"complete","breakdown":{"contracts":1,"original":2552000.0,"net_change":27695.56,"net_change_pct":0.0109,"current":2579695.56,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":27695.56,"approved_not_booked":0.0,"paid_to_date":1633213.93,"change_orders":0,"large_credits":[],"missing":[]},"co_net":27695.56,"co_pct":0.0109,"original_total":2552000.0,"current_total":2579695.56,"paid_total":1633213.93},{"slug":"original-town-phase-2","name":"Original Town Urbanization – Phase Two","kind":"capital_project","kind_label":"Capital project","category":"street","status":"complete","status_label":"Complete","status_source":"derived","parent":{"slug":"original-town-urbanization","name":"Original Town Urbanization"},"phase":"Phase 2","children":[],"first_date":"2020-03-24","last_date":"2023-08-08","last_activity":"2023-08-08","cost_figure":2067336.93,"cost_basis":"contract sum to date (pay applications)","percent_complete":1.0,"summary":null,"events":76,"motions":49,"documents":93,"changes":22,"dissents":0,"source":"yaml","first_seen":"2020-03-24","last_seen":"2023-08-08","funds":["321"],"contractors":["RATHJE CONSTRUCTION","NOLAN'S LAWN CARE"],"original":1840593.96,"change_orders_total":226742.97,"contract_to_date":2067336.93,"paid_to_date":2066537.93,"pay_applications":18,"change_orders":17,"links":76,"finance_status":"inactive","breakdown":{"contracts":2,"original":1840593.96,"net_change":226742.97,"net_change_pct":0.1232,"current":2067336.93,"gross_increase":131067.72,"gross_decrease":-10000.0,"not_itemized":105674.35,"approved_not_booked":0.0,"paid_to_date":2066537.93,"change_orders":17,"large_credits":[],"missing":[{"contractor":"RATHJE CONSTRUCTION","numbers":[5]}]},"co_net":226742.97,"co_pct":0.1232,"original_total":1840593.96,"current_total":2067336.93,"paid_total":2066537.93},{"slug":"trail-phase-6","name":"Tiffin Trail – Phase 6","kind":"capital_project","kind_label":"Capital project","category":"trail","status":"complete","status_label":"Complete","status_source":"derived","parent":{"slug":"tiffin-trail-system","name":"Trails and sidewalks"},"phase":"Phase 6","children":[],"first_date":"2021-05-04","last_date":"2023-03-07","last_activity":"2022-10-18","cost_figure":88635.76,"cost_basis":"contract sum to date (pay applications)","percent_complete":0.956,"summary":null,"events":15,"motions":4,"documents":17,"changes":2,"dissents":0,"source":"yaml","first_seen":"2021-05-04","last_seen":"2023-03-07","funds":["310"],"contractors":["VIETH CONSTRUCTION CORP"],"original":89588.5,"change_orders_total":-952.74,"contract_to_date":88635.76,"paid_to_date":84739.1,"pay_applications":2,"change_orders":2,"links":15,"finance_status":"complete","breakdown":{"contracts":1,"original":89588.5,"net_change":-952.74,"net_change_pct":-0.0106,"current":88635.76,"gross_increase":2138.0,"gross_decrease":0.0,"not_itemized":-3090.74,"approved_not_booked":0.0,"paid_to_date":84739.1,"change_orders":2,"large_credits":[],"missing":[]},"co_net":-952.74,"co_pct":-0.0106,"original_total":89588.5,"current_total":88635.76,"paid_total":84739.1},{"slug":"trail-phase-7","name":"Tiffin Trail – Phase 7","kind":"capital_project","kind_label":"Capital project","category":"trail","status":"complete","status_label":"Complete","status_source":"derived","parent":{"slug":"tiffin-trail-system","name":"Trails and sidewalks"},"phase":"Phase 7","children":[],"first_date":"2020-09-01","last_date":"2023-03-07","last_activity":"2022-09-06","cost_figure":269835.84,"cost_basis":"contract sum to date (pay applications)","percent_complete":1.0622,"summary":null,"events":25,"motions":13,"documents":35,"changes":0,"dissents":0,"source":"yaml","first_seen":"2020-09-01","last_seen":"2023-03-07","funds":["310"],"contractors":["CARTER & ASSOCIATES"],"original":269835.84,"change_orders_total":0.0,"contract_to_date":269835.84,"paid_to_date":284608.24,"pay_applications":6,"change_orders":0,"links":25,"finance_status":"inactive","breakdown":{"contracts":1,"original":269835.84,"net_change":0.0,"net_change_pct":0.0,"current":269835.84,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":0.0,"approved_not_booked":0.0,"paid_to_date":284608.24,"change_orders":0,"large_credits":[],"missing":[]},"co_net":0.0,"co_pct":0.0,"original_total":269835.84,"current_total":269835.84,"paid_total":284608.24},{"slug":"original-town-phase-1","name":"Original Town Urbanization – Phase One","kind":"capital_project","kind_label":"Capital project","category":"street","status":"complete","status_label":"Complete","status_source":"derived","parent":{"slug":"original-town-urbanization","name":"Original Town Urbanization"},"phase":"Phase 1","children":[],"first_date":"2018-05-01","last_date":"2022-07-05","last_activity":"2022-07-05","cost_figure":1199014.49,"cost_basis":"contract sum to date (pay applications)","percent_complete":1.0928,"summary":null,"events":32,"motions":25,"documents":37,"changes":9,"dissents":0,"source":"yaml","first_seen":"2018-05-01","last_seen":"2022-07-05","funds":["321"],"contractors":["LL PELLING"],"original":1062008.0,"change_orders_total":137006.49,"contract_to_date":1199014.49,"paid_to_date":1310233.78,"pay_applications":8,"change_orders":5,"links":32,"finance_status":"complete","breakdown":{"contracts":1,"original":1062008.0,"net_change":137006.49,"net_change_pct":0.129,"current":1199014.49,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":137006.49,"approved_not_booked":0.0,"paid_to_date":1310233.78,"change_orders":5,"large_credits":[],"missing":[{"contractor":"LL PELLING","numbers":[3,4,5]}]},"co_net":137006.49,"co_pct":0.129,"original_total":1062008.0,"current_total":1199014.49,"paid_total":1310233.78},{"slug":"permeable-pavers","name":"Permeable Paver Parking Project","kind":"capital_project","kind_label":"Capital project","category":"street","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2020-11-17","last_date":"2022-06-21","last_activity":"2022-06-07","cost_figure":387231.35,"cost_basis":"contract sum to date (pay applications)","percent_complete":1.0,"summary":null,"events":30,"motions":14,"documents":40,"changes":3,"dissents":0,"source":"finance","first_seen":"2020-11-17","last_seen":"2022-06-21","funds":["343"],"contractors":["NOLAN'S LAWN CARE"],"original":294724.66,"change_orders_total":92506.69,"contract_to_date":387231.35,"paid_to_date":387231.35,"pay_applications":7,"change_orders":3,"links":30,"finance_status":"complete","breakdown":{"contracts":1,"original":294724.66,"net_change":92506.69,"net_change_pct":0.3139,"current":387231.35,"gross_increase":92106.69,"gross_decrease":0.0,"not_itemized":400.0,"approved_not_booked":0.0,"paid_to_date":387231.35,"change_orders":2,"large_credits":[],"missing":[]},"co_net":92506.69,"co_pct":0.3139,"original_total":294724.66,"current_total":387231.35,"paid_total":387231.35},{"slug":"roundabout-park-road-hwy6","name":"Tiffin Roundabout (Park Road / Highway 6, STP-A-006-7(90)--22-52)","kind":"capital_project","kind_label":"Capital project","category":"street","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2019-03-05","last_date":"2022-06-21","last_activity":"2022-05-03","cost_figure":3255700.6,"cost_basis":"contract sum to date (pay applications)","percent_complete":1.0136,"summary":null,"events":34,"motions":24,"documents":36,"changes":9,"dissents":0,"source":"finance","first_seen":"2019-03-05","last_seen":"2022-06-21","funds":["320"],"contractors":["RATHJE CONSTRUCTION"],"original":3041340.31,"change_orders_total":6631.24,"contract_to_date":3255700.6,"paid_to_date":3299925.03,"pay_applications":13,"change_orders":9,"links":34,"finance_status":"complete","breakdown":{"contracts":1,"original":3041340.31,"net_change":214360.29,"net_change_pct":0.0705,"current":3255700.6,"gross_increase":6631.24,"gross_decrease":0.0,"not_itemized":207729.05,"approved_not_booked":0.0,"paid_to_date":3299925.03,"change_orders":7,"large_credits":[],"missing":[{"contractor":"RATHJE CONSTRUCTION","numbers":[4,8]}]},"co_net":214360.29,"co_pct":0.0705,"original_total":3041340.31,"current_total":3255700.6,"paid_total":3299925.03},{"slug":"roberts-ferry-road-reconstruction","name":"Roberts Ferry Road Reconstruction","kind":"capital_project","kind_label":"Capital project","category":"street","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2018-02-20","last_date":"2021-07-20","last_activity":"2021-07-20","cost_figure":1455350.12,"cost_basis":"contract sum to date (pay applications)","percent_complete":0.9685,"summary":null,"events":33,"motions":28,"documents":39,"changes":5,"dissents":3,"source":"finance","first_seen":"2018-02-20","last_seen":"2021-07-20","funds":["312"],"contractors":["VIETH CONSTRUCTION CORP"],"original":1455350.12,"change_orders_total":0.0,"contract_to_date":1455350.12,"paid_to_date":1409574.25,"pay_applications":12,"change_orders":4,"links":33,"finance_status":"complete","breakdown":{"contracts":1,"original":1455350.12,"net_change":0.0,"net_change_pct":0.0,"current":1455350.12,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":0.0,"approved_not_booked":0.0,"paid_to_date":1409574.25,"change_orders":4,"large_credits":[],"missing":[{"contractor":"VIETH CONSTRUCTION CORP","numbers":[2,5,6]}]},"co_net":0.0,"co_pct":0.0,"original_total":1455350.12,"current_total":1455350.12,"paid_total":1409574.25},{"slug":"soccer-field-parking-lot","name":"Soccer Field Parking Lot Expansion","kind":"capital_project","kind_label":"Capital project","category":"park","status":"complete","status_label":"Complete","status_source":"derived","parent":{"slug":"parks-and-recreation-facilities","name":"City parks and recreation facilities"},"phase":"Soccer field parking","children":[],"first_date":"2019-03-19","last_date":"2021-04-06","last_activity":"2021-04-06","cost_figure":302908.39,"cost_basis":"contract sum to date (pay applications)","percent_complete":0.9992,"summary":null,"events":10,"motions":9,"documents":14,"changes":3,"dissents":0,"source":"yaml","first_seen":"2019-03-19","last_seen":"2021-04-06","funds":["310","333"],"contractors":["LL PELLING"],"original":302908.39,"change_orders_total":0.0,"contract_to_date":302908.39,"paid_to_date":302672.39,"pay_applications":2,"change_orders":1,"links":10,"finance_status":"complete","breakdown":{"contracts":1,"original":302908.39,"net_change":0.0,"net_change_pct":0.0,"current":302908.39,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":0.0,"approved_not_booked":0.0,"paid_to_date":302672.39,"change_orders":1,"large_credits":[],"missing":[]},"co_net":0.0,"co_pct":0.0,"original_total":302908.39,"current_total":302908.39,"paid_total":302672.39},{"slug":"roundabout-gateway-signage","name":"Roundabout Gateway Signage","kind":"capital_project","kind_label":"Capital project","category":"street","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2020-10-06","last_date":"2021-04-06","last_activity":"2021-04-06","cost_figure":12720.0,"cost_basis":"contract sum to date (pay applications)","percent_complete":1.0,"summary":null,"events":8,"motions":7,"documents":11,"changes":1,"dissents":0,"source":"yaml","first_seen":"2020-10-06","last_seen":"2021-04-06","funds":[],"contractors":["NOLAN'S LAWN CARE"],"original":11800.0,"change_orders_total":920.0,"contract_to_date":12720.0,"paid_to_date":12720.0,"pay_applications":1,"change_orders":1,"links":8,"finance_status":"complete","breakdown":{"contracts":1,"original":11800.0,"net_change":920.0,"net_change_pct":0.078,"current":12720.0,"gross_increase":920.0,"gross_decrease":0.0,"not_itemized":0.0,"approved_not_booked":0.0,"paid_to_date":12720.0,"change_orders":1,"large_credits":[],"missing":[]},"co_net":920.0,"co_pct":0.078,"original_total":11800.0,"current_total":12720.0,"paid_total":12720.0},{"slug":"wwtp-phase-2","name":"Wastewater Treatment Plant Expansion – Phase Two","kind":"capital_project","kind_label":"Capital project","category":"sewer","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2017-09-05","last_date":"2021-08-17","last_activity":"2021-01-19","cost_figure":5798931.95,"cost_basis":"contract sum to date (pay applications)","percent_complete":1.0018,"summary":null,"events":45,"motions":41,"documents":47,"changes":9,"dissents":0,"source":"finance","first_seen":"2017-09-05","last_seen":"2021-08-17","funds":["614"],"contractors":["PORTZEN CONSTRUCTION"],"original":5685007.75,"change_orders_total":112924.0,"contract_to_date":5798931.95,"paid_to_date":5809635.72,"pay_applications":22,"change_orders":8,"links":45,"finance_status":"complete","breakdown":{"contracts":1,"original":5685007.75,"net_change":112924.0,"net_change_pct":0.0199,"current":5798931.95,"gross_increase":0.0,"gross_decrease":0.0,"not_itemized":113924.2,"approved_not_booked":0.0,"paid_to_date":5809635.72,"change_orders":8,"large_credits":[],"missing":[{"contractor":"PORTZEN CONSTRUCTION","numbers":[8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39,40,41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,56,57,58,59,60,61,62,63,64,65,66,67,68,69,70,71,72,73,74,75,76,77,78,79,80,81,82,83,84,85,86,87,88,89,90,91,92,93,94,95]}]},"co_net":112924.0,"co_pct":0.0199,"original_total":5685007.75,"current_total":5798931.95,"paid_total":5809635.72},{"slug":"park-road-paving-2019","name":"2019 Park Road Paving Project","kind":"capital_project","kind_label":"Capital project","category":"street","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2019-03-19","last_date":"2021-03-05","last_activity":"2020-11-17","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":16,"motions":15,"documents":16,"changes":2,"dissents":0,"source":"finance","first_seen":"2019-03-19","last_seen":"2021-03-05","funds":["307"],"contractors":["(contractor not named)"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":3,"change_orders":2,"links":16,"finance_status":"complete","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"ireland-hwy6-traffic-signals","name":"Traffic Signals – Ireland Avenue/Roberts Ferry Road and Highway 6/Marengo Road","kind":"capital_project","kind_label":"Capital project","category":"street","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2018-04-03","last_date":"2021-10-05","last_activity":"2020-11-03","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":21,"motions":17,"documents":21,"changes":2,"dissents":0,"source":"finance","first_seen":"2018-04-03","last_seen":"2021-10-05","funds":["322"],"contractors":["PRICE INDUSTRIAL"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":6,"change_orders":2,"links":21,"finance_status":"complete","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"forevergreen-road-2019","name":"2019 Improvements – Forevergreen Road","kind":"capital_project","kind_label":"Capital project","category":"street","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2018-06-18","last_date":"2020-10-20","last_activity":"2020-10-20","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":26,"motions":26,"documents":20,"changes":6,"dissents":0,"source":"yaml","first_seen":"2018-06-18","last_seen":"2020-10-20","funds":["335"],"contractors":["STREB CONSTRUCTION"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":5,"change_orders":3,"links":26,"finance_status":"complete","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"stormwater-rehabilitation-2019","name":"2019 Storm Water Rehabilitation Projects","kind":"capital_project","kind_label":"Capital project","category":"storm","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2019-03-19","last_date":"2020-06-16","last_activity":"2020-06-16","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":14,"motions":14,"documents":12,"changes":3,"dissents":0,"source":"finance","first_seen":"2019-03-19","last_seen":"2020-06-16","funds":[],"contractors":["TRIPLE B CONSTRUCTION"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":6,"change_orders":3,"links":14,"finance_status":"complete","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"deer-view-hwy6-signal","name":"Deer View / Highway 6 Traffic Signalization","kind":"capital_project","kind_label":"Capital project","category":"street","status":"unknown","status_label":"Unknown","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2019-12-03","last_date":"2023-08-08","last_activity":"2019-12-03","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":10,"motions":1,"documents":10,"changes":1,"dissents":0,"source":"finance","first_seen":"2019-12-03","last_seen":"2023-08-08","funds":["329"],"contractors":["PRICE INDUSTRIAL"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":1,"links":10,"finance_status":"inactive","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"ireland-avenue-south","name":"Ireland Avenue Project (south)","kind":"capital_project","kind_label":"Capital project","category":"street","status":"unknown","status_label":"Unknown","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2014-09-10","last_date":"2018-08-07","last_activity":"2018-08-07","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":49,"motions":49,"documents":39,"changes":12,"dissents":4,"source":"finance","first_seen":"2014-09-10","last_seen":"2018-08-07","funds":[],"contractors":["RATHJE CONSTRUCTION"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":19,"change_orders":11,"links":49,"finance_status":"inactive","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"water-sewer-extension-2014","name":"2014 Water and Sewer Extension Project (CCA schools)","kind":"capital_project","kind_label":"Capital project","category":"water","status":"complete","status_label":"Complete","status_source":"derived","parent":{"slug":"cca-joint-projects","name":"Joint projects with the Clear Creek Amana school district"},"phase":"2014 water and sewer extension","children":[],"first_date":"2014-06-25","last_date":"2018-07-17","last_activity":"2018-07-17","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":52,"motions":51,"documents":47,"changes":9,"dissents":0,"source":"yaml","first_seen":"2014-06-25","last_seen":"2018-07-17","funds":[],"contractors":["(contractor not named)","MAXWELL CONSTRUCTION","CORNERSTONE EXCAVATING","KMA TRUCKING & EXCAVATING","WRH INC"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":19,"change_orders":9,"links":52,"finance_status":"inactive","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"parks-recreation-improvements-phase-1","name":"Parks and Recreation Improvement Plan – Phase 1","kind":"capital_project","kind_label":"Capital project","category":"park","status":"unknown","status_label":"Unknown","status_source":"derived","parent":{"slug":"parks-and-recreation-facilities","name":"City parks and recreation facilities"},"phase":"Improvement plan phase 1","children":[],"first_date":"2016-03-08","last_date":"2018-05-15","last_activity":"2018-05-15","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":15,"motions":14,"documents":11,"changes":1,"dissents":0,"source":"yaml","first_seen":"2016-03-08","last_seen":"2018-05-15","funds":[],"contractors":["WOODRUFF CONSTRUCTION"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":8,"change_orders":1,"links":15,"finance_status":"inactive","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"sanitary-sewer-i-and-i-2016","name":"Original Town Sanitary Sewer Inflow & Infiltration Reduction","kind":"capital_project","kind_label":"Capital project","category":"sewer","status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2016-01-19","last_date":"2017-05-16","last_activity":"2017-05-16","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":24,"motions":24,"documents":20,"changes":4,"dissents":0,"source":"finance","first_seen":"2016-01-19","last_seen":"2017-05-16","funds":[],"contractors":["SULZCO LLC"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":16,"change_orders":4,"links":24,"finance_status":"complete","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"capital-improvement-project-2013","name":"2013 Capital Improvement Project","kind":"capital_project","kind_label":"Capital project","category":null,"status":"complete","status_label":"Complete","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2013-02-27","last_date":"2015-12-09","last_activity":"2015-12-09","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":"A 2013 street and utility capital improvement project: hearing and letting set in February-March 2013, plans adopted (Resolution 2013-050), change orders through 2014, and final completion and acceptance in December 2015 (Resolution 2015-134). Found by the discovery pass and curated.","events":8,"motions":8,"documents":9,"changes":1,"dissents":2,"source":"yaml","first_seen":"2013-02-27","last_seen":"2015-12-09","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":1,"links":8,"breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"jasper-ave-watermain","name":"Jasper Avenue Watermain Extension","kind":"capital_project","kind_label":"Capital project","category":"water","status":"unknown","status_label":"Unknown","status_source":"derived","parent":null,"phase":null,"children":[],"first_date":"2013-08-28","last_date":"2014-06-25","last_activity":"2014-06-25","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":14,"motions":14,"documents":11,"changes":1,"dissents":1,"source":"finance","first_seen":"2013-08-28","last_seen":"2014-06-25","funds":[],"contractors":[],"original":null,"change_orders_total":null,"contract_to_date":null,"paid_to_date":null,"pay_applications":0,"change_orders":0,"links":14,"finance_status":"inactive","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null},{"slug":"trails-phase-4","name":"Trails Phase Four","kind":"capital_project","kind_label":"Capital project","category":"trail","status":"complete","status_label":"Complete","status_source":"derived","parent":{"slug":"tiffin-trail-system","name":"Trails and sidewalks"},"phase":"Phase 4","children":[],"first_date":"2011-02-09","last_date":"2012-09-26","last_activity":"2012-09-26","cost_figure":null,"cost_basis":null,"percent_complete":null,"summary":null,"events":7,"motions":7,"documents":7,"changes":1,"dissents":0,"source":"yaml","first_seen":"2011-02-09","last_seen":"2012-09-26","funds":[],"contractors":["METRO PAVERS"],"original":null,"change_orders_total":0.0,"contract_to_date":null,"paid_to_date":null,"pay_applications":3,"change_orders":1,"links":7,"finance_status":"inactive","breakdown":null,"co_net":null,"co_pct":null,"original_total":null,"current_total":null,"paid_total":null}]}